engineering change 中文意思是什麼

engineering change 解釋
工程改變
  • engineering : n. 1. 工程(技術),工程學。2. 開車技術。3. 土木工程,工事。4. 操縱,管理。
  • change : vt 1 改變,變更,變換,變革。2 交換;兌換;把(大票等)換成零錢;把(支票等)兌成現金。3 換(車、...
  1. Game analysis of engineering change in main body of construction project based on dissymmetry information

    建設項目主體工程變更行為博弈分析
  2. Engineering change order notice

    設計變更通知
  3. Ps : well the role included the familiarresponsibilities for a western oem quality director, including part and productstandard definition, measurement and validation, manufacturing product control, engineering change control, quality systems management and audit, qualityimprovement activities - from pre - production samples through to warrantyimprovement, metrology, product audit and part approval

    這個角色包括西方整車廠質量總監的職責,包括零件和產品的標準的定義、測量和認可、產品製造過程式控制制、工藝更改控制、質量體系管理和產品審核、質量改進活動(從零部件樣件的試生產到售後服務的改進) 、計量、產品審核和零部件認可。
  4. Quality planning and quality engineering activity in new product introduction and engineering change and qualification

    在新產品引進和工程變更,鑒定中,制訂質量計劃和策劃質量工程活動。
  5. Ecs engineering change schedule

    工程更改日程表
  6. Control engineering change with manufacturing department

    監控製造過程的工程更改。
  7. This paper aimed at enterprise ’ s abuses ? ? data - confusision, revision - mix, hard - findout etc. the practical problems involved in the information modeling during the implementation of pdm are studied, and three information models : personnel organization info model, product data info model and product structure info model are constructed. the product item forms are defined and the extraction methods of product information in iman are studied, a report forms system based on iman is developed. consequently, workflow management is also discussed, and two workflows : permission & release workflow and engineering change workflow are designed in the field of engineering

    具體研究內容有:對pdm信息建模中涉及的具體問題進行了研究,建立了實施過程中的人員管理、產品屬性和產品結構三個信息模型,開發了產品屬性表,並通過研究iman中產品有關信息的提取方法,開發了基於iman的報表系統;對工作流管理進行了闡述,從產品工程領域的角度研究企業的審批發放流程和工程更改流程,並設計了這兩種工作流程,同時,從橫向和縱向兩方面對企業的總體工作流程進行了分析,找出了其中的瓶頸,藉助設計的審批發放流程和工程更改流程對總體工作流程進行了優化。
  8. Take the lead of engineering change about product

    負責領導產品方面的工程變更。
  9. Eco engineering change order

    工程改動要求客戶
  10. Participate in stamping mold modification to meet engineering change requirement

    參與沖壓模具的修改以滿足工程變更的需要。
  11. Any design change or engineering change of the contracted products will result in a di osal plan of the existing finished goods stock

    供方或需方需要對本協議涉及的產品作設計或工程更改時,需協商處理已有的成品庫存。
  12. Any design change or engineering change of the contracted products will result in a disposal plan of the existing finished goods stock

    供方或需方需要對本協議涉及的產品作設計或工程更改時,需協商處理已有的成品庫存。
  13. Classification and control of engineering change in construction project

    建設項目工程變更的分類與控制
  14. Engineering change effect work order

    工程變更生效單
  15. Ecn engineering change notice

    工程變更通知供貨商
  16. Ecn engineering change notes

    工程變更通知供應商
  17. Engineering change effect date

    工程變更生效日期
  18. Ecp - engineering change proposal

    工程更改建議
  19. Ecp engineering change proposal

    工程變更建議書
  20. Setting up and the use of boms bills of materials, product routing production models, ecn engineering change notes, etc.

    項目資料之維護技巧設定物料清單工序的處理及工程變動的使用
分享友人