diversion discharge 中文意思是什麼

diversion discharge 解釋
分流流量
  • diversion : n. 1. 轉換,轉移,轉向;(河流、航線等的)改道;(資金等的)挪用;〈英國〉(因修路等車輛)繞行,繞路。2. 消遣,娛樂。3. 【軍事】箝制,佯攻。
  • discharge : vt 1 發射(炮等),打(槍),射(箭)。2 起,卸(貨)。3 排泄,排出,放出(水等)。4 釋放;解除,...
  1. Tashan weir, now still in good condition after 1100 years of weather beating and storm whipping, has played the role of seawater holdback, fresh water conservancy, water diversion and discharge

    它山堰是全國重點文物保護單位,歷經1100餘年風霜雨雪水和洪水沖擊,至今仍基本完好,繼續發揮著阻咸、蓄淡、引水、泄洪的作用。
  2. Using a vortex - flow drop shaft to convey water from a high level to a diversion runnel under the condition of high water - head and large discharge is a new kind of technology in the scheme of reusing a diversion tunnel as a discharge tunnel

    近年來,為解決高水頭、大流量導流洞改建泄洪洞的技術難題,旋流式豎井泄洪洞逐漸成為研究熱點之一。但迄今為止,該技術尚未得到推廣應用,其主要原因在於人們對豎井螺旋水流運動特徵缺乏足夠的了解和深入的研究。
  3. The structure of jinping cascade 2 hydropower station is a high - head and high discharge diversion tunnel with low crown gate

    錦屏二級水電站是一首部設低閘,採用長隧洞引水的高水頭、大流量的引水式電站。
  4. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施工導流建築物的等級、水工布置。通過水力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝水利樞紐工程採用圍堰擋汛后時段洪水導流方案的合理性和經濟性,為施工決策提供理論依據。
  5. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體填築與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石壩均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地區修建大型面板堆石壩的成功記錄,解決了一系列國內外均無先例的難題。
  6. By analyzing risk sources and those uncertain factors affecting the risk, the diversion risk is defined as the probability of the maximum discharge after being adjusted and held higher than the maximum design flood

    通過對導流風險來源和引起導流風險的各種不確定性因素的論述和分析,把施工導流風險定義為天然來(洪)水經過調蓄后,導流泄水建築物的最大泄水流量超過其設計最大泄水能力的概率。
  7. Analysis of pressured diversion system with irrigation discharge branch tunnel of stone river reservoir

    石頭河水庫灌溉支洞對發電引水系統的影響分析
  8. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽水電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、水頭超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩建設中泄水建築物的高速水流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展水工水力學的研究與發展均具有重要的理論與實踐意義。
  9. As a kind of important hydraulic structure, hydraulic tunnel is very useful at many aspects such as conveyance, diversion and flood discharge

    水工隧洞作為一種重要的水工建築物,在輸水、導流及泄洪等方面起著重要的作用。
  10. The change of discharge and diversion ratio of the main junction is calculated by the 1 - d model, and the influence of the engineering on the whole pearl river delta networks is analyzed

    同時利用一維數模計算工程后水面線及河網主要節點流量和分流比的變化,從整體的角度分析工程對整個珠江三角洲流域的影響。
  11. Reservoirs, dams, water inlet, water diversion tunnels ( including branch tunnels, water diversion canals, voltage adjustment wells ( towers ), open - air high - voltage conduits, premises, water discharge canals, communications facilities between premises and dams and other related ancillary equipment used by hydropower stations

    (三) 、水力發電廠使用的水庫、大壩、取水口、引水隧洞(含支洞口) 、引水渠道、調壓井(塔) 、露天高壓管道、廠房、尾水渠、廠房與大壩間的通訊設施及附屬設施。
  12. Abstract : for high arch dams in valleys with the characteristics of high water head, large discharge and large power, the problems of energy dissipation and scour prevention are serious. based on scientific studies, new comprehensive measures are proposed, including dispersion of discharge to waken wallop of the current, and reinforcement of riverbed to enhance the erosion - resistance. the measures can be used to solve the problem of energy dissipation properly. a typical layout scheme has been proposed in which slotted bucket with diversion teeth, double deck with pores, and cushion pool are considered practice has proved that the scheme is reliable and the effect of energy dissipation is obvious

    文摘:高拱壩泄洪消能的特點是壩高落差大,流量大,功率大,位於河谷狹窄地區,泄洪消能與防沖問題突出.經科學研究,採用「分散泄洪,削弱水流沖擊力,加固河床,增強河道抗沖能力」的綜合治理措施,較好地解決泄洪消能布置問題.提出了表孔大差動坎加分流齒、雙層多孔、水流撞擊、下設水墊塘聯合消能的典型布置方案,經實踐證明,方案可靠,消能效果好
  13. The design of the downstream water supply during the construction of yunlong reservoir is presented, in which the problem from the downstream water supply during the construction period of the flood discharge tunnel, the main dam, the initial impoundment of the reservoir and the locking - up of the diversion tunnel is solved satisfactorily with simple construction method, and then the water supply is guaranteed with better social and economic benefit

    摘要著重介紹雲龍水庫施工期下游供水設計,根據工程特點,較好地解決泄洪導流隧洞施工期、大壩施工期、水庫蓄水、導流隧洞封堵施工期等下游供水問題,施工方法簡單,確保了下游供水,取得了較好的社會和經濟效益。
  14. This article mainly describes the design conditions, diversion procedure and discharge frequency in the construction diversion of the longkou water control project, as well as its hydraulic calculation in stage diversion, structural style of the cofferdam and the closure design

    摘要主要介紹了黃河龍口樞紐工程施工導流的設計條件、導流方式及導流標準、流量,詳細敘述了分期導流的水力計算,圍堰結構型式及截流設計。
  15. Firstly in the paper the research of hydraulic characters and the optimize of structure have being carried out on the four bigger design schemes of permanent internal dissipation discharge tunnel reconstructed from the right bank ' s diversion tunnel of gongboxia power station with a method of theoretical analysis combined with test comparisons. on this basis, two form swirling flow internal dissipation schemes, vertical and horizontal axis are recommended to the construction unit of the station as the schemes to be selected next

    本文採取理論分析與試驗比較相結合的方法,首先對黃河公伯峽水電站右岸導流洞改建為永久式內消能泄洪洞的四個較大設計方案進行了水力特性的試驗研究與體型優化,在此基礎上,向建設單位分別提供了豎井旋流內消能的推薦方案與水平旋流內消能的推薦方案。
  16. Adaptability of dam filling with season and coordination among construction diversion, flood discharge and the whole construction schedule should be taken into consideration. the choose of dam site, layout of the multipurpose project, design of concrete faced rockfill dam, construction and prototype observation are covered in this paper

    如在混凝土面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體填築與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石壩均有其獨特之處。
分享友人