finished water 中文意思是什麼

finished water 解釋
備好的水
  • finished : adj. 1. 完成了的,完結了的。2. 精巧的,製作完美的。3. 〈美俚〉死了的;完蛋了的。
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  1. Deposit solid human waste in catholes dug 6 to 8 inches deep at least 200 feet from water, camp, and trails. cover and - disguise the cathole when finished

    置排泄物的小洞必須六至八寸深,離水源、營地及步道至少兩百尺。事畢掩埋並掩飾。
  2. I finished shaving and put my face down into the bowl and washed it with cold water.

    我刮好臉,把臉浸到臉盆里,用涼水洗一洗。
  3. Soak finished compost in water to “ brew ” compost “ tea, ” a nutrient - rich liquid that can be used for foliar feeding or for watering plants in your garden, backyard, or houseplants

    水中浸泡后充分腐熟的堆肥「茶」是一種有豐富營養的液體,在您的花園、後院或室內植物栽培中可以直接作為葉面施肥使用或在澆水時混入。
  4. As soon as matthews finished working on a piece of wood she returned it to its water bath.

    馬修斯每處理完一塊木頭就立即把它放回水槽。
  5. Kangba dao ( but not typical ganzi dao, simplified scabbard ), hundred years old, hilt repaired, lack of accessory, iron finished dao ( running water grains ), unclear scabbard, maybe oxhide

    康巴刀(但不是典型甘孜刀,鞘簡化了) ,百年,刀把修過,缺零件,束鐵成刀(網上牛皮哄哄的流水紋) ,鞘看不清,可能是牛皮
  6. In addition, a complete refining installation must include the following : all necessary non - processing facilities ; adequate tankage for storing crude oil, intermediate, and finished products ; a dependable source of electrical power, material - handling equipment ; workshops and supplies for maintaining a continuous 24 h / day, 7 day / week operation ; waste disposal and water - treating equipment ; and product - blending facilities

    此外,一套完整的煉油裝置須包括以下設備:所有必須的非工藝設施:足夠的儲罐容量用以儲存原油、中間產品和成品;可靠的電力和物質處理設備來源;用於維持一天24小時,一周七天連續運轉所需的車間和物資:廢料和污水處理設備;以及產品調合設施。
  7. Mrs linton, on the third day, unbarred her door, and having finished the water in her pitcher and decanter, desired a renewed supply, and a basin of gruel, for she believed she was dying

    第三天,林敦夫人開了門栓,她的水壺和水瓶里的水全用完了,要我重新添滿,還要一盆粥,因為她相信她快死了。
  8. The infrastructures including the power supply, water supply, drainage works, roads and telecommunications etc have been finished. the new factory longqiu industrial park

    虯鎮是高郵市的工業強鎮,主要產業有服裝,塑料機械建材包裝特種水產品加工等。
  9. According to the fact of the engineering, the optimal modeling when fenhe first reservoir operated alone are first made. after getting the regularity, in order to consider fenhe second reservoir that had been finished essentially and shanxi wanjiazhai yellow river diversion project, not only the object of minimum water shortage for satisfying the water use demanded mainly by user are founded, but also the object of minimum the reservoir deposition was found. in order to prevent the water use demanded by city and industry from excessively concentrated water shortage, the object of minimum water shortage required to be the equable shortage

    本文在對來水分析基礎上,對太原市需水庫供水的用水進行了預測,結合工程實際,先對汾河一庫單獨運行時進行優化模擬,得出規律后,考慮已基本完工的汾河二庫及引黃南干工程,建立了以滿足用戶用水為主要目標的「缺水量最小」目標和減少水庫淤積的「水庫淤積量」最小的目標,其中「缺水量」最小目標要求是均勻的短缺,避免過分集中而影響了城市及工農業用水。
  10. From 1996 to 1998, as a project manager, i finished the studies on simple constructed venturi water film scrubber desulphurization technology and equipment for small and medium _ sized coal _ fired power plant. such studies are one of the projects required to rack one ' s brain with emphasis by ministry of science and technology in " ninth _ five _ year " plan. on the basis of the aboved researches, being entrusted with jiangxi provencial electric power bureau and guizhou provincial electric power bureau, we conducted the engineering feasible researches and preliminary design for nanchang power power plant and guixi power plant in jiangxi province, guiyang power plant in guizhou province, yongji power plant and taiyuan thermal power plant no. 2 in shanxi province to use venturi water film scrubber simple constructed desulphurization technology. the major technical targets of above consultation are around 70 % of desulphurization rate and improved dust removal efficiencies comparing with original efficiencies. the key features of this new technology are advanced and practical, low in investment cost, small in land occupied, suit for renovating the existing power plant and suited to chinese conditions

    1998年完成了"九.五"國家科技攻關項目< >的開發工作.在此基礎上,受貴州省電力局,江西省電力局,山西省電力局的委託,分別對貴陽發電廠,南昌發電廠,貴溪發電廠,永濟發電廠,太原第二熱電廠等進行了簡易脫硫技術的工程可行性研究以及初步設計等.上述咨詢內容中的主要技術指標是脫硫效率達到70 %左右,並可提高原除塵器的除塵效率.有投資低,佔地面積小,適合老廠改造,技術先進實用等特點
  11. 16 17 was finished in mid - july and the pond has now been re - filled with water

    基圍16 17第一階段推泥工程已於七月中完成,並已重新注水。
  12. Report on sanitary assessment on finished water from seawater desalination plant in dachangshan island of changhai county

    長海縣大長山島海水淡化廠工程衛生學評價報告
  13. But i shew d him how rather to cut it out with tools, which, after i had shew d him how to use, he did very handily, and in about a month s hard labour, we finished it, and made it very handsome, especially when with our axes, which i shew d him how to handle, we cut and hew d the out - side into the true shape of a boat ; after this, however, it cost us near a fortnight s time to get her along as it were inch by inch upon great rowlers into the water

    經過一個月左右的辛勤勞動,我們終于把船造好了,而且造得很好看。我教星期五怎樣使用斧頭后,我倆用斧頭把獨木舟的外殼砍削得完全像一條正規的小船。這以後,我們差不多又花了兩星期的工夫,用大轉木一寸一寸地推到水裡去。
  14. After finished pot, water is necessary, there is not kept water too much, which could be destroy the roots for more water in the pot

    栽好后馬上澆透水一次,以後看盆土干濕情況澆水,因為牡丹是肉質根,盆土不太宜濕,澆水過多,盆土長時間過濕,還會爛根。
  15. As with shaking, crushed ice should not be used, and water condensing on the outside shows that the cocktail is finished

    如同搖和法,該用冰塊而非碎冰;當調酒杯外水汽凝結時,雞尾酒即告完成。
  16. It was boiled in water, then baked, and was often finished with an almond icing

    在水中煮過后再烘焙,然後加入杏仁霜后製成。
  17. Testing of rigid cellular plastics ; determination of the water absorption of semi - finished and finished products by water immersion

    硬泡沫塑料的檢驗.用浸沒試驗法測定半成品和成品的吸
  18. Under the permitted conditions, the all - scale plant was made to pre - ozonation. the results showed : ( l ) the optimal advanced purification drinking water process should be " regular treatment + ozonation + biological activated carbon ". though pre - ozonation had no effects on ammonia nitrogen in the water of micro - pollution water source, instead the turbidity of pre - oxidation finished water was raised, it had effects on killing bacteria and removing algae, and controlling the growth of micro - organism

    得出如下結論: ( 1 )最優化的深度處理飲用水的工藝應該是「常規處理+臭氧化+生物活性炭」 ,如果投加預臭氧,對微污染水源水中的氨氮沒有效果,反而引起預氧化出水的濁度升高,但是對滅菌除藻,控制微生物的生長有一定的作用。
  19. After they had finished water - skiing, they took off to have fun in causeway bay

    滑飽水之後,一行人便出發到銅鑼灣繼續消遣。
  20. Generally speaking, the treatment can be carried out in combinations of pre - treatment, primary treatment, secondary treatment and advanced treatment and the application depends on the available raw water quality and the required finished water qualities as well as economic considerations

    總之,用水及廢污水的處理技術大致上可分為前處理、初級處理、二級處理及高級處理等處理方式,依據各種不同的原水水質及處理水水質之要求,以及經濟有效的考量下,選擇適當的處理程序組合進行處理。
分享友人