finish to start 中文意思是什麼

finish to start 解釋
完成開始
  • finish : vt 1 完畢,完成,結束;使…畢業,使…卒業。2 磨光,【機械工程】給…拋光;給…最後加工;潤飾,修整,整...
  • to : adv 到某種狀態;〈特指〉到停止狀態;關閉。 ★也常和動詞結合,略去其後賓語,而構成成語: The door i...
  • start : vi 1 〈美國〉出發,動身,起程。2 (機器)開動;開始,著手,下手,發生。3 突然出現,湧出;鼓出,突...
  1. A finish - to - start task dependency is created

    這樣就創建了一個結束-開始鏈接。
  2. This start to finish aspect of glassware manufacture places added burdens on the glassmaker

    整個從頭到尾的玻璃器皿製造過程給玻璃工人帶來了很多難題。
  3. At present the company has the ultra large scale production base, and supposes two galleries as salesrooms in addition, carries out " the plan, the assembly, the sale " the start - to - finish service

    目前本公司中除有超大規模生產基地外,另設兩個門市部畫廊,推行「繪制、裝配、銷售」一條龍服務。
  4. It adopts computer digital controlled system plc orientation mo dule touch scerrn to control, realizing x z w axis direction s precise orientation by ac servo system. in actual operation, just put the glass on the transmission belt, input drilling position data on the screen, press the start button, the machine will automatically position itself and finish all drilling operations, and automatically stop when the works is completed. this machine s two group drilling heads can work at the same time, one group drilling head is also ok. this machine has high drilling efficiency and accurate position, is an ideal choiceness equiment of scree - wall glass and other large specand volume production glass drilling

    該機採用計算機數控系統plc定位模塊觸摸顯示屏控制,由交流伺服系統實現x z w軸三個方向的精確定位。操作時只需將玻璃放在傳送帶上,在顯示屏上輸入鉆孔位置,按啟動按鈕,自動定位鉆削所有孔位,完成工作后自動停機。本機兩組鉆孔機頭可以同時工作,也可以單組機頭工作。
  5. To enable microsoft project to start each task at its proper time, you need to link the tasks to each other, based on their start and finish dependencies

    要使microsoftproject在恰當的時間啟動每一個任務,就必須根據任務開始和結束的相關性對任務進行相互鏈接。
  6. In pdm, finish - to - start is the most commonly used type of logical relationship

    開始-完成-緊前工序必須在緊后工序完成前開始
  7. For example, in the clockwork project, painting the walls precedes hanging the clocks, and those tasks have a finish - to - start link

    譬如,在鐘表裝置展覽項目中, 「粉刷墻壁」任務位於「懸掛鐘表」任務的前面,並且這些任務具有完成-開始鏈接。
  8. By default, the following procedure establishes a finish - to - start dependency between tasks

    默認情況下,下列過程創建任務間的結束-開始類型的鏈接。
  9. Finish - to - start ( fs ) is the task link most frequently used. start - to - finish ( sf ) is seldom used

    完成-開始( fs )鏈接是最常使用的鏈接類型,而開始-完成( sf )鏈接類型則很少使用。
  10. * * * * for example, if it ' s a finish - to - start ( fs ) link, the task begins as soon as its predecessor finishes

    譬如,如果是完成-開始( fs )鏈接,則任務的開始日期為其前置任務的完成日期;如果是開始-開始( ss )鏈接,則任務的開始日期為其前置任務的開始日期。
  11. Most likely, you ' ve linked many of your tasks with a finish - to - start ( fs ) link, so that the successor task does n ' t start until its predecessor task finishes

    很可能您已使用完成-開始( fs )關系鏈接了很多任務,因此後續任務要等其前置任務結束后才能開始。
  12. For example, if a task can start when its predecessor is half finished, you can specify a finish - to - start dependency with a lead time of 50 % for the successor task

    譬如,如果一個任務在其前置任務完成一半時可開始,則可以為其指定完成-開始相關性,且后續任務的前置重疊時間為50 % 。
  13. Tasks linked with a finish - to - start ( fs ) link add more time to a project ' s duration than tasks linked either with start - to - start ( ss ) or finish - to - finish ( ff ) links

    使用完成-開始( fs )鏈接的任務要比使用開始-開始( ss )鏈接或完成-完成( ff )鏈接的任務使項目工期增加的時間多。
  14. For example, if you need a 2 - day delay between the finish of one task and the start of another, you can establish a finish - to - start dependency and specify a 2 - day lag time

    譬如,如果從一個任務完成到其後續任務開始需要2天,就可以為該任務建立完成-完成相關性,並指定延隔時間為2天。
  15. Have abundant project construction management experience, from the start of the project, constuct to start construction and finish construction to check berore acceptance, independently complete the management and technique work

    專長興趣具有豐富的項目施工管理經驗,從項目的啟動、建設施工到竣工驗收,能獨立完成管理和技術工作。
  16. After you ' ve linked the tasks, however, you can change the link to a start - to - start, finish - to - finish, or start - to - finish link

    不過,在鏈接任務后,可以將鏈接更改為開始-開始、結束-結束或開始-結束鏈接(也可以指定前置重疊時間和延隔時間) 。
  17. There are four kinds of task dependencies in microsoft project : finish - to - start ( fs ), in which a task cannot start until another task finishes ; start - to - start ( ss ), in which a task cannot start until another task starts ; finish - to - finish ( ff ), in which a task cannot finish until another task finishes ; and start - to - finish ( sf ), in which a task cannot finish until another task starts

    在microsoftproject中,有四種類型的任務相關性:完成-開始( fs ) ,在此類型中,某一任務完成後,另一項任務才能開始;開始-開始( ss ) ,在此類型中,某一任務開始后,才能開始另一項任務;完成-完成( ff ) ,在此類型中,某一任務完成後,才能完成另一項任務;開始-完成( sf ) ,在此類型中,某一任務開始后,才能完成另一項任務。
  18. Click finish to start the migration process

    單擊「完成」開始遷移過程。
  19. If all your information is correct, click finish to start the process of creating your custom package

    如果輸入信息全部正確,請單擊「完成」開始創建您的自定義軟體包。
  20. But game 2 starter mike mussina openly endorsed wang as being a solid choice to start and possibly finish what is often the most nerve - racking of all postseason series

    不過第二戰先發投手穆西納已經為小民公開背書,穆西納認為,用小民來主投第一場,並且可能還將主投季后賽中最緊張刺激的第五戰,是個很恰當的選擇。
分享友人