The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage
錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。 -
This paper uses compare principle to show that there exists at most one of classical solution for ( 1 ), while the existance of solution is obtained through continuous method. to get the required a priori estimates except the double normal derivatives, we adopt the method in [ 3 ], and the double normal derivatives on dq are achieved by barrier constructions and applying skill of [ 2 ]
本文用比較原理證明了問題( 1 )至多存在一個古典解,應用連續性方法,得到了問題( 1 )古典解的存在。在得到所需的先驗估計時,利用了[ 3 ]中的方法建立了除去邊界二階法向導數外的先驗估計,通過構造閘函數,用[ 2 ]中的技巧得到在邊界(
分享友人