extension project 中文意思是什麼

extension project 解釋
擴建工程
  • extension : n 1 伸長,伸展,延長,延伸,擴展,擴大;廣度,范圍。2 延期;〈美國〉(房屋的)增建部分,(鐵路等...
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. As one of the contracted agricultural technology extension project in shanxi province, the jinnan cattle feeding and management technical package exte nsion project, assigned by science and technology committee of shanxi province i n 1999, directed on the problems, such as extensive cattle feeding and managemen t, low sale percentage of commercial beef cattle, low meat production, low repro ductive survive rate of cows and poor economic returns, to increase the scientif ic contents and economic returns of cattle industry by adopting technical packag e including beef cattle crossbreeding, beef cattle feeding and management, cow ' s feeding and nutrition, calf raising, stover processing, and supplementation for grazing cattle in winter and spring etc

    「晉南牛飼養管理配套技術推廣」是山西省科委1999年度下達「山西省農村技術承包」項目,其目的是針對我區廣大農戶養牛飼養管理粗放、商品牛出欄率低、產肉率低、母牛繁殖成活率低、經濟效益差等缺點,通過採用肉牛雜交改良、改良肉牛飼養管理、加強母牛飼料營養、犢牛培育、秸稈氨化、放牧牛冬春補飼等配套技術,達到提高養牛業科技含量,增加養牛業經濟效益的目的。
  2. Major extension works at sheung shui and tai wai station will commence once the east rail extension project has been finalised. the hk $ 72. 4 million university station concourse extension project was designed by leigh and orange ltd., with kier hong kong being the main contractor

    大學車站擴建工程耗資約港幣七千二佰四十萬元,由利安建築設計及工程開發顧問(中國)有限公司負責設計工作,並由基利香港有限公司擔任承建商。
  3. The subject site mainly falls within the existing stt no. rdstst - 003 for the east rail extension project ( up to 31 august 2005 ), the proposed stt for kowloon southern link works area, the protection boundary for mtr ( i. e. mtr - rp no. 108 ) and the mtr construction limit ( mtr - rap no. 24 ). according to the scheme of the kowloon southern link gazetted on 26 march 2004, kcrc will continue to require the site for works area for a term from 1 september 2005 to 30 june 2008

    有關地點主要坐落於東鐵支線項目的現有短期租約第rdstst - 003號(有效至二零零五年八月三十一日止)和九龍南線的擬議短期租約的工程范圍、地鐵的防護邊界(即mtr - rp編號108 )及地鐵建設界限( mtr - rap編號24 )之內。
  4. This dissertation has five chapters. the first one is overall circumstances of the extension project of a certain navy yard ' s dock. through analyzing the dock ' s circumstances in the past and at the moment, two alternatives that can improve the dock ' s ability to repair naval vessels in varying degrees are described

    全文共分五章,第一章是某船廠船塢改擴建工程總體情況,主要對某船廠船塢建成以來的歷史情況和目前狀況進行分析,選擇能從不同層次提高艦船維修保障能力的兩個方案作為船塢改擴建工程項目的經濟評價方案。
  5. Xinji tannery zone extension project tanning industrial zone

    辛集製革區擴建項目製革工業園
  6. To counter the problems of bed leveling construction technology for the connecting part of new - old wharves in phase extension project of gravity wharf, this paper puts forward the construction technology of " construction at high tide ", and discusses some problems related to this technology

    摘要針對目前重力式碼頭續建二期工程在新舊碼頭接頭段基床整平施工工藝中存在的問題,提出「趁高潮」施工的工藝,並對此工藝所涉及的有關問題進行討論。
  7. Hydraulics test research on diversion sluice for extension project of taocha canal headwork

    陶岔渠首樞紐擴建工程引水閘水力學試驗研究
  8. Contractors claims on the mtr tseung kwan o extension project

    地鐵將軍澳支線工程的承建商提出的索償
  9. On the basis of brief introduction of danjiangkou dam extension project which is in the middle route water resources project of the south - to - north water diversion, the present construction methods and existing problems about key technology of increased artificial concrete keyway of jointing surface between new concrete and existing concrete are analyzed, and a new construction method by saw - cutting and static crack for construction of concrete keyway is researched

    摘要在簡要介紹南水北調中線水源工程丹江口大壩加高工程概況的基礎上,針對大壩加高中新老混凝土結合面新增人工鍵槽施工的關鍵技術,分析了現有施工方法及存在問題,研究並提出了新的鋸割靜裂法施工法。
  10. In recently ten years, it has compiled almost 300 reports of such various projects as the feasibility studying report of the natural rubber base of china, the proposal for producing 100000 tons special glue for hainan farms and land reclamation area, the feasibility studying report of extension project of kylin vegetable planting and kara glue processing for hinan dazhong linwei co, ltd., and the feasibility studying report of planting about 2000 hectare sisal for oriental sisal group of guangdong, of which 2 have won the second prize of excellent project consultancy given by hainan project consultancy association

    十多年間,編寫了各類項目報告近300個,其中《中國天然橡膠基地項目可行性研究》 、 《海南農墾生產10萬噸專用膠項目建議書》 、 《海南大眾凌偉有限公司麒麟菜養殖及卡拉膠加工擴建工程可行性研究報告》 、 《廣東省東方劍麻集團有限公司三萬畝劍麻種植項目可行性研究報告》等等,獲海南省工程咨詢協會優秀工程咨詢成果三等獎2項。
  11. Starting from july 1993, the research and extension project has covered 5 extra farmer ' s associations

    從1993年7月起,此研究與推廣計畫擴大到另5個農會。
  12. China xinji leather town extension project leather garment and goods export processing zone

    辛集皮革城擴建項目出口皮裝皮具加工區
  13. Key technical problems and related measures of survey and design of huning expressway extension project

    滬寧高速公路擴建工程勘察設計關鍵技術問題及創新對策
  14. You can customize the code used to create the isapi extension dll in the isapi extension project

    可以自定義用於在isapi擴展項目中創建isapi擴展dll的代碼。
  15. This thesis gives a brief introduction to basic theory of wind power, construction of wind farm and commissioning and operation of wind turbine by illustrating the 3rd phase extension project of ningxia electric power group co., ltd helanshan wind fram. based on the specific study on the engineering construction and the domestically and globally popular 850kw wtg, further by comparasion of the power output rate of g52 and g58, we can prove that with substitute of new material and new technology, larger capacity wtg will become popular. especially when the running diameter of blades enlarged, more power produced at same wind speed ; and the high efficiency will be further guaranteed if the gearbox, major shafting equipment be checked and maintained regularly

    根據對實際工程建設的具體研究,對我國及國際上主導機型850kw風機的具體分析,以及對g52和g58風機輸出功率的比較,更進一步證明在新的技術和材料替代下,更大型的風力發電機組將會替代現有主導風機機型,特別是在風機葉輪轉動直徑增大后,相應的輸出功率在同等風速下會有明顯增加,更好的利用風能並轉變為電能;齒輪箱作為風機中主要傳動設備,只有按維護要求並根據實踐經驗定期檢查易損部件,才能使風機安全高效的運行,提高風機的經濟運營效率。
  16. The compressor driven by steam turbine for no. 4 blast furnace and the collecting heat supply system is a modification and extension project of existent power plant in tisco

    高爐汽動鼓風站及集中供熱設施,是太鋼現有的發電廠的改擴建工程。
  17. Assist / support to the new plant extension project

    協助/支持工廠擴建項目。
  18. This project is a extension project

    該項目為擴建項目,在工廠原分廠擴建。
  19. Creating an isapi extension project

    >創建isapi擴展項目
  20. With the extension project still the active window, from the

    在擴展插件項目的窗口仍然保持活動狀態的同時,在
分享友人