energy capacity 中文意思是什麼

energy capacity 解釋
能量容量
  • energy : n. 1. 干勁,活力。2. (語言、行為等的)生動。3. 〈pl. 〉 (個人的)精力;能力。4. 【物理學】能,能量。
  • capacity : n 1 包容力,吸收力,收容力。2 容積,容量;【電學】電容,負載量。3 能力,才幹,本領;性能,機能。4...
  1. After like near future arrowroot continent dam flies a shop sign afresh go situation and to the limit of one ' s capacity rises should notice early days goes situation, if be pulled considerably, magnify again quantity, be about vigilance is banker shipment ( this time may be a few longer, banker is sucked prepare time to grow more, shipment time is long ), island visitting extensive region goes situation ( be about in first time to the limit of one ' s capacity first shipment ) if early days is to pass dish of full share, ( at present the individual thinks to have treasure new the sources of energy ) in the to the limit of one ' s capacity when breaking through strong line or resistance line but follow - up, that ability is really true the quantity adds valence to rise dropping is not must to the limit of one ' s capacity, and shrink the volume drops consequence is more serious, because early days banker already gave money, basically be, use odd amount to be bungled again dish, medicinal powder door meet disastrous

    如近期葛洲壩重新開牌后的走勢而放量上升要注重前期走勢,假如大幅拉升后再放大量,就要警惕是莊家出貨(這個時間可能比較長一些,莊家吸籌時間越長,出貨時間就長) ,看看寰島走勢(在第一次放量就要先出貨了)假如前期是經過盤整的股票, (目前個人認為有寶新能源)在突破勁線或阻力線時放量就可跟進,那才是真真正正的量增價升下跌不是一定要放量,而縮量下跌後果更嚴重,主要是因為前期莊家已出完貨,利用剩餘數量再砸一下盤,散戶就會損失慘重!
  2. It does not need much area, not any pollution, not consuming much electricity power, not need much cost. gshp combined floor radiation air - conditioning system possess high seasonal average cop value and great capacity of edaphic depositing heat energy, can ease up supplied water temperature fluctuating with the change of the outdoor air temperature

    地源熱泵技術聯合地板輻射對房間進行冷暖聯供的形式,具有地源熱泵季節性平均性能系數高、土壤蓄熱能力強、能緩解空氣源熱泵存在的供冷供熱能力隨環境溫度波動大的矛盾等優點。
  3. Resilience is the capacity of a material to absorb energy during elastic deformation

    彈性是指材料在彈性形變中吸收能量的能力。
  4. The distribution of electric energy is accomplished by dividing and subdividing large-capacity feeders into feeders of smaller and smaller capacity.

    電能的分配是通過把大容量饋線分支和再分支成容量越來越小的饋線的辦法來實現的。
  5. After the bottleneck in the original ethene production plant is analyzed, the revamp design plan for srt - iii cracking furnace is proposed. the measuring results after revampment show that the thermal efficiency and ethene recovery ratio are increased compared with the design data ; the production capacity of ethene cracking furnace is enhanced, and energy consumption is reducted

    通過分析原乙烯裝置生產存在的「瓶頸」 ,提出了srt -型裂解爐改造的設計方案,並對改造後效果進行測量,熱效率和乙烯收率均比設計值有所提高,乙烯裂解爐的生產能力提高了,能耗降低了。
  6. The internal energy and the molar heat capacity of actual gas

    實際氣體的內能和摩爾熱容量
  7. But with wind power capacity enlarging constantly and stochastic and incontrollable wind energy, wind asynchronous generator " s frequent startup will take inverse impact to wind power system stability, which is one of the most important restricting factor on wind power " s large - scale development

    然而,隨著風電裝機容量的不斷擴大,風能的隨機性和不可控性,使得相對頻繁起動的風力異步發電機,對風電系統穩定性的影響也愈來愈大,成為制約風力發電規模發展的主要因素之一。
  8. The cyclones with short cone are used for crude grading of minerals with heavier specific gravity in gold mines, sand gold mir. es and sulphur ore mines and have such advantages as small ground occupation, high capacity, high operating flexibility, low energy consumption and high movability etc

    短錐分選旋流器用於金礦、砂金礦、硫化礦等比重較大的礦物的粗選作業,具有佔地面積小,處理能力大,操作彈性大,能耗低,可移動性強等優點。
  9. The structural system has considerable energy - dissipation capacity, so can be generalized and used in medium seismic zones. due to exerting prestress, the structure has satisfiable self - centering capability

    結果表明,該結構形式若設計得當,是可以形成梁鉸耗能機構及整體破壞機制的,且該結構形式具有一定的耗能能力,可以在中等地震區推廣使用。
  10. For example, the pushover curve analysis has no way to consider the hysteretic energy and the energy dissipation in other ways, and to consider the material fatigue and the scathe in the structures " to - and - fro motion. the work done in this thesis is mainly as follows for trying to make better of the capacity - demand curve in existence : 1. confirm the factors those caused the discrepancy between the different capacity curves : the shape of lateral load distribution, assumption of member bars model, irregularity of the structures, p - effects

    為此,本文有針對性地開展了一些工作:闡述了基於性態的設計方法和基於位移的設計方法的相關概念及發展歷程;介紹了幾種現有的能力-需求曲線法的原理及分析步驟並剖析了它們的不足;列舉了影響能力-需求曲線法計算準確性的主要因素,通過算例比較分析它們各自的影響程度從而得出了其中最為重要的影響因素;針對已有的分析結論提出了對現有能力-需求曲線法的改進方案,通過算例分析驗證了改進效果。
  11. The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio

    基於上述分析,本次試驗通過五個外包鋼混凝土邊節點1 4比例模型的偽靜力試驗,以柱的軸壓比、梁角鋼布置形式、配箍率等為主要參數,分析外包鋼混凝土現澆框架一般層邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、破壞模式、變形能力、承載能力和角鋼錨固的可靠性;分析了頂層邊節點在張開彎矩作用下的工作性能、破壞模式和抗剪承載力;分析了試驗節點的滯回性能和耗能能力。
  12. At the conference, the chinese delegation said that the share of renewable energies in china s total installed energy capacity would reach 10 per cent by 2010

    中國代表團在會議上表示,於2010年前可再生能源的裝機容量將會佔全國裝機容量的一成。
  13. Abstract : the rechargeble batteries are used for backup power internal electrically equipments and instruments. but batteries lifetime usually is shorten by overwork and then malfunctions of equipment are induced. to avoid the complexion described above, the protection circuit against overwork is designed. it is based upon the voltage comparator and regulator. it will light up a red led when the volume of the batteries discharged close upon 50 % ; it will switch off the load automatically when it discharged closing to 80 % of their energy capacity, thus overwork of batteries can be avoided and lifetime may be extended

    文摘:用蓄電池做后備電源的系統(或設備) ,常因過放電導致電池提前報廢而造成設備故障.根據電池電壓隨容量變化的規律,利用電壓比較器和電壓基準源設計製作了電池放電保護電路,當電池放電量接近容量的50 %時,啟動預警信號;當電池放電量達到容量的80 %時,電路自動切斷負載,防止電池過度放電,延長電池壽命,保證系統(或設備)在供電恢復正常后能正常運行
  14. Above all, the study status and trends in development of rfid antenna are summarized in this thesis. the basic composition and operational principle of rfid system are discussed systematically as well as the division of the fields of antenna and the coupled modes of energy capacity. and the operating frequency and typical application of rfid are investigated to determine basic antenna structure

    本文首先對rfid技術的研究和發展現狀進行了綜述,系統的闡述了rfid的基本組成和工作原理、天線場區的劃分、能量耦合的方式以及rfid的典型工作頻率與應用,並確定基本的天線形式。
  15. The mechanic character, destroying pattern, the ductile and dissipation energy capacity of this composite structure under the earthquake have been clarified. the stiffness degradation, natural frequency, damping ratio of this structural system with the development of intensity of earthquake have also been investigated. with consideration of the top displacement, drift of story and micro - strain of longitude steel bars, the equivalent shell wall method has been presented in order to simplify the design of such type structure

    通過試驗,掌握了該結構體系在水平地震荷載作用下的受力特點、變形與耗能性能、結構的破壞形態等力學指標:得到了結構在不同地震烈度條件下的剛度變化、自振頻率、阻尼比等動力特性;綜合結構的頂點位移、層間轉角以及鋼筋的微應變,提出了適合於該結構體系簡化設計的「等效剪力墻法」 。
  16. By analysis of frequency spectrum based on matlab platform, wavelet method in the application of cutting out a section of inputting earthquake wave was presented. in the process of pseudo dynamic test results, the method of non - dimensional representation and analytic representation of hysteretic curve was provided. the above two methods will help to compare dissipation energy capacity of this structure at the different acceleration peak value stage of pseudo dynamic test more precisely and comparably

    通過基於matlab的地震波頻譜分析,說明了小波分析方法在擬動力試西安建築科技大學博士學位論文驗中地震波截取方面的應用;在擬動力分段試驗數據的處理方面,本文將試驗結果的無綱量表示方法以及曲線的多項式擬合法引入滯回曲線的數據處理,這將有助於擬動力試驗不同加速度峰值條件下,各階段結構耗能能力的客觀比較。
  17. Due to their high oxidation, multiple electron transfer, and high intrinsic energy, we refer to the cells containing fe ( vi ) compounds as " super - iron " batteries with more energy capacity compared to conventional alkaline batteries. the three charge reduction of fe ( vi ) represents a high energy and capacity source of cathodes, and the products ( ferric oxide ) have been considered as an environmentally benign substance

    如果fe ( )化合物作為電池的陰極材料時,其氧化反應為3電子過程,且反應產物為fe _ 2o _ 3 (鐵銹) ,與一般傳統堿性電池相比,它是一種高能,而且放電產物對環境無污染的綠色電池,目前,它的研究已成為電池研究領域的一個熱點。
  18. About three - quarters of the energy capacity which china will need by 2010 has yet to be built

    到2010年,中國將需要的能源貯量之中大約四分之三的仍在籌建中。
  19. Last year, for example, there was a record world - wide investment in new renewable energy capacity : us 38 billion

    以去年為例,世界各地在可再生能源上的投資創造了高達380億美元的記錄。
  20. ( 2 ) the failure mode, strength, stiffness, energy capacity and ductility of the columns with glass fiber reinforced polymer were described in details to investigate the seismic behavior and mechanism of columns under cyclic load

    而纖維增強塑料( frp )的復合材料加固方法由於其具有輕質高強、易於現場施工和良好的耐腐蝕性等優良性能,在工程界逐漸得到廣泛應用。
分享友人