dry bearing 中文意思是什麼

dry bearing 解釋
干軸承
  • dry : adj 1 乾的,乾燥的;無水分的,干透了的。2 (井、河等)乾涸的,枯竭的;(氣候)乾旱的;無奶的;無...
  • bearing : n 1 忍耐,忍受。2 態度,舉止,風采,姿態。3 關系,影響,方面,聯系 (on; upon); 意義。4 〈常 pl ...
  1. On the basis of the discussion of the ecological rehabilitation on subsidence land of coal extraction, the land structures of nourishment, plane and perpendicularity on subsidence area of coal extraction are differently designed. on nutritive structure green crops are mainly common crops, green vegetables, green forage crops and acquatic creatures. on plane structure the center of the subsidence land of coal extraction can be used as fish culture in net cage, the periphery can be established as fish pool and economic crops in water, and the outmost layer can be used as high - yield field, vegetable shed, domestic animal breeding area and fruit - bearing forest. on vertical structure the deepwater area can be established as fish pool and economic crops in water, and the uppermost layer can be developed as acquatic and semi - acquatic crops or dry farming crops

    在討論採煤塌陷地生態復墾的基礎上,對新泰市採煤塌陷區生態復墾用地的營養結構、平面結構和垂直結構進行了優化設計.在營養結構上,綠色作物主要是農作物、蔬菜、飼料及水生生物.在平面結構上,在塌陷的中心地帶實施網箱養魚,外圍區建立精養漁塘和水生經濟作物,最外層生態復墾為高產農田、蔬菜大棚、畜禽養殖區和林果地.在垂直結構上,在積水區建立精養漁塘和水生經濟作物,最上層則發展水生、半水生及旱作綠色經濟作物
  2. Compared with the mud on wall form hole technology, clash stake technology or vibration sink pipe technology used in complex foundation stake forming, it has advantages of no vibration, no pollution, and no noise. in addition, since the concrete pressed into the drill stem sent vibration free concrete to the pump, so it is eas y to ensure the quality of the stake body. compared with the mud on wall and dry work form hole technology, the side obstruction and end obstruction of screw drill press concrete stake have all been accordingly improved, the weight bearing is better, and the transmutation of the complex foundation is less

    其中,螺旋鉆孔壓灌混凝土成樁技術自研製以來,已在多項復合地基工程中進行了應用,較好地解決了軟弱地層成孔困難的問題,適應地質條件范圍廣,成樁速度較快,工期短、工效高;與復合地基成樁時的泥漿護壁成孔工藝、振沖樁工藝或振動沉管工藝施工比較,具有無振動、無污染、無噪音的優點;另外,壓入鉆桿內的混凝土為泵送免振混凝土,因此樁體質量易於保證;與泥漿護壁和干作業成孔工藝相比,螺旋鉆孔壓灌混凝土成樁的側阻和端阻都有相應的提高,樁的承載性能較好,復合地基的變形較小。
  3. Through the dry and wet cycling experiment on unmarred beam and pre - cracked beam, the position of initial corrosion and influence of crack on the reinforcing bar corrosion are studied in this paper both the flexural bearing capacity performance and the material mechanical performance of the beams are studied on the test of full scale concrete beam a model of 3d fem is established to simulate the state of the actual full - sized rc beam and electronic accelerating test beams, computational results and test results are compared

    通過對混凝土梁的干濕循環試驗,研究了在混凝土梁中的鋼筋初始銹蝕情況,以及不同寬度的裂縫對于鋼筋初始銹蝕的影響。通過對足尺銹蝕混凝土梁的試驗,研究了混凝土梁在海洋環境侵蝕作用下的材料性能的變化和抗彎承載能力的變化。
  4. The construction execution of prestressing work has many advantages such as : dry - work, rapidity, no organic adhesion agent, small space to be taken, the high efficiency of strengthening, so this way can be applied in the structures which request to improve bearing capacity largely and take small space after strengthening as well as other structures which will work in long time and in high temperature

    預應力加固過程是干作業,施工速度快,不使用有機粘結劑,加固后佔用空間小,加固效率高,適用於要求大幅度提高承載力及加固后佔用空間小的混凝土結構,也適用於要求施工速度快,加固后使用年限長,工作環境溫度高的結構。
  5. The soft ground need to be treated in order to satisfy the demands of the settlement after loading of the highways because of its low bearing capacity and great deformation. the dry - jetted cement mixing pile ( djcm pile ) is one of the effective ways to reinforce the soft ground

    軟土地基由於其承載力低,受荷載作用后產生很大的變形,並且要持續較長時間長能穩定,往往需要進行人工處理才能使公路的工后沉降滿足規范的要求。
  6. It is highly non - uniform with the line end insulators bearing a higher voltage than that in an ac insulator string on dry condition

    乾燥情況下,直流系統絕緣子串電壓分佈更加不均勻,導線端絕緣子電壓更高。
  7. Particleboard - part 4 : requirements for board - bearing boards for use in dry condisions

    刨花板第4部分:在乾燥狀態下使用的結構用板要求
  8. Particleboard - part 6 : requirements for heavy - duty load - bearing boards for use in dry condisions

    刨花板第6部分:在乾燥狀態下使用的增強結構用板要求
  9. The map shows the similarity between each location in the study area and the location chosen at oil & gas well or dry well, thus it can predict both favorable and poor sectors of oil & gas bearing

    統計類比圖給出了整個研究區中每一基準點與控制點相似屬性的個數,因為控制點一般選為油氣井位或乾井位,因此,可利用統計類比圖進行有利區帶和不利區帶的預測。
分享友人