erection of formwork 中文意思是什麼

erection of formwork 解釋
立模
  • erection : n. 1. 直立;樹立,建設;設立;架設;【機械工程】安裝,裝配。2. 建設物,建築物。3. 【醫學】勃起。
  • of : OF =Old French 古法語。
  • formwork : 模板;模架
  1. Especially, some new advanced techniques such as integral casting concrete, integral sliding formwork are firstly applied in this project in china. a new style bridge girder erection machine which can lift a piece of box girder weighting 300 tons once was designed and manufactured successfully

    特別是本工程首次採用的一次性整體澆灌混凝土工藝、整體滑動模板設計、以及300噸拆裝式架設機的研製成功,為今後同類產品的施工提供了一些新思路和寶貴的實踐經驗。
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  3. During the restricted hours in designated areas, the use of specified powered mechanical equipment for example, hand - held breakers and dump truck and or the carrying out of the prescribed construction activities for example, erection or dismantling of formwork and hammering is subject to more stringent control

    于限制時間內,在指定范圍使用指明機動設備例如手提破碎機及泥頭車及或進行指明建築工程例如搭建或拆除模殼或錘打均須受到更嚴格的管制。
  4. Erection of footing formwork for retaining wall no. 45 at cheung sha

    于長沙豎設擋土墻編號45的基腳模板
  5. The techniques of cast - in - situ concrete box girder by movable formwork bridging machine, which is a railway erection crane for bridge made up by universal rods, are effective, reliable and can use the exiting road for opporation

    摘要採用萬能桿件等常規材料拼裝的軌道走行式移動模架造橋機,能利用既有道路進行高架橋現澆箱梁施工,且工期短、效率高、安全可靠,適宜於城市輕軌交通中等跨度雙線預應力混凝土筒支箱梁的現澆施工。
  6. Nb39 erection of steel formwork for pier

    Nb39號橋墩-橋墩模板安裝中
分享友人