dry construction method 中文意思是什麼

dry construction method 解釋
干工法
  • dry : adj 1 乾的,乾燥的;無水分的,干透了的。2 (井、河等)乾涸的,枯竭的;(氣候)乾旱的;無奶的;無...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. Testing method for heat resistance of air dry leather of footwear construction

    製鞋靴的空氣乾燥皮革的耐熱試驗方法
  2. Surface wave velocity detecting tests and dry density detecting tests by pit replacement method were conducted respectively for the transient material ( a ) and main rock - fill material ( b ) used in the construction of concrete - faced rock - fill dam of shuibuya project

    摘要以水布埡面板堆石壩施工中的過渡料( a )和主堆石料( b )為主要檢測對象,分別進行了面波波速和試坑置換法干密度的對比檢測試驗。
  3. In this paper, first discussed are the corresponding results in highway and dam constructions and the engineering characters of rock - fills are deeply analyzed, especially the relationships between gradation, strength and maximum dry density, long - term stability of fillers including earth - fillers and rock - fillers and some conclusions of use are drawn. by in - situ tests and researches on compacting mechanism of high - filled rock embankments, effecting factors on compaction, construction technology and shock compacting technology, obtained in this paper are the compacting technology of high - filled rock embankment and the optimal parameters of rolling compaction. by deeply research on the theory and methods of quality control of high - filled embankment, settled are the questions as quality detection method and control standard of high - filled rock embankment

    本文首先總結和分析了國內外公路和壩工行業已有的相關成果,深入探討了填石料的工程性質與最大幹密度、長期穩定性等之間的關系,得到了一些有益的結論;通過現場試驗路堤的試驗和對高填石路堤壓實機理、填石路堤壓實效果影響因素、施工工藝和沖擊壓實技術等研究,解決高填石路堤壓實工藝和最優碾壓參數控制等技術問題;通過深入研究填石路堤壓實質量控制原理和方法,解決高填石路堤壓實質量檢測方法和控制標準技術難題;解決高填石路堤沉降觀測技術問題,並根據沉降觀測結果研究高填石路堤地基和路堤沉降變化規律,得到了能預測沉降變化規律的「龔帕斯」成長曲線預測模型;根據工程實際,深入研究了邊坡穩定性的影響因素,得到了有益的結論。
  4. A data processing technique for compaction curve is proposed from five inspected data to nine, or three data, and application program is developed for compaction curve. in " order to verify xgm method, author went to construction sites to inspect roadbed and collect field data. the optimum compaction curve, maximum dry density are obtained by means of data processing technique, which are good consistent with indoor standard compaction test

    進而研究將5點法擴展為9個實驗點到3個實驗點的多層次優化壓實曲線的數據處理法,提出了由現場干密度推算最大幹密度的xgm相關干密度法,簡稱xgm法,開發出xgm法應用軟體,繼而研究施工現場壓實檢測數據的優化處理方法。
分享友人