falsework 中文意思是什麼

falsework 解釋
拱架
  1. Falsework - performance requirements and general design

    腳手架.性能要求和總體設計
  2. Falsework and formwork erection for stage 1 construction

    C2橋,第一期施工
  3. Methods of test for falsework equipment - floor centres

    腳手架設備試驗方法.第1部分:可調鋼梁
  4. Falsework construction around pier sb42 approached viaduct - deep water region

    C2橋第一期建造-臨時支架工程
  5. Erection of falsework for in - situ bridge deck construction at viaduct b1

    興建中的隔音屏地基興建中的高架橋橫梁
  6. Falsework - performance requirements and general design ; german version en 12812 : 2004

    腳手架.性能要求和一般設計
  7. Code of practice for falsework

    腳手架實用規程
  8. Erection of falsework for construction of bridge str08 near the pak kung au

    鄰近於伯公坳架設工作架為配合在該處興建橋編號str08的橋面
  9. Erection of falsework for construction of bridge str17 near the wsd catchwater

    鄰近於長沙引水道架設工作架為配合在該處興建橋編號str17的橋面
  10. Rc - masonry combination arch bridge makes rc arch ribs as former spanning structure and falsework of upper masonry ' s construction. finally, reinforced concrete and masonry together form arch ring

    它提出了以rc拱肋作為先期的跨越結構和後期高強石砌體砌築的施工支架,最終由石砌體和rc拱肋共同形成主拱圈的構思。
  11. These common methods include high altitude assemble construction in bulk, life - on segment by segment, integral life - on, integral hoisting, integral erect etc. some of these methods need a lot of falsework and others depend on devices for life - on or hoisting

    網架的發展也要求施工方法不斷更新和提高,以滿足工程技術和經濟的要求,從滿搭腳手架鋪設高空散裝,到分片吊裝、整體吊裝、整體提升、整體頂升。
  12. ( 2 ) the paper uses two methods to analyse the falsework structure and then get the basic data to guide the construction and installation of the falsework in sliding construction. these data play an important role in practice

    ( 2 )基於扣件式鋼管腳手架設計規范、鋼框架格構柱兩種方法對胎架結構受力進行分析,進而得出能指導滑移施工中胎架的構造及搭設的基本數據,其結果對工程實踐有重要的指導作用。
  13. Analysis the force on the falsework by comparison to three calculation methods, referring the designing standard steel tube scaffold of buckling element, lattice column of steel frame and the computer program of sap2000. the result provides strong guidance for practicing it

    基於扣件式鋼管腳手架設計規范、鋼框架格構柱及sap2000程序等三種方法對胎架結構受力進行分析、比較,其結果對工程實踐有重要的指導作用。
  14. The results of the research indicate that the assembled highway bridge steel truss is an effective means to resolve the common problems of falsework over river for construction of cast - in - situ prestressed concrete continuous girders

    研究表明,採用裝配式公路鋼橋桁架解決跨河預應力混凝土連續梁現澆混凝土施工支架問題是有效的。
  15. This paper mainly makes the research of construction method for cast - in - situ concrete box girder of continuous girder bridge, using assembled highway bridge steel truss ( often known as bailey truss ) as the falsework, technical schemes for the falsework erected over river, particularly the rigid slant supports of the falsework on piers, and analysis, calculation methods and deformation of the falsework in accordance with the related tests in field

    摘要主要研究了採用裝配式公路鋼橋桁架(通常稱為貝雷架)做為支架進行連續梁橋現澆箱梁混凝土的施工方法;研究了跨河施工支架的技術方案,特別是施工支架在橋墩上的剛性斜撐,同時結合現場試驗研究了施工支架的分析計算方法及變形。
  16. Rc - masonry combination arch bridge abandons the disadvantages of conventional masonry arch bridge ' s falsework type construction, which makes longer construction time, higher cost and against protecting environment. compared with double arch bridge, it has better arch ring ' s integer and smaller distortion in the stage of use

    Rc -石砌體組合拱橋摒棄了傳統石砌拱橋採用有支架施工造成的工期長,造價高,不利於環境保護的缺點;相比于雙曲拱橋,主拱圈具有整體性好,使用階段變形小的優點。
  17. Presents the basis content, load and condition of the design. the paper studies the integral curvilinear sliding construction for truss structure by using shape steel tube falsework for first time, which developes the technology of sliding construction

    重點分析了型鋼管胎架的材料、構造、製作、拼裝及搭設;胎架設計依據、內容、荷載及工況;首次在實際工程中採用型鋼管胎架進行桁架胎架整體曲線滑移施工,拓展了滑移施工工藝。
  18. And then in detail the paper explains the main technique in sliding construction, which includes jacking scheme, plan layout, assembly, transport and stacking of component, setting of sliding system, setting of track, conformation of falsework, traction facility etc. third, the paper researches on se veral key points which are sum - up about technics flow of sliding construction, the select of falsework by bearing capacity which was calculated through three methods, the theoretic discuss on auto - control, dynamic or static inspect and adjust

    然後對其中的重點問題作進一步的討論,包括滑移法工藝流程的總結;對胎架的選型參考腳手架的計算,運用規范、軟體程序等三種方法進行受力特徵分析,與已有腳手架試驗結果進行比較分析,得出較為符合實際的胎架承載力值;對滑移過程中的自動控制及動、靜態控制監測等做出了應用分析和理論上的探討。
  19. The paper describes the main techniques in the integral sliding construction for large span structure, which includes jacking scheme, plan layout, assembly, transport and stacking of components, setting of sliding system, setting of track, conformation of falsework, traction facility etc. discusses emphatically the sliding falsework, which includes the material, conformation, manufacture, welding and assembling of the shape steel tape falsework

    系統分析了大跨度鋼桁架胎架整體滑移施工中的起重吊裝機具的選擇與布置、施工平面布置、桁架結構拼裝單元及滑移單元劃分、滑移施工方案及工藝流程、桁架的連接、拼裝運輸、及堆放、滑移軌道布置、滑移滾輪構造、延伸平臺布置以及滑移牽引系統等諸多工藝問題。
  20. Couplers, spigot pins and baseplates for use in falsework and scaffolds - part 1 : couplers for tubes - requirements and test procedures

    腳手架和支承架用聯結件中心螺栓和踏板.第1部分:鋼管用聯結件.要求和試驗規程
分享友人