drill way 中文意思是什麼

drill way 解釋
孔道
  • drill : n 1 【軍事】操練,演習;(嚴格而有系統的)盤練,訓練;〈英口〉教官。2 【機械工程】鋼鉆,鉆頭;鉆...
  • way : n 1 路,道路,通路。2 路程;距離。3 (要走的)路線;途中,路上;進行,前進;【法律】通行權。4 方...
  1. The way your battalion shook out into artillery formation, company by company was the most beautiful bit of parade ground drill i ' ve ever seen

    你們營一個連接一個連地散開成炮兵隊形是我在練兵場上所看到的最精彩的操練了。
  2. If there is no over burden at the river bed, the steel pipe pile cannot be inserted, the floating platform will be adopted, during overwater construction, the author ( using zhong - 60 floating box, etc. ) assembled 40t floating crane by his own design, in this way, the floating crane completed the work of overwater transporting and lifting, such as the transporting of s teel pipe pile, inserting, the erecting of overwater construction platform, overwater moving of drill grid crane, lifting of lifting box of cushion cap, pulling out of steel pipe pile

    在水上作業中,作者利用中- 60浮箱等設備自行設計、拼制了40t浮吊,完成了水上運輸、水上起重等作業,如鋼管樁的運輸、插打、水上施工平臺的搭設、鉆機吊車的水上轉移、承臺吊箱的起吊、鋼管樁的拔除等作業。
  3. But the easiest way to make big mistakes is to drill down to detail too fast

    最容易犯大錯誤的方式是深入研究細節的速度太快。
  4. The only way to open the box is to drill it open

    唯一打開的辦法就是鉆開箱了。
  5. The primary use of hidden items is to provide a report that shows summary data but also provides a way for the user to drill down into detail data

    隱藏項的主要作用是使報表只顯示摘要性的數據,而在同時又允許用戶深入了解詳細的數據。
  6. The building guantou especially the big bridge engineering geology condition is more complicated, by drill to explore the data to announce to public the rock soil body of types, the engineering geology function and the geologic strata circumstance, this time soil kind and the rock samples that investigates to still pass to adopt in great quantities to carry on indoor experiment, get a great deal of data, in order to get the useful rock soil parameter, this thesis still introduces to beg the process of take the rock soil parameter in the way of the mathematics covariance

    館頭特大橋工程地質條件較為復雜,通過鉆探資料揭示了巖土體的成因類型、工程地質性能以及地層情況,此次勘察還通過大量採取的土樣和巖石樣本來進行室內試驗,得到了大量的數據,為得到有用的巖土參數,本論文還介紹了通過數理統計的方法求取巖土參數的過程。
  7. The recovery probability of hydrocarbon & strategic value method is used to evaluate and select the best prospects to drill in different geologic provinces, which is one way to reduce the exploration risk and improve the nfw success rates in frontier areas

    應用該方法對不同地區的預探圈閉進行評價和優選,可以有效地減少新區勘探風險,是提高鉆探成功率的主要途徑之一。
  8. Abstract : through the practice of vertical pressers in long sp an continuous box - girder and the research of two - way prestress model test, the construction technology about unbonded vertical prestress is proposed and applie d in hanjiang bridge in hanchuan. for the first time, it ? s first adopted in long span concrete bridge in our country and a lot of economic benefits are created b ecause of its advantages such as little drill way, rapid and imple construction, h igh quality and so on

    文摘:通過漢川漢江公路大橋大跨徑連續箱梁豎向預應力施工實踐和雙向預應力模型梁試驗研究,在該橋施工中提出並應用了無粘結豎向預應力技術.這在國內大跨徑砼橋樑上尚屬首次全面採用,它具有孔道直徑小,施工簡便快速,質量易於保證等優點,為全橋預應力施工創造了較為顯著的社會經濟效益
分享友人