existing waterway 中文意思是什麼

existing waterway 解釋
現有河道
  • existing : adj 存在的,現存的,實在的 (opp extinct); 現行的,目前的。 the existing circumstances [conditi...
  • waterway : 水路,航路;【造船】水口,排水溝。
  1. Based on the experience of existing waterway regulation, using a great deal of field data, analytic data and existing research findings, the ragulate lead on the area from zhuqi to kegong in minjiang river are studied by using physical models and schemes are recommended in this thesis

    本文將在已有的航道整治經驗的基礎上,結合閩江大量現場實測資料、分析資料及過去的研究成果,運用物理模型對閩江竹岐至文山裡、科貢河段進行治導線研究,找出推薦方案。
  2. The significance of this thesis lies in proposing the suggested administration mode of waterway communications and transport according to china ' s current situation, offering useful references for the reform of administration communications system and the macroscopical decision - making of competent departments for communications in order to solve the existing problems in the administration of waterway communications and transport in china, to improve administrative efficiency, and to promote the development of waterway transportation

    論文的意義在於為解決當前我國水路交通運輸行政管理中存在的問題,提出了符合我國現實情況的水路交通運輸行政管理建議模式,為進行中的交通管理體制改革和國家交通主管部門的宏觀決策提供有益的參考,以提高政府的管理效率,促進水路交通運輸事業的發展。
  3. And a systematic analysis is also made on the features of funding for waterway construction and maintenance as well as investment scale and capital structure on waterway transport, port infrastructure and superstructure, and other related areas " construction in pass 10 years. the existing problems and courses within ways of raising funds at present for waterway construction and maintenance has also been pointed out in this paper

    論文首先對我國現行水運建設養護資金的來源進行了研究,系統分析了近10年來我國水運建設養護資金來源的特點,以及在航道、港口、水上運輸部門、水運其它建設方面的投資規模與結構,指出了我國現有水運建設養護資金籌措方面存在的問題和原因。
  4. China marine oil spill contingency plan is now in the process of improvement. the inland waterway oil spill is another important area remain to be explored in term of increasing accident rate and booming shipping amount in yang tzi river. the need for inland waterway oil spill contingency plan is imperative. at strategic level, this paper compares several existing oil spill risk analysis methods including " historical date analysis " and " comparative risk indexes ", pointing out limitation of them, and then apply the " comparative risk indexes " approach to " river segment " spill risk analysis, developing " river segment oil spill comparative risk assessment framework " this paper also take new approach to collision and grounding in river by stochastic modeling tanker traffic in narrow waterway

    本文在內河溢油反應戰略規劃層次上,分析現有的溢油風險評估方法,包括歷史數據統計法和比較風險評估法,指出相關方法的適用性和局限性;基於長江下游水道採用「區段」和「河段」雙層評估的思路,提出「長江下遊河段比較溢油風險評估模式」 ;將馬爾科夫狀態轉移的思想應用到船舶運動描述中,從隨機過程角度分析船舶在水道中的運行和事故發生,得出船舶事故概率計算模型。
  5. Article 20 : when building a water project or other construction project having adverse impacts on any existing irrigation water supply, source of water supply or the flow in navigation waterway, the construction unit of the project shall take remedial measures or otherwise pay compensation

    第二十條興建水工程或者其他建設項目,對原有灌溉用水、供水水源或者航道水量有不利影響的,建設單位應當採取補救或者予以補償。
  6. Mechanical environmental conditions existing in the cargo transportation by waterway

    水路貨物運輸機械環境條件
  7. Climatic environmental conditions existing in the cargo transportation by highway and waterway

    公路水路貨物運輸氣候環境條件
分享友人