economic evaluation 中文意思是什麼

economic evaluation 解釋
經濟評估
  • economic : adj. 1. 經濟學的;經濟(上)的;實用的。2. 〈罕用語〉經濟的,節儉的。3. 〈委婉語〉故意隱瞞的。
  • evaluation : n. 1. 估價,評價。2. 【數學】賦值,值的計算。
  1. Gas engine - driven heat pmnp and its economic evaluation

    天然氣發動機驅動熱泵系統及其經濟性分析
  2. Next analyzed were the characteristics of natural gas pipeline transmission ; cost, ratemaking principle, method of acquiring the pipeline transmission fee, constitution, calculate, management and control after that, wt ; compared service cost methods with economic evaluation methods and the one - part pricing method with the two - part pricing method. later on was introduced the regulate coefficient of pipeline transmission fee structure, established the modificatory two - part pricing method, and found out a natural gas pipeline transmission pricing method that is fit for china ' s current situation. finally, we validated the rationality and applicability of this metho j by the demonstrational analysis on the natural gas pipeline transmission price of " the gas transmission from west to east " pipeline this paper ' s research fundamental is : the fundamental of natural gas pipeline transmission pricing should reflect the characteristics of natural gas pipeline transmission

    本文首先論述了自然壟斷行業的價格理論,然後分析了天然氣管輸的特點、定價原則及管輸費的收取方式、成本、構成、計算及其管理與調控;在此基礎上比較了中外天然氣管輸定價的服務成本法與經濟評價法,一部制定價法與兩部制定價法等;針對目前我國天然氣管道運價的制定現狀,本文深入研究了國際通用的天然氣管輸定價方法,引入「管輸費結構調整系數」的指標,建立修正的兩部制定價方法,找出了一套適合於我國當前國情的恰當的天然氣管輸定價方法,並通過「西氣東輸」管線加以實證分析,驗證了方法的合理性和適用性。
  3. In an attempt for an economic evaluation of the p - residual effect the following producer prices for food crops in indonesia have been converted into us dollar ( using an average exchange ratio between indonesia rupiah and us $ of 1, 925 : 1 ) : 1 kg rice = 225 r, 1 kg maize = 175 r, 1 kg soybean = 700 r, 1 kg mungbean = 1, 200 r

    為了對磷的殘效作嘗試性的經濟評價,下列印尼糧食作物產品價格被折成美元(印尼盧比與美元比率為1925 : 1 ) : 1公斤水稻= 225盧比, 1公斤玉米= 175盧比, 1公斤大豆= 700盧比, 1公斤綠豆= 1200盧比。
  4. Firstly, the default of the original method is discussed by using various theories. secondly the principles, method and characteristics of the urban road constructed planing are analysized. thirdly the research issues is put forwarded to solve the problem how to colligate serval aspect factors in order to make full use of the lrt project. 2. the establishment of the technological and economic evaluation about the plan of constructing route

    運用基本建設經濟學及建設系統工程的原理分析了建設線路選擇與整個建設項目之間的關系,為能在武漢城市發展整體規劃和城市路網規劃的基礎上使漢口太平洋路段線路的走向與城市交通建設相結合,順沿主客流方向,本文綜合考慮各方面因素,使輕軌項目能充分發揮效能和骨幹作用,並以太平洋路段的建設線路的方案比選為具體研究對象進行了研究。
  5. In the oil - field development production performance analysis and the production management, the technical personnel often does not satisfy an independent table information to the information demand, needs to inquire many correlations information, in the possible situation by the table, the curve or the chart form presents 。 for a this basis dynamic personnel demand development set of oil - field developments assistance dynamic analysis system, including nine big modules : the information intelligence inquiry module, the information statistics module, the dynamic contrast module, the dynamic analysis module, the oil water well chooses the value module, the rate of prediction module, the cartography module, the measure plan administration module, the economic evaluation module, to carry on the rate of prediction module

    在油田開發生產動態分析和生產管理中,技術人員對信息的需求往往不滿足一個單獨的表信息,需要查詢許多相關的信息,在可能的情況下以表、曲線或圖的形式呈現。為此根據動態人員需求的開發了一套油田開發輔助動態分析系統,包括九大模塊:信息智能查詢模塊、信息統計模塊、動態對比模塊、動態分析模塊、油水井選值模塊、產量預測模塊、繪圖模塊、措施方案管理模塊、經濟評價模塊、進行產量預測模塊。
  6. Be completing the research in theory, it has developed “ the economic evaluation computer software system for highway construction project ”. the system integrates the “ traffic forecast system ”, which was developed by professor li shuo

    在完成理論研究的基礎上,開發了「公路建設項目經濟評價計算機系統」 ,系統集成了李碩教授先前開發的「公路建設項目交通量預測系統( transcast ) 」 。
  7. By analyzing the technical flow of pithead heap - leaching uranium deposits of hard - rock type, the authors analyze its 14 cost items such as ore mining fee and major materials fee etc., and set up a geological - economic evaluation model

    摘要通過對硬巖型鈾礦坑口堆浸法的工藝流程分析,總結出坑口堆浸成本由礦石開采費用、主要原材料費用等14項要素組成,並建立了地質經濟評價模型。
  8. As the hard core of this paper, this chapter gives a frame which will help us to understand the new economic evaluation method of oil - gas projects better at first, then discusses the binomial model and the parameters estimating methods of abandon real options in the exploring phase, the partial differential equation model and the parameters estimating methods of the shut - down real options in the developing phase respectively. in the course of ascertaining the parameters estimating methods, this chapter discusses the application of a mathematic method - the monte carlo simulation in this article particularly

    做為全文的核心,先提出勘探項目經濟評價新方法研究的總體框架,然後具體討論確定勘探階段放棄期權的二叉樹實物期權模型與參數確定方法、開發階段停啟期權的偏微分實物期權模型與參數確定方法,在參數確定過程中,詳細闡述了蒙特卡羅模擬這一數學工具在本論文方法中的應用;第五,案例分析及方法應用探討。
  9. This paper analyzes the discount rate and operation cost in economic evaluation, and proposes the value taking method of the discount rate and determination method for the economic limit in different water cut conditions in the later stage of oilfield development basing on the break - even equilibrium principle

    摘要通過對經濟評價中的折現率及操作成本等經濟參數的詳細分析,從資金的保值及盈虧平衡原理入手,分別提出了開發下限的折現率取值方法及油田生產後期不同含水條件下的經濟極限確定方法。
  10. Method of economic evaluation of oil amp; amp; gas field development

    油氣田開發經濟評價方法
  11. It is difficult to be settled by classical theories because of fixed quality and quantity. this thesis bases on the improvement of traditional way, overcomes its i ack experience, takes the more advanced fuzzy decision - making and optimal selection theory, researches into the established model and gets the result that it ' s best to set pangtoupao storage and detention flood area on the left side of menjiang river by comparing the four schemes and ten objectives of fixed quality and quantity. the result holds identical views with the result of usual economic evaluation. so it ' s the first time using fuzzy decision - making and optimal selection theory to resolve the important and pragmatic problem comprehensively and scientifically

    本文在總結用傳統的方法研究經驗與不足的基礎上,採用目前較先進的模糊優化理論及建立起的模型進行蓄滯洪區設置及規模研究,通過對嫩江四個蓄滯洪區方案, 10個定性定量目標的優化比選,得出在嫩江左岸設置胖頭泡蓄滯洪區最優,其優選結果與採用常用經濟評價方法所得結果基本一致,從而第一次用模糊優化理論較全面科學地解決松花江流域防洪工程中確定蓄滯洪區規模這一重大實際問題。
  12. Economic evaluation and decision method of oilfield development adjusting project

    油田開發調整項目的經濟評價與決策方法
  13. Moreover, the author discusses the issue of economic evaluation on the port device with two kinds of method

    此外還結合實例,運用了投資回收期法和費用效率分析法論述了港口設備投資的經濟評價過程。
  14. Thus, whether an environmental project is approved depends on the assessment from both technical perspective and economic perspective. technical economic evaluation is also known as project economic evaluation ; it refers to the assessment and analysis made to the economic effects of a project during the decision - making process

    技術經濟評價又可稱為項目經濟評價,是指在工程項目或設計方案投資決策過程中,採用現代分析方法對項目方案在計算期(包括建設期和生產期)內的經濟效果所做的測算與分析。
  15. Primary approach to the economic evaluation of the investment projects in mining industry

    礦業投資項目經濟評價的初步探討
  16. Economic periodic fluctuation monitor and early warning means that the theories and methods on economic monitor, economic evaluation, economic forecasting and policy selection are studied on the basis of economic periodic fluctuation - one special economic phenomenon

    經濟周期波動監測預警是指圍繞經濟循環波動這一特定經濟現象所展開的一整套經濟監測、經濟評價、經濟預測和政策選擇的理論和方法體系。
  17. Economic evaluation of rice seeding production by saving water and sparse seeding

    水稻旱育稀植新技術節本增效經濟效益評價
  18. Chapter two ascertains main technological factor of dong gou lock reconstructing, including forecast the cargo and volume through the lock to reason about representative type of vessel designed for through the lock and its operation organize. chapter three design the renovate engineering through ascertaining the main technological factor scale of the lock, dimension, designed water level and altitude, including design of structure of the lock, lock chamber and lock gate, and select the main technological factor and pattern of headstock gear. chapter four draws a comprehensive compare of the two design scheme of the renovate project with engineering project economy evaluation method, and makes out the recommended scheme, and furthermore, to calculate the economic evaluation index of the recommended scheme and makes the economic sensitivity analysis of the scheme and finally demonstrate economic feasibility of the scheme

    本論文共分四章:第一章主要介紹了原東溝船閘的地理位置和營運現狀,說明了船閘在航道建設和水資源綜合利用中的作用及東溝船閘改造的必要性;第二章東溝船閘改造的主要技術因素確定其中包括東溝船閘過閘貨種和貨運量發展的預測,並確定東溝船閘的設計代表船型及營運組織;第三章東溝船閘改造工程設計本章通過船閘改造工程主要技術參數:船閘規模、尺度、設計水位和高程等的確定,設計了二個船閘改造方案,包括鋼筋混凝土整體塢式閘首結構、閘室和閘門的設計,並選定了啟閉機的主要技術參數和型式;第四章採用了工程項目經濟評估方法對東溝船閘改造工程二個設計方案進行全面綜合比較后,確定了推薦方案。
  19. The economic evaluation of domestic wildlife conservation - a case study of residents ' willingness to pay in beijing

    以北京市居民的支付意願研究為例
  20. A study and analysis on input of measures and stimulation results of oil producers in liaohe oilfield in recent years has been conducted in the paper. a system of evaluation indices for oil well stimulation measures in liaohe oilfield has been structured based on relevant theories of system of economic evaluation indices for oil & gas exploration projects and mode of economic evaluation for oil & gas exploration projects. method of increment used in economic evaluation for modification projects has been adopted for evaluations on benefits of measures

    因此本文對遼河油田近幾年來對原油生產井措施投入及增產效果進行了分析研究,根據「油氣勘探項目經濟評價指標體系」和「油氣勘探項目經濟評價模式」的相關理論構建了「遼河油田油井增產措施評價指標體系」 ,採用改擴建項目經濟評價方法中的「增量法」來對措施效益進行評價。
分享友人