double prestressed concrete 中文意思是什麼

double prestressed concrete 解釋
雙向預應力混凝土
  • double : adj 1 兩倍的,加倍的。2 雙的,二重的,雙重的;對,雙,兩,復。3 雙人用的;折疊式的。4 (意義)雙...
  • prestressed : 安裝預應力
  • concrete : adj 1 具體的,有形的;實在的,實際的。2 固結成的,混凝土製的。3 圖案詩歌的(參閱concrete poetry)...
  1. Partially prestressed concrete structure has been widely used in the field of civil engineering. the deformation is very important for prestressed concrete members, for they are thinner than those of reinforced concret owe to the adoption of hign - intension material and developed technic of design and construction. at present, there are some formulae for deformation in the criterion of many countries. mostly there are 3 methods in use : double linearity method, method of valid inertia and curvature integral calculus method. this article will discuss the influence of material, spa, construction form, and adjust the formula for stiffness of gb50010 - 2002 to a new uniform formula for deformation

    在土木工程領域,部分預應力混凝土結構因其良好的跨越能力和經濟性而得到了廣泛的應用,並發揮了巨大的作用。由於採用了高強度材料並進一步改善了設計和施工技術,預應力混凝土構件一般比普通鋼筋混凝土構件更為細巧,因此,撓曲變形問題顯得尤為重要起來。目前,各國規范對于部分預應力混凝土構件的變形計算均有相應的公式,變形計算的關鍵是剛度的計算。
  2. Combined with the full scale models tested in - situ of prestressed concrete penstock with double circle unbonded strands and single circle bonded strands of xiaolangdi multipurpose dam project of yellow river, the advantages and disadvantages of two different prestressed systems are analyzed, the concrete stress distributions of the prestressed concrete penstock are induced and summarized during the whole tensioning strands stage. the consistence among the test results, the theory calculating and the three dimensional finite element analysis is proved. therefore, the theoretical method of prestressed concrete penstock is feasible

    結合黃河小浪底水利樞紐工程在施工現場進行的採用雙層雙圈環形無粘結預應力鋼絞線和單圈有粘結預應力鋼絞線對排沙洞襯砌混凝土施加預應力的1 : 1模型試驗,對比分析了兩種后張預應力施工體系的優劣,歸納總結了預應力筋束張拉過程中預應力混凝土壓力管道結構管壁混凝土的內力分佈規律,驗證了模型試驗實測數據、理論計算和三維有限元分析結果的一致性,確定了預應力混凝土壓力管道理論計算方法的可行性。
  3. Its main span, which is 60m long, is made up of prestressed concrete continuous beam. the fourth pier, one of the main piers, adopts the compound foundation constituted with double - siding steel cofferdam and drilled shafts which stands on the deep - water and slopping river bed where geological condition is very complex, so the cofferdam has the trend of slippage

    渝懷鐵路第20標段阿蓬江大橋全長343 . 06m ,主跨為60m的預應力混凝土連續梁, 4 #墩是其一個主墩,基礎採用雙壁鋼圍堰與鉆孔樁相結合的復合基礎。
分享友人