diversion works 中文意思是什麼

diversion works 解釋
導流工程
  • diversion : n. 1. 轉換,轉移,轉向;(河流、航線等的)改道;(資金等的)挪用;〈英國〉(因修路等車輛)繞行,繞路。2. 消遣,娛樂。3. 【軍事】箝制,佯攻。
  • works : 的印表機描述格式
  1. Analysis of aqueduct body cracks for zhaoshandu diversion works

    標渡槽槽身裂縫分析
  2. Design of diversion works of mianhuatan hydropower station

    棉花灘水電站施工導流設計
  3. Water main diversion works

    總水管改道工程
  4. Watermain diversion works

    輸水管改移工程
  5. Total system flow regulation in long distance water diversion works with multistage pump stations

    長距離多級泵站引水工程全系統流量調節
  6. The light rail track diversion works were carried out to facilitate the light rail grade separation works at pui to road

    輕鐵路軌改道工程是配合杯渡路架空輕鐵路軌工程而進行,以便騰出空間興建輕鐵高架橋。
  7. Erosion action of erosion media on concrete is easily occurred in hydraulic structure diversion works and immersed underground structure

    侵蝕介質對砼的侵蝕作用,易發生在水工建築、引水工程以及浸沒在地下水位以下的各種砼的地下構築物中。
  8. A pedestrian crossing west of pui to stop that had been closed to make way for light rail track diversion works was reopened on 14 june, allowing passengers to travel between platforms on both sides of the tracks

    較早前因進行輕鐵路軌改道工程而臨時封閉,位於杯渡站以西的行人過路處已於六月十四日重開,方便乘客來往兩邊月臺。
  9. The footbridge linking the tuen mun town park and trend plaza has been demolished and a temporary replacement footbridge opened on 4 march 2002. piling works near pui to light rail stop are now underway. track diversion works will be implemented later

    至於其他路段,現正進行壓土工程,預期於六月底前壓土工程可全部完成,而車站及路軌工程將于壓土工程完成後,陸續開始施工。
  10. Through checking computations, it was shown that the analogue accuracy of the model was quite high, which can provide important basis for scientific decision - making on engineering measures. through analogue calculation and analysis of many regulation schemes, it was shown that combining the diversion weir works with the bed fixing works at the south branch is reasonable and feasible in the implementation of loushuikouzi river regulation works. in addition, it is suggested that the bed fixing works at the south branch should adopt the improved compound section scheme

    經對多個整治方案的模擬計算與分析,表明漏水口子河道整治採用分流魚嘴工程和南汊固床工程相結合的整治工程措施是合理可行的,通過模型計算研究還提出了南汊固床工程採用復式斷面形式的改進方案建議,該方案保證了南汊枯期通航和不斷流,而且對南汊及撫遠鎮的保護具有正面作用。
  11. Some countermeasures are developed against these problems : ( 1 ) building water diversion works from other river basin under a comprehensive program ; ( 2 ) strengthening the measures of local sewage treatment and other place sewage control ; ( 3 ) raising water productivity by using water - saving techniques ; and ( 4 ) improving the management of water use

    針對這些問題提出了若干對策: ( 1 )認真搞好供水規劃,積極爭取外調水; ( 2 )加大污水治理力度,包括上游來水的水質控制; ( 3 )搞好節水規劃,提高工農業用水的利用效率; ( 4 )健全和理順水管理體制。
  12. Since its foundation in 1995, depending on the experts and scholars from many universities and research institutes and with the support of numerous clients and from various social organizations, hyw company has completed the translation and interpretation of more than 100 state - level major construction projects such as gezhouba key water control project, yellow - river diversion works and west to east gas pipeline project

    本公司創辦的中國專家翻譯網每日瀏覽量在3萬次以上,居同行之首,匯聚專業翻譯人才近萬名。自1995年創建以來,完成了葛洲壩水利樞紐工程萬家寨引黃工程西氣東輸項目奧運體育場館等300多個國家級重大工程項目的翻譯工作。
  13. The numerical simulation for adjustable - blade pump on - line autoregulation in diversion works has been studied in this paper whose background is modification works of dongjiang - shengzhen diversion works. the problems include autoregulation on water height of the fore bay in single pump station, autoregulation on output of adjustable - blade pump in single pump station, and autoregulation on flow equation of multilevel pump stations

    本論文以東江深圳供水改造工程為背景,對輸水工程中應用轉槳泵進行在線自動調節數字模擬進行了研究,其中包括單級泵站中對前池水位進行自動調節,單級泵站中對轉槳泵的輸出流量進行自動調節,以及多級泵站輸水系統流量平衡自動調節。
  14. Associated drainage, street lighting, landscaping, watermain diversion, retaining walls and slope works, and other ancillary works

    有關渠道街燈地勢水流改向護土墻及斜坡,及其他附屬工程。
  15. With backward irrigation method, rough diversion operation used in agricultural irrigation brought about serious water wasting, moreover, most of irrigation works are outdated and without repair caused serious leakage, as a result, the water utility rate of irrigation is just 0. 38 in weining irrigation area of ningxia, so it is imperative to reform water - saving engineering

    寧夏衛寧灌區灌溉方式落後,農業灌溉實行大引大排,浪費嚴重,且灌溉工程老化失修,滲漏嚴重,平均灌溉水利用率只有0 . 38 。因此,衛寧灌區實施節水改造勢在必行。實施節水改造后的衛寧灌區本文稱為沙坡頭灌區。
  16. Abstract : combining tangyao tunnel construction practice at zhaosandu diversion works in wenzhou, the paper presents the structure, dustremoving principle and result of bag dust filtrating collector, and briefly describes its accessories and applicable cases

    文摘:結合溫州趙三渡引水工程湯嶴隧道施工實例,介紹袋式洗濾除塵器的結構形式、除塵原理及除塵效果,並對配套設施和適應性作了簡要說明。
  17. The works comprise mainly : the addition of passenger lifts to the four footbridges ; structural modifications of the footbridges ; construction of retaining walls ; demolition of a staircase and a ramp, and the associated lighting, drainage, utilities diversion and electrical and mechanical works

    工程主要包括在四條行人天橋建造行人升降機將行人天橋作結構更改;建造護土墻拆卸一條樓梯及一條斜道,以及進行相關的照明設施排水系統公用設施遷移及機電工程。
  18. Rock - fill dam is the one chief type of soil - rock dam, there are much virtue of safety function, adaptability used the local material, be benefit to mechanical building, be short in building time and low in cost, being simple in the building during closure and diversion, etc. it suit the condition of our nation and the environment where the water conservancy works and hydroelectric power plant located, we accumulate the ample practical experience and a series of achievement in scientific research and become a model of having ample competition in the construction and development of piled rock clam

    堆石壩是土石壩的主要壩型之一,它具有適應性強,就地取材,便於機械化施工,工期短,造價較低等優點,在水利樞紐設計中被廣泛應用,而且已經積累了豐富的實踐經驗和成套的科研試驗成果,在水利樞紐的壩型選擇中具有很強的競爭力。就堆石壩而言,根據築壩方式和築壩材料的不同,也有多種壩型。
分享友人