first phase of construction 中文意思是什麼

first phase of construction 解釋
一期工程
  • first : adj 1 最初的,最早的。2 最上等的,第一流的。3 基本的,概要的。4 高音(調)的。n 1 最初,第一;第...
  • phase : n 1 形勢,局面,狀態;階級。2 方面,側面。3 【天文學】(月等的)變相,盈虧;【物、天】相,周相,...
  • of : OF =Old French 古法語。
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. This test is based on homogeneous soil in foundation, and divided into two phases. the first is to stimulate the construction flow to excavate the pit ; the second phase is destructive test. because the pit is stable in the first phase and the research is point to the geometry shape of the failure surface, moreover, limited to the test condition, the effective surface force is applied to the pit

    此次模擬試驗主要是針對簡單均質的基坑土層進行研究,試驗分為兩個階段,第一階段主要是以相似工況模擬基坑開挖,第二階段主要是破壞性試驗,即由於在第一階段基坑在開挖范圍內能夠自穩,為使基坑達到破壞狀態以研究滑面幾何形態,限於試驗條件,採用「等代面力」的方式施加超載。
  2. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  3. Yangzhou kanglilai medical apparatus instruments co., ltd. is an enterprise specialized in the production of asepsis medical apparatus instruments and is located at beautiful landscape bank of the yangtze river and covers an area abut 20000mm2. the area of construction in the first phase is 7500 mm2 and 2000 mm2 of one hundred thousand grade purification workshop. this enterprise is a modern, garden style, brand - new hi - tech medical apparatus and instruments one

    揚州市康利萊醫療器械有限公司是專業生產一次性使用無菌醫療器械的企業.座落於風景秀麗的長江之濱.公司佔地面積近20000平方米.第一期建築面積7500平方米,十萬級凈化車間2000平方米.是一家現代化,花園式的嶄新醫療器械高新技術生產企業
  4. The emulation analysis of the first hole is presented in this paper because the third and fourth holes had n ' t inter observe apparatus during construction phase, the rational results provide feasible way for the other holes " preventing and repairing

    因3 # 、 4 #洞澆築過程中未埋設觀測儀器,所以本文對1 #洞進行了模擬分析,從而為其它洞室裂縫的預防和已有裂縫的處理提供理論依據。
  5. The first phase of master s work consisted of cleaning and disposing of unusable items and trash, which included fellow initiates excuses, lack of dedication and laziness. through the construction project, master pointed out our weaknesses and excuses so that we could clean up our spiritual practice

    師父所規劃的第一階段的工作包含了清理和丟棄一些小中心無用的雜物和垃圾,這些垃圾正顯露出我們喜歡找藉口缺乏奉獻的精神以及懶散怠惰的毛病。
  6. The last one gives a concrete concept on how to further thetbrm in our country ' s book distribution management system that is the key poiniand the base of this article. the first part of this thesis divides the historical progress of our country ' s bookdistribution management system into four phases, namely one - majorrthree - more - one - - less phase, thiee openness and one unite phase, uniform - opened andorderly - rivaled phase and the phase of the construction of modern marketingnetwork

    第三部分是對深化我國圖書發行管理體制改革的具體構想,它是本文的重點,也是本文的落腳點。文章第一部分將我國圖書發行管理體制改革的歷史進程分為四個階段,即「一主三多一少」階段、 「三放一聯」階段、 「統一開放、競爭有序」階段、建立現代化營銷網路體系階段。
  7. The first phase of construction is expected to be completed in late 2009

    此項目的第一期建築工程預期在二零零九年年底竣工。
  8. First phase of construction

    一期工程
  9. We currently plan to commence the first phase of construction of the recovery park in 20052006

    我們現時預計回收園的首期建設工程將於二五六年動工。
  10. The first phase of construction of production basis of ten thousand - level modification project has been finished and put into production, which can develop and produce pa6, pa66, pbt, pp, abs, pc, ppo and all kinds of plastic and alloy series materials

    萬噸級改性工程塑料生產基地的一期工程已完工投產,可開發生產尼龍6 、尼龍66 、 pbt 、 pp 、 abs 、 pc 、 ppo及各種塑料合金系列原料。
  11. It was estimated that the project would require 4, 300 million rmb. the close aqueduct project began on 28 august 2000. the first phase was the construction of the 50 kms aqueduct from taiyuan (

    該工程於2000年8月28日開始動工,第一期管道長50公里,由東莞太源至深圳雁田水庫,工程可望於2003年完成。
  12. Since the strain of erecting double contact wire of overhead contact system in urban rail transition is quite great, the author integrates the experience of construction of shanghai pearl line 1 in the first phase and holds that the application of equivalent load about strain to double wires in contact networks is safer and more reliable in the process of installement

    摘要基於城市軌道交通接觸網系統中雙承力索、雙接觸線張力比較大這一特殊情況,結合上海軌道交通3號線一期工程的具體實踐,介紹了張力等效負載法的應用方法及原理。
  13. The construction of the first phase of the cyberport and the new science park, both of which will create the necessary cluster effect, are progressing well

    數碼港第一期工程和新的科學園計劃進展良好,日後我們所需的專才會在此匯聚。
  14. The first phase construction of group networking security determined the organizing framework of security management, established integrated security strategy and networking security management system, and solved the problem of uniform defense and concentrated control for the w hole network virus, the security problem of transmission of the ddn special line, and the problem of accessing control of the important networks and networking servers by combining with corresponding security technique, anti - virus technique, firewall technique, invasion detected technique, and risk evaluation technique, etc, and implemented the security defenses for the weakest level ( transmission security of inter - region mainline network ) and kernel level ( multi - lans in first class secret units ) in the system

    集團網路安全一期建設確定了安全管理組織機構、制定了整體安全策略和網路安全管理制度,並結合相應安全技術防病毒技術、防火墻技術、入侵檢測技術、風險評估技術等,解決了全網病毒的統一防範集中控管問題、 ddn專線上的傳輸安全問題、重要網路及網路服務器的訪問控制問題等。實現了系統的最薄弱層(跨地域主幹網路傳輸安全) 、核心層(多個一級保密單位局域網)的安全防範。
  15. Yesterday morning the first phase of the beijing guanting windfarm project ' s 33 large wind turbines entered the last stage of construction, the giant fans with a diameter of 70 metres began to be hung from their bases

    昨天上午,北京官廳風電場一期工程的33臺大風車進入最後施工階段,直徑70米的巨大風扇開始向基座上弔裝。
  16. Founded on august 15, 1991 beijing economic technological development area is a national top - priority development area approved by the chinese central government. its first phase is of 15 square kilometers, of which quality infrastructure construction of 3. 256 sq

    北京中關村永豐高新技術產業基地位於中關村科技園區發展區海淀區永豐鄉界內,是中關村科技園區16個重點建設項目之一,是高新技術企業的中試和加工生產基地。
分享友人