drawing change list 中文意思是什麼

drawing change list 解釋
圖紙更改一覽表
  • drawing : n 1 延引,牽引;引誘。2 抽簽;拈鬮。3 【機械工程】拔絲;沖壓成形。4 描畫,制圖;圖,圖形;素描;...
  • change : vt 1 改變,變更,變換,變革。2 交換;兌換;把(大票等)換成零錢;把(支票等)兌成現金。3 換(車、...
  • list : n 1 清單,目錄,表,一覽表;名單。2 (交易所中)全部上市證券。3 =listprice an active list現役軍...
  1. The real estate development cost control methods are specified of decision, design, execution stage to reduce the construction cost, and it is compiling feasibility study report and capital invest estimation in decision, optimizing the design scheme and designed rationally in the technique and construction drawing design stage, electing rational construction scheme in construction stage, controlling the change in the work and field visas strictly, examining and approving budge detailed, budge planning use the quantities list, electing the best subcontractor, preventing some monopoly raise the price, collecting the detailed data in the fieldwork, making strict bargain

    討論了房地產開發項目的決策階段、設計階段、實施階段分別需要採取的相關措施和方法,以盡量降低項目的工程造價,即在決策階段編寫詳細的可行性研究報告和編制投資估算;在設計階段優化設計方案,進行合理的技術設計和施工圖設計;在實施階段選擇合理的施工方案,嚴格控制工程變更和現場簽證,嚴格審核工程施工圖預算,工程造價的預算採用工程量清單報價,擇優確定專業分包單位,防止少數壟斷性行業任意抬價,深入現場,收集和掌握施工有關資料,制定嚴密的合同條款。
分享友人