dual-coating system 中文意思是什麼

dual-coating system 解釋
雙塗層體系
  • dual : adj. 二的;二重的;二體的;二元的。 dual personality 雙重人格。n. 【語法】雙數;【數學】對偶。 the D- Monarchy 雙重君主國〈指第一次世界大戰前的奧匈帝國〉。
  • coating : n. 1. 被覆,表皮,塗層;包覆物;(食品上的)面衣,糖衣;塗料。2. 上衣料;細呢,花呢。
  • system : n 1 體系,系統;分類法;組織;設備,裝置。2 方式;方法;作業方法。3 制度;主義。4 次序,規律。5 ...
  1. In this paper, a high performance sma system applied to steel bridge deck is put forth in allusion to the pavement project of the wuhan junshan yangtze river highway bridge. it comprises steel slab, zn coating layer, closing layer, adhesive, pre - mixed asphalt stone and dual layer sma from bottom to top. it is based on the fea results of the forces and deformation of the pavement layer by means of the algor feas, according to this bridge ' s traffic and the ambient temperature varying range of the pavement layer

    本文針對武漢軍山長江公路大橋鋼箱梁橋面鋪裝工程,從鋪裝層環境溫度變化范圍、交通量等使用條件出發,在用algorfeas有限元分析軟體分析鋪裝層受力變形基礎上,提出了(即鋼板+金屬鋅塗層+封閉層+粘接劑+預拌瀝青碎石+雙層sma )的高性能鋼橋面sma鋪裝體系,並對這種sma的組成材料,包括改性瀝青、集料、礦粉、纖維進行了比較研究,設計了這種sma的配合比,對sma混合料的性能進行了對比試驗,對這種sma方案進行了疲勞性能研究,驗證了所選擇sma方案的可行性。
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
分享友人