engineer testing 中文意思是什麼

engineer testing 解釋
工藝試驗
  • engineer : n 1 技師;工程師。2 機械設計者,機車製造人。3 (輪船的)機師;〈美國〉(火車的)司機;駕駛員。4 ...
  • testing : 測試系統
  1. An accomplished software engineer specializing in object - oriented design and analysis with extensive experience in the full life cycle of the software design process including requirements definition, prototyping, proof of concept, design, interface implementation, testing and maintenance

    完成了在目標導向設計和在整個循環中對于軟體設計程序的經驗分析,程序包括:需求定義,原型,觀念試驗,設計,界面執行,測試與維護。
  2. Spcc has a strong engineer team products with logical design - ing and advanced craft, scientific managerial approach and complete testing system. the key manufacturing process is finished in depur - ation workshop with constant temperature and humidity. the vacuum and temperature of disposal of vacuum impregnating is controlled by computer completely

    企業技術力量雄厚,產品設計合理,工藝先進,管理科學,測試手段全完善關鍵工序的生產過程在恆溫恆濕的超潔凈室內進行真空浸漬工藝的真空度及溫度由計算機全自動控制。
  3. Shangyu power capacitor co., ltd is an appointed manufactory for power capacitor by ministry of mechanical building, and is also one of the first batch of recommendation products manufactory list for the construction and reform of city countryside powergrid in china. spcc is located in shangyu city of advantaged yangtze river delta with ningbo adjoined in the east, hangzhou in the west, wenzhou in the south and hangzhou bay in the north. spcc has a strong engineer team products with logical designing and advanced craft, scientific managerial approach and complete testing system

    公司位於中國長三角東南翼的上虞市。東鄰寧波西毗杭州南接溫州北瀕杭州灣,地理位置得天獨厚。公司技術力量雄厚,產品設計合理工藝先進管理科學測試手段全完善關鍵工序的生產過程在恆溫恆濕的超潔凈室內進行真空乾燥浸漬全過程的真空度及溫度由計算機自動控制。
  4. To assist the testing engineer during the tests

    在試驗過程中協助試驗工程師的工作。
  5. Test engineer is responsible for scheduling and conducting tests according to global test specification, analizing testing results and releasing test reports ; is responsible for maintenance of testing facilities and implementing 5s in test lab, troubleshooting of test stands ; is also responsible for designing testing jig to carry out the special test which can not be done on standard test stands

    試驗工程師負責按照全球試驗規范,根據本地和全球的試驗要求,計劃和執行各種試驗,分析試驗結果並撰寫試驗報告;負責制訂試驗設備的維護保養計劃和負責試驗室的5s管理,解決試驗臺故障;負責設計試驗裝置來完成標準試驗臺無法完成的特別試驗。
  6. In this thesis, the research and development of testing system of gun ' s dynamic parameters based on the virtual instrument is covered. combined with the author ' s working experience as a system engineer of conventional weapon proving ground ' s construction, the current condition and existed problems of our country ' s conventional weapon proving grounds are investigated. with the experience and technology of foreign armies, the problem in theory and technology of how to use virtual instrument in conventional proving grounds are discussed and the technological tendency of construction of conventional proving ground are also reached

    本文是作者以基於虛擬儀器的火炮動態參數測試系統的研製開發為切入點,在總結了多年來常規靶場建設系統工程工作經驗的基礎上,系統地分析了我國常規靶場測試系統的現狀及存在的問題,借鑒外軍武器試驗測試系統的技術和經驗,研究了虛擬儀器技術在常規兵器試驗測試系統應用中的相關理論及技術問題,探討了我國常規兵器試驗靶場測試系統的技術發展趨勢及其建設方向。
  7. Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50, 000m2, two 30 - story buildings ), worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ), worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant, 50, 000m2, worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing, analysis and consultations of nanjing international conference and exhibition center, site - erected structure, 75m span steel roof truss ( the largest one in china ), worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing, analysis and update technology of the reliability of the joints of intermediate floor slabs, beams and columns of base beam of sanshanjie station of nanjing metro " etc

    完成"江蘇新大都廣場( 5萬多平方米,二幢30層) "建設監理咨詢(總監) ; "錫澄高速堰橋跨線服務區(國內首座) "建設監理咨詢(總負責) ; "淮陰卷煙廠9 . 5技改項目( 5萬多平方米) "建築監理咨詢(總負責) ;主持了"南京國際會展中心75m跨鋼屋架(國內最大距)現場施工安裝結構安全性測試分析咨詢" ; "南京地鐵三山街站中樓板及底板樑柱節點構造技術安全可靠性的測試分析與技術改進咨詢服務"等項目。
  8. Bist is an efficient solution for the testing of soc. it is built up with prompting and responding circuits and these two parts are added to the circuit being tested so that the engineer need not consider the testing vector, for it ' s generated automatically

    而內嵌自測試技術對于解決soc生產測試的問題非常有效,它將一個激勵電路和響應電路中加到被測電路中,從而使測試人員不必再考慮測試向量的問題,因為它是自動生成的。
  9. Jack williams has been an advisory software engineer with lotus since the late 1990 s, working on a variety of projects involving quickplace testing, ibm hardware testing in the aix environment, and various other responsibilities

    Jack williams從上個世紀90年代起成為lotus顧問軟體工程師,先後參與了多個項目,包括quickplace測試、 aix環境下的ibm硬體測試和其他多項任務。
  10. Moreover, field engineer testing as carried out for concrete of the above mix ratio

    最後,對上述配比混凝土進行了現場工藝試驗。
  11. As a certified supervision engineer, speciality inproject evalution ; steel construction engineering and power engineering supervision, nondestructive testing, qc and qa etal

    本人為注冊監理工程師,咨詢專業特長為項目評估;鋼結構及電力工程監理;無損檢測技術;工程監測技術;質量控制和質量保證等。
  12. When functionality testing is being performed following the completion of the trial operation of wastewater, sewage or sludge treatment facilities, the engineer shall conduct an on - site check to determine whether the enterprise ? s wastewater, sewage and sludge output volume ; operating system ; operational status of wastewater, sewage and sludge treatment ; sampling locations ; sample quantity ; and sampling frequency comply with regulations and whether relevant records are reliable

    五廢(污)水處理及污泥設施完成試車,進行功能測試時,前往現場查核事業之廢(污)水與污泥產生量、作業系統、廢(污)水與污泥處理操作狀態、取樣位置、數量、頻率是否符合規定及相關紀錄是否確實。
  13. The other is the resonance of boom system of the truck - mounted concrete pump and the frequency response of displacement and acceleration of testing point. the main results and argumentations of this thesis are listed below in detail. 1. based on the certain boom system model of the truck - mounted concrete pump made in china, three - dimensional model of boom system of the truck - mounted concrete pump is built by using the softwar of pro / engineer

    2 .基於剛柔混合柔臂架模型,利用adams的振動模塊,以混凝土流動時的沖擊力為激勵對臂架系統進行了諧響應振動研究,得到臂架振動響應的幅頻曲線,並對結果曲線進行了分析,在此基礎之上,研究了油缸阻尼對臂架末端振動位移和振動加速度的影響。
  14. On the evening of december 23, in the main building of the new buaa 102, block b, dai chenning, senior engineer from the microsoft asia academy of engineering, warmed buaa students vividly on the software testing knowledge, from which the students had benefited

    12月23日晚,在北航新主樓b座102 ,來自微軟亞洲工程院的戴謝寧高級工程師給熱情的北航學子生動地講解了軟體測試方面的知識,使同學們獲益匪淺。
分享友人