drain pressure 中文意思是什麼

drain pressure 解釋
放出壓力
  • drain : vt 1 排去(水等液體),排泄,放干 (away; off)。2 喝乾,倒空。3 用完,花光。4 使…某物枯竭;使…耗...
  • pressure : n 1 壓;按;擠;榨。2 【物理學】壓力,壓強;大氣壓力;電壓。3 精神壓力,政治[經濟、輿論等]壓力。4...
  1. This drilling adopts crank connecting link and walking beam percussion mechanism, which make the drilling possess two percussive functions, normal drilling takes connecting link impact as main mode, when encountering special situation and the connecting link impact can not drill, it can transform into hoisting impact, the stroke length can be modulated, it realizes automatic percussive drilling due to continuous operating of connecting link percussive mechanism, these can enhance drilling efficiency and relieve labor intensity ; it adopts pumping reverse circulation to drain slag, which not only resolves the drilling difficulty in special stratum such as pebble and gravel stratum and hard stratum, but also resolves the problem that the percussive drill ' s efficiency is low ; it adopts spur gear differential mechanism as double cylinders lazy tongs of main hoist, which not only ensures the balance state of drilling tool, but also reduces the mechanical design, and reduces the cost ; the bottom plate traveling motion of this drilling machine adopts walking type ; the drilling tower adopts hydraulic pressure uprising, and reduces the assistant operating time

    該鉆機採用曲柄連桿、游梁式沖擊機構,使鉆機具有兩種沖擊功能;正常鉆進以連桿沖擊為主,遇到特殊情況,用連桿沖擊不能鉆進時,可轉為卷揚沖擊,沖程可調,因連桿沖擊機構連續工作,所以實現了自動沖擊鉆進,可提高鉆進效率,減輕勞動強度;採用泵吸反循環的方式排渣,既能有效解決卵礫石地層、堅硬地層等特殊地層鉆進的困難,又很好地解決了沖擊鉆機效率低下的問題;採用直齒圓柱齒輪差速機構作為主卷揚的雙筒同步機構,既保證了鉆具處于平衡狀態,又大大簡化了該機構設計,降低了成本;該鉆機底盤行走移位採用步履式;鉆塔採用液壓起立,減少了輔助作業時間。
  2. Based on the equal strain consolidation model of sand drain, and neglecting the well resistance and the vertical drainage consolidation, a layered model for the nonlinear consolidation of sand drain, which accounts for the geostatic pressure varying along depth and the relationship between the average viod ratio and the logarithm of average effective stress, is presented

    摘要基於砂井等應變固結模型,考慮初始有效應力沿深度變化,忽略井阻和豎向排水固結的影響,應用平均孔隙比與平均有效應力的對數關系,建立砂井非線性徑向排水固結的分層計算模型,並求得常荷載作用下的徑向排水固結解析解。
  3. On top of one of the fast - opening ends that closed to the pig receiver & launcher shall assemble vent valve, safety valve and pressure gauge, and at the bottom shall assemble drain valve, sideway inlet and vent valve to take out medium from the main pipe as the power of forcing pig and conveyance medium

    靠近收發球筒快開盲板一端上部應設防空閥、安全閥及壓力表、下部設排污閥、側面設進、出油(氣、水)閥,以便從干管中取介質作為驅動清管器的動力及輸出介質。
  4. Rinse the split peas until clean. drain. pour into the pressure cooker and cook for about 30 minutes. strain

    豌豆用水清洗干凈控干水分。倒入高壓鍋中加入水。烹制大約30分鐘。用濾網過濾煮好的黃豌豆。
  5. This article introduces the silt geology platform afterwards uses the powder spurts and the plastics drain off water the board and grille and back pressure protects etc design and the construction control of measure, the construction has the guidance meaning to the construction of the bridge abutment soft base

    摘要介紹了淤泥地質臺后採用粉噴樁、塑料排水板、土工格柵、反壓護道等措施的設計與施工控制,對臺后軟基處治工程的施工有指導意義。
  6. Temperature and pressure relief valve properly installed with a discharge line run to an open drain and protected from freezing

    正確安裝降溫減壓安全閥,並配置排泄管引導至一個敞開的排水口,並確保不會被凍結。
  7. He said that the most commonly found dangerous goods inside baggage at hkia were lighters, perfume or toiletry items, aerosols or gas cylinders for medical or sporting uses, signal flares, gas torches, and household items such as adhesives, polishes, bleach and drain cleaner. these items could be a danger when transported by air due to sudden temperature and pressure fluctuation and vibration

    他表示,在香港國際機場處理的行李內,經常發現的危險品包括打火機、香水或梳妝物品、醫療或運動用的噴霧罐或氣罐、訊號彈、以氣體燃點的點火器和接合劑、擦亮劑、漂白劑和溝渠去污劑等家居用品。
  8. After researching the part thermal equipments and systems include heaters, steam leakage and receiving systems, low pressure drain system etc, and computing the efficiency of the systems, find out the better choice of the imported assemblies than the domestic assemblies in parameter and the disfigurements in design and making. based on the above, point out the measure to progress them. according to the analysis, we can get some measures to increase the economical level of the systems and save more energy

    對局部熱力設備及熱力系統進行分析研究,包括:加熱器設備、漏汽及回收系統、低加疏水系統、主、再熱蒸汽系統以及凝汽器等部位;並計算汽輪機本體高、中、低壓缸效率,藉此著重對汽輪機通流部分進行了剖析,找出國外進口機組動、靜葉柵、葉型的選擇比國產機組先進性以及國產機組在通流部分設計和製造中的諸多缺陷,並且指出了改進的方向,為機組提高熱經濟性、節能降耗奠定了理論基礎。
  9. Shut off supply pressure and drain valve

    關閉供水壓力閥門和排水閥門。
  10. A small valve or faucet used to drain or reduce pressure, as from a boiler

    泄氣閥,小龍頭用來排空或降低壓力的一種小閥門或小龍頭,如鍋爐上的
  11. That is, the partially penetrating sand drain ground is viewed as the double - layered ground, and its consolidation is analyzed with 1 - d consolidation theory, through the transformation from 3 - d consolidation to 1 - d consolidation in the region of sand drain. this can overcome the disadvantage that the excess pore water is discontinuous between the region of sand drain and under - lying soft layer. to the double - layered ground, based on the consolidation mechanism under surcharge, the excess pore water pressure calculation formula is deduced under the condition of multilevel equably loading or unloading, which perfects the consolidation theory

    然後,在充分考慮豎井區井阻、塗抹作用以及土體結構損傷破壞對固結影響的基礎上,將未打穿豎井地基合理地轉化為雙層地基,按一維固結理論計算,克服了傳統固結計算方法在豎井處理區與下臥層交界面處存在孔壓間斷的缺點;在此基礎上,從超載預壓法的基本原理出發,分析了雙層地基超載預壓固結、沉降機理,推導了多級等速加、卸載情況下雙層地基的固結計算公式,進一步完善了雙層地基固結理論。
  12. To drain continuously with low noise, without being affected by the fluctuation of the pressure

    不受壓力波動的影響,連續排水,噪聲小。
  13. The design, commissioning and application of variable frequency regulation system for drain pump of no. 2 low - pressure heater of no. 4 generator ( 200 mw ) in jingmen thermal power plant were introduced

    摘要介紹了荊門熱電廠4號機組( 200mw )採用的2號低壓加熱器硫水泵變頻調節系統的設計、調試及應用情況,該系統克服了傳統的定速調節的諸多弊端,取得了很好的經濟效益。
  14. The causes of drain blockage existing in drainage system of low - pressure heaters no. 7 and 8 concerning imported 300 mw unit for a long term in huaneng weihai power plant have been analysed, and reasonable retrofitting scheme being put forward based on conditions in the field

    摘要對華能威海電廠引進型300mw機組7 、 8號低壓加熱器(低加)疏水系統長期存在的疏水阻滯原因進行了分析,並根據現場條件制定出合理的改造方案。
  15. It indicts that, in the deep & thick soft ground improved by preloading or surcharge loading with sand drain partially penetrating, post - construction settlement mostly results from the dissipation of remained excess pore water pressure and the proportion of compress occurred in under - lying soft layer to total post - construction settlement is becoming larger with the time

    而後,結合工程實例,分析了超載預壓時間、超載大小以及豎井處理深度對深厚軟土末打穿豎井地基有效應力面積比r的影響,探討用r作為深厚軟土未打穿豎井超載預壓地基卸載控制標準的可行性。
  16. Practice of employing transpositional buried pipes and negative pressure to drain the gas at the upper corner

    下架道置換埋管負壓引排上隅角瓦斯實踐
  17. Through static emulating calculation of the high - pressure heater, the influence of high - pressure heater leakage upon its operation paeameters, such as outlet temperature of the feed - water, pressure loss of the steam extraction pipeline, and temperature of the drain, has been analysed

    摘要通過對高壓加熱器的靜態模擬計算,分析了高壓加熱器?漏對其運行參數,如給水出口溫度、抽汽管道壓損、疏水溫度的影響。
  18. Temperature and pressure relief valve properly installed with a discharge line plumbed to an open drain and protected from freezing

    正確安裝降溫減壓安全閥,並配置排泄管引導至一個敞開的排水口,並確保不會被凍結。
  19. The results show that the three parameters, i. e. the maximum allowable flow rate of the drain tank, the drain tank pres - sure, and the pressure of the water separator, are supporting and restraining each other, and the variations of the pressure and flow rate are reasonable

    模擬結果表明:疏水箱的最大允許流量、疏水箱壓力以及汽水分離器的壓力三參數是相輔相成,相互制約的;壓力和流量等參數變化趨勢合理,模擬結果對外高橋電廠機組啟停有一定的指導意義。
  20. Industrial valves. drain hoss or pressure tap

    工業閥門.加壓和卸壓的加厚部件
分享友人