earth filling 中文意思是什麼

earth filling 解釋
填土處理
  • earth : n 1 〈常E 〉 地球。2 大地,陸地,地面,地上。3 土壤,土。4 【化學】土類;泥。5 世界人類;人的軀體...
  • filling : n. 1. 裝滿,填裝;填補。2. 填料;填土。3. (糕點內的)餡。4. (織品的)緯紗,漿料。
  1. Descending into the grotto, he lifted the stone, filled his pockets with gems, put the box together as well and securely as he could, sprinkled fresh sand over the spot from which it had been taken, and then carefully trod down the earth to give it everywhere a uniform appearance ; then, quitting the grotto, he replaced the stone, heaping on it broken masses of rocks and rough fragments of crumbling granite, filling the interstices with earth, into which he deftly inserted rapidly growing plants, such as the wild myrtle and flowering thorn, then carefully watering these new plantations, he scrupulously effaced every trace of footsteps, leaving the approach to the cavern as savage - looking and untrodden as he had found it

    然後,走出洞來,把那塊石頭蓋回原處,在上面堆了些破碎的巖石和大塊的花崗石碎片,又用泥土填滿石縫,移了幾棵香桃木和荊棘花種植在這些石縫里,並給這些新移種的植物澆些水,使它們看起來象是很久以來就生長在這兒的一樣,然後擦去四周的腳印,焦急地等待他的同伴回來。他並不想整天地去望著那些黃金和鉆石,或留在基督山島上,象一條似的守護著那些沉在地下的寶藏。
  2. Evidence that the above - imaged plates really are dust - covered water - ice includes a similarity in appearance to ice blocks off earth ' s antarctica, nearby surface fractures from which underground water could have flowed, and the shallow depth of the craters indicating that something is filling them in

    支持如上面影像的扁盤的確是被沙塵所掩的水冰的證據有:它有著與地球南極的冰塊相似的特徵、附近地表凹凸不平的部分曾經有被地下水淹沒的痕跡、影像中淺底的隕石坑也許表示有某種東西填滿了坑洞。
  3. Application of the blasting compaction method for filling stone in earth works of shenzhen navy base

    爆炸排淤填石法在填海圍地工程中的應用
  4. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋墩,採用浮式平臺。
  5. Abstract : the paper is based on the working particle for sever al bridges in the construction of w8 section of sheng - yan railway project. it sy stematicaly instructs the construction method of bore - hole filling pile in the rock area with under - earth mined - out layer

    文摘:筆者以神延鐵路w8標段多座橋梁工程實踐為基礎,系統介紹了有地下采空層的巖石地區鉆孔灌注樁施工的方法
  6. The earth pot meal of xingyi is definitely different from other places, meal is it come out to steam with light oil, itself have condiment, have a meal very much fragrant even only, furnished with the filling material made of thin minced meat and lettuce above, in addition, and fry eggs, delicious food

    興義的沙鍋飯是絕對和其它地方不一樣的,飯是用淡油蒸出來的,本身有調料,就是光吃飯也很香,上面配有瘦肉末和萵筍做的餡料,加上和炸荷包蛋,美味哦。
  7. The preventing flood and draining waterlogging plan of china - singapore suzhou industrial park by taking the following factors into consideration, such as the cost, the characteristics, the management, the full utilization of the land, and the investor ' s psychological influence etc, this plan was elaborated by comparing the program of connecting protective embankments with the program of filling pits with earth. 2

    《中新蘇州工業園區防洪排澇規劃》通過對聯圩方案及填土方案,在工程投資、運行管理、土地利用、工程特色以及對投資商心理影響等方面的綜合比較,確定合理的工程方案。
  8. So far as the mixing material for building the earth - rock fill dam with clay core for shiquanhe hydropower station is concerned, the effect from the variation of the sand content for the filter material on the maximum dry density and the relevant parameters are to be determined within the variation area of the mixing mass ratio of ( 46 ~ 54 ) : ( 54 ~ 46 ) through this experiment, due to the max, dry density is largely influenced by the mixing ratio of both the lifter material and the clay and the sand content of the filter material, so as to determine the actual filling compactness of the mixing material of the core

    摘要由於獅泉河水電站粘土心墻土石壩摻合料的最大幹密度受反濾料與粘土料的摻合比例、反濾料含砂率的影響較大,因此擬通過本試驗確定摻合質量比在( 46 ~ 54 ) : ( 54 ~ 46 )范圍變化時,反濾料含砂量變化對最大幹密度的影響程度及相關參數,從而確定心墻摻合料填築的實際壓實度。
  9. Based on the known theoretical research at home and abroad, common theories of earth pressure and their adaptabilities are discussed in this paper, and emphases are put on the methods of earth pressure calculation and checking of strength and stability for retaining walls with balancing platform, especially under the condition of cohesive filling soil and over loading

    本文基於國內外擋土墻土壓力理論研究現狀,對常用土壓力理論及其適應性等進行了論述,重點分析與探討了衡重式擋土墻的土壓力計算方法,特別是對其上、下墻背、墻后填土為粘性土及存在超載等情況下的土壓力計算、墻身強度與穩定驗算方法等進行了研究。
  10. Based on the hypothesis that the rear side of retaining wall is pitching and coarse, and the filling surface is gradient, taking viscous filling as the object of study and using the static balance method, a study has been conducted on the earth pressure on the rear side of retaining wall under the sliding wedge ' s limiting equilibrium condition, and generated a general form for active earth pressure and passive earth pressure

    摘要基於擋土墻墻背俯斜、粗糙且填土表面傾斜的情況,以粘性填土為研究對象,用靜力平衡方法研究了擋土墻后滑動土楔體達到極限平衡狀態時作用於墻背的土壓力,提出了主動土壓力和被動土壓力的一般形式。
  11. During the construction of the dam for dalong water control project, the anti - seepage earth materials for the main dam filling are from three borrow areas in the original design

    摘要在大隆水利樞紐大壩施工中,原設計主壩防滲土來源為卡巴、壩上、叢毛三大料場。
  12. ( 2 ) in stability safety analysis the physical and mechanical parameter of the filling materials should adopt the index in natural condition, but after consolidation should adopt the composite physical and mechanical index which is gained with weight method according to the practical dimension of the stone columns and the earth between the stone columns

    認為樁間土的各項物理力學指標採用天然強度,而處理后復合土體綜合強度指標,採用樁體及樁間四川人學f _程碩卜學位論文1幾兩種材料lfu積比法加權值。
  13. The word " work " means the engineering, design ( including, but not limited to, primary design, extended preliminary design and preparation of detailed design and construction drawings ), construction ( including, but not limited to, early work, site setting out, earth back filling works, sub - structure works, civil works, above - ground works, installation and testing ) and construction management services to be performed by the development manager and subcontractors pursuant to the provisions of this contract and a written authorization, and as modified from time to time in accordance with the provisions of this contract, and includes all designs, drawings, plans, means, methods, techniques, sequences and procedures and, unless expressed to the contrary in this contract, all materials, tools, utilities, labor, equipment services, licenses, permits, tests, warranties, guarantees, transportation and other items and facilities of every kind necessary for the complete performance of this contract

    「工程」一詞應指由開發管理人和分包商根據本合同的規定和書面授權書執行的工程、設計(包括但不限於初步設計、擴初設計以及深化設計圖和施工圖的準備) 、施工(包括但不限於前期工作、現場布局、回填土工程、次結構工程、市政工程、地上工程、安裝和測試)及施工管理服務,該等服務可根據本合同的規定被不時修訂,並包括所有的設計、圖紙、計劃、手段、方法、技術、工序和程序以及,除非合同中有相反規定,所有的材料工具、設施、工人、設備服務、執照、許可證、測試、保證、擔保、交通以及其他為圓滿執行本合同所需要的各種物品和設施。
  14. Designers put green earth into thousands of differ ways, plus technologists fine - pointed finish. just as light lily taste filling the air. its docile, character, noble and elegant flow in the woman s every place this is the beriney

    設計師將綠色地球的千姿百態融洽其中,再加上工藝師們的精雕細琢彷彿清新空氣里彌漫著淡淡的百合花味,幽幽的女人香,它的服貼與風情高貴與典雅流淌在女人的每一個細節之處這就是
  15. 2. combining the yangliu river realignment project, a great experimental research on reinforce earth has been completed. some internal laws about the mechanical property of reinforced earth are obtained and described as follows : ( 1 ) the friction between reinforcement and filling has a direct relation to relative displacement between the two ones

    結合楊柳河整治工程實踐,進行了大量的試驗研究,通過對不同填料、填料在不同壓實度及加筋帶有無孔等情況下加筋土工程力學性質的對比,找出了如下: ( 1 )筋帶?填料之間的摩阻力與筋帶?填料之間的相對位移有直接關系。
  16. By the friction experiment of reinforcement geosynthetic materials, some internal laws about the frictional property of the reinforced earth are obtained and described as follows : l. the development of the friction between reinforcement and filling has a direct relation to the relative displacement between the two ones ; 2. the vertical pressure can influent the friction only within certain limits ; 3. the pseudo - friction coefficient f shows a nonlinear reduction with the increase of vertical pressure

    摩擦試驗得到了筋土界面的摩擦特性規律: ( 1 )筋帶與填料之間摩阻力的發揮與兩者之間的相對位移有直接關系。 ( 2 )垂直壓力對摩阻力的影響只在一定范圍內起作用。 ( 3 )似摩擦系數f隨垂直壓力的增大呈非線性減小。
分享友人