downstream velocity 中文意思是什麼

downstream velocity 解釋
下游速度
  • downstream : adv. ,adj. 順流(的);在下游(的)。
  • velocity : n. 1. 迅速;快速。2. 速度,速率。3. 周轉率。
  1. Abstract : through study on energy dissipation of goupitang project on the wu - jiang river, the velocity field in the water cushion pool downstream ski - jump or drop was measured by hot - film anemometers on a fine model with scale 1 380

    文摘:結合烏江構皮灘水利樞紐工程消能問題研究,用熱膜流速儀在比尺為1 380的精細模型上量測了拱壩挑跌流在水墊塘內的流速場,並由試驗成果分析了淹沒射流在水墊塘內的消能過程,計算了消能率。
  2. According to all the sediment peaks of 35 floods observed at each station on the downstream of xiaolangdi, it analyzes the characteristic of delayed sediment peak and establishes a regression equation between sediment peak lag time for each section of xiaolangdi, huayuankou, jiahetan, gaocun, sunkou, aishan and lijin and peak discharge, sediment concentration of the peak, flood propagation velocity and fall velocity of suspended load of the previous station, which can search, make up and extend sediment peak lag time and provide a basis for accurate forecasting on sediment peak travel time of each station on the lower yellow river

    根據小浪底下游各站沙峰均滯後於洪峰的35場洪水,對沙峰滯後於洪峰的特性進行了剖析,建立了小浪底、花園口、夾河灘、高村、孫口、艾山、利津各河段沙峰滯后時間與上站洪峰流量、沙峰含沙量、洪水傳播速度、懸移質泥沙群體沉速之間的回歸方程,可以用來查補延長沙峰滯后時間,為下游各站沙峰傳播時間的準確預報提供依據。
  3. A new method is presented. the travel time, including the time delays associated with overland folw pathways, is obtained. it is expected that the hillslope velocity and the stream velocity are different, and different equation is used. in the method, the fact that velocity increases going downstream in river systems is taken into account. after the travel time of each cell being calculated, the frequency distribution of the times of arrival of individual water droplets at the catchment outlet - giuh, is obtained

    提出了一種匯流時間計算方法,匯流時間中包括坡地漫流時間和河道匯流時間。方法中坡地單元的匯流速度與河道單元的匯流速度採用不同的計算公式,同時考慮流速沿河道向下游的變化。流域中每一個網格單元的匯流時間得到后,將其看作隨機變量,進行統計分析后,得到匯流時間的頻率分佈? giuh 。
  4. Based on the riverbed evolution analyses of the downstream reach of oujiang estuary and physical model test of eight types of regulation projects, an estimation method for nondeposit velocity satisfying channel depth is presented under fixed bed model test condition

    摘要通過對甌江口外段河床演變分析,以及8種航道治理工程的物理模型試驗,提出了在定床試驗條件下滿足航道水深所需的不淤流速的估算方法。
分享友人