equipment cost 中文意思是什麼

equipment cost 解釋
設備成本
  • equipment : n. 1. 〈常 pl. 〉設備,裝備,配件,配備物品。2. (一個企業除房地產以外的)固定資產。3. (工作必需的)知識,技能,修養。4. (火車)車輛;(汽車等)運輸配備。
  • cost : n 1 費用;代價,價格;成本。2 犧牲;損害,損失。3 〈pl 〉訟費。vt (cost; cost)1 值,要價(苦幹...
  1. Electrical capacitance tomography ( ect ) is one of process tomography ( pt ) technique which is based on capacitance sensor, it can provide interior behavior 2 / 3 dimension visualizing information in process equipment such as closed pipe, vessels and so on in real time. ect has the advantage of being non - intrusive, fast in response, simple in structure, high safety and low in cost, so it is one technique which has great developing potential in field of petroleum, chemical engineering and so on

    電容層析成像( ect )技術是近年來發展起來的一種基於電容敏感機理的過程層析成像( pt )技術,可實時提供封閉管道、容器等過程設備內物場運動狀態的二三維可視化信息,具有非侵入、響應速度快、結構簡單、安全性能好、成本低等優點,是一種在石油、化工等領域很有發展前景的pt技術。
  2. The practice shows that method can effectively protect boiler and deoxidizer, consequently decreases maintenance cost and prolongs usable life of the equipment

    實踐證明,在除氧器內加藥能夠對鍋爐和除氧器進行有效保護,從而減少維護費用,延長設備使用壽命。
  3. The newly - built projects " construction supervision system should adopt independent social form and implement the supervision of omnibearing and full process ( mainstay project, field interplant project and the supervision manufacture of equipment ), which will be favorable to the optimal achievement of the project ' s general aim, cutting down the latent danger of quality and reducing the cost of operation and management

    高揚程梯級提水灌溉工程新建項目的建設監理制宜採用獨立第三方的社會監理形式,並推行從規劃設計到工程實施的全過程、全方位(主幹工程,田間配套工程,設備監造)的監理,以利於工程總體目標的最優實現,減少工程投運后的質量隱患,降低運行管理費用。
  4. The spray pyrolysis technique has a great application potential to be a method to prepare the economical tin dioxide film for its unsophisticated equipment, low - cost and high deposition rate. in this paper, antimony - doped snoa ( ato ) thin films were deposited onto soda - lime glass by the spray pyrolysis method, using metal salts snch ? 2h2o and sbcls as precursors

    噴霧熱分解法以其設備簡單、成本低、制備樣品快等優點成為一種很有應用潛力的制備sno _ 2薄膜的方法,另外噴霧熱分解法在鍍膜玻璃的工業化生產中有著廣闊的應用領域。
  5. During the on - loan period, the loanee shall inform the loaner in case that the equipment can not work normally, the loaner promise to service to door, within 6 hours to repair the equipment in its own cost & expense

    租用期間,如果機器發生故障,乙方應馬上電話告知甲方,甲方在6個工作小時內到達並免費為乙方維修及更換零件。
  6. The company is providing the high - quality product oem processes ministrant at the same time, can also provide the product market fixed position consults, and according to customer of the homologous material, semi - processed goods in offering product, reasonable equipment in etc. in a material and cost control serves, the marketing plans related with super and worth kit in service, at that time a core for freely for customer providing latest color spreading fashion information, latest a material appearing on market information, technical and latest section in the color cosmetic result, brand value refines, cultural excavation in brand, the brand that try hard for customer gives the deep culture content

    公司在提供優質產品oem加工服務的同時,還可根據客戶產品的市場定位提供相對應的原料半成品包材等合理配搭及成本控制服務產品市場定位分析咨詢服務營銷策劃服務等相關的超值配套服務odm ;免費為客戶提供最新色彩流行時尚趨勢分析;最新款包材的上市信息;彩妝技術的最新科研成果;品牌的核心價值提煉;品牌文化的挖掘,為客戶的品牌賦予深厚的文化內涵!
  7. Oec original equipment cost

    設備原值
  8. Unfortunately, the cost of equipment is prohibitive.

    遺憾的是,設備的價格昂貴。
  9. A life cycle cost simulation model of complex repairable equipment

    復雜可維修設備壽命周期費用模擬
  10. Abstract : the author stated the low cost retrofit using distributed control system to replace the existing control system of sulphuration equipment. the functional configuration of the distributed control system, the hardware and software of the system, and the communication between system and each layer of network are introduced in detail

    文摘:提出採用集散型控制系統對現有的硫化設備控制系統進行低成本改造,詳細介紹硫化車間集散型控制系統的功能配置,系統的軟、硬體設計,系統及各層網路之間的通信。
  11. Supervises and coordinates activities of production staff to ensure that production schedules are met, products quality, equipment maintain, cost control and employees management & training

    監督協調生產活動以確保生產計劃保質保量完成,負責設備維護,成本控制以及員工的管理與培訓。
  12. A united stimulation acquisition algorithm was designed for detecting the faulty circuits under automatic test equipment in order to decrease the test cost

    設計了適合自動測試系統進行模擬電路參數故障檢測的聯合激勵方式提取演算法以降低測試成本。
  13. This is due to the following two facts : the ill - posedness induced by the incompleteness of the observation data can make the solving much more difficult ; in addition, the observation system involved multiple sensors are required to compensate the inaccuracy of the observation equipment, which will inevitably make the cost of the computation prohibitively expensive

    這是因為,一方面,由觀測數據的不完全性等因素導致的病態現象往往會給逆問題的求解帶來很大困難;另一方面,由於觀測設備自身性能和觀測環境等因素的限制,要獲得更高的估計精度往往需要用多個傳感器對目標進行觀測,這必將給求解逆問題帶來由於計算量過大而難以實現的困難。
  14. In order to avoid mutual influence of variables in cost modeling on reliability growth of weapons and military equipment, the partial least - square regression is introduced

    摘要為消除武器裝備可靠性增長費用建模中自變量之間的多重相關性,引入了偏最小二乘回歸分析,並針對某型現役裝備使用階段可靠性增長費用數據進行了建模與分析。
  15. The most obvious characteristics of the adsorption method is its cost - effective to completely remove selected pollutants from flue gas until the absorbent is saturated. hence, this method can be effectively controlled and is commonly applied air pollution control equipment

    吸附法之最大特點,系能在符合經濟條件之操作范圍內,幾乎完全除去氣流中之某種成份,直至吸附劑容量到達飽和為止,故其控制效率極佳,為十分普遍之氣態污染物控制設備。
  16. The hlsip ' s newly - built projects carry out supervision system, which is favorable to improving investment environment, optimizing project design, improving the quality of projects and the project ' s adaptability to market. the innovated projects " supervision system is favorable to lowering the cost, changing the ageing of projects and bringing in advanced administration equipment and technology, enabling the projects get rid of the dilemma and step into the track of benign cicle

    高揚程梯級提水灌溉工程新建項目推行監理制有利於改善項目投資環境,優化工程設計,提高工程質量,使工程建成後有較強的市場適應能力;更新改造項目監理制的推行有利於降低工程運行成本,改變工程原有缺陷,引進先進的管理設備和技術,使工程盡快走出困境,逐步走上良性運營之路。
  17. The teacher must assure that the relative distance to mike is less than 0. 5 meter, so the movable scope of teacher is strictly restricted. the disadvantage of wireless mike is : the mike breaks easily and battery costs largely. the cost is high and it is difficul to manage the equipment

    授課教師必須保證與話筒間的相對距離不超過0 . 5m ,教師授課時的活動范圍受到了嚴格的約束。使用無線話筒的弱點是:話筒易損壞,電池耗電量大,使用成本高,設備管理麻煩,大量使用時存在串頻干擾,同時影響教師的外觀形象。
  18. The uncertainty of these variables causes the variability of factory ’ s capacity planning, especially for long range capacity planning in semiconductor manufacturing because of its shortening product life cycle, high equipment cost, etc. the uncertainty issue of long range capacity planning process in semiconductor manufacturing was studied in this thesis

    這些變量在實際中的不確定性,導致了工廠生產能力計劃的變動性。由於半導體產品生命周期日益縮短,生產設備造價昂貴等原因,工廠長期生產能力需求的不確定性在半導體製造業表現得更為突出。
  19. Long distance vhp wireless communication transmission requires only moderate transmission power and reasonable equipment cost, also the channel is very difficult to be destroyed

    利用超短波進行無線遠距離移動通信傳輸時,僅需要不大的發射功率和適中的設備費用。且其通信線路不易被摧毀。
  20. According to the characteristics and technical requirements, the thesis researches and developed the lubricant control system and computer controller for the multi - condensing unit. the equipment cost is reduced and the economic benefit is significant

    西安建築科技大學本文的主要內容是根據並聯機組的特點和技術要求,研製開發了並聯機組的潤滑油控制系統以及專門用於多臺壓縮機綜合管理的電腦控制器。
分享友人