flat arch 中文意思是什麼

flat arch 解釋
平拱
  • flat : n 1 〈英罕〉地板;(房屋的)一層。2 一套房間;〈pl 〉分宅公寓〈美國高級公寓叫 apartment house〉。...
  • arch : n 1 【建築】弓架結構;拱廊;拱門;弓形門;穹窿,拱洞,拱頂。2 弓形,半圓形。vi 1 【建築】作(成)...
  1. Abstract : the mechanical analysis for arch bridge with flat hinge joints is a mechanical problem with non - linear boundary. mechanical analysis of methods at present is not clear, which can not calculate the arch bridge with changeable section and section with complicate shape. in this paper, the new method used to get the section resistance coefficient k is presented, the iterative procedure is established to calculate the internal forces of arch bridge with flat hinge joints, and the computational example is given. the method can apply to the arch bridge with any numbers of flat hinge joints and any shape section

    文摘:平鉸拱橋結構的受力分析屬于邊界非線性力學問題,目前的一些方法受力分析不太明確,對變截面、復雜形狀截面等平鉸拱橋無法進行計算.針對這種情況,提出了確定平鉸截面抗力系數k的新方法,建立了計算平鉸拱橋內力的迭代演算法,並進行了實例計算,研究結果表明,這一方法對具有任意個平鉸、任意形狀截面的拱橋結構是適用的
  2. Comparison of the instable periodic heat transfer calculation of semi - circular arch and flat roof

    半圓形拱頂與平拱頂周期非穩態傳熱計算
  3. Due to exceedingly flat arched vault of the flat tunnel with outsized span and renewed stress allocation in surrounding rock after excavation, which would inevitably induce some excessively large load on the base of arch, therefore, larger load - bearing capability in the is " foundation is a must. on the other hand, smooth face explosion must be applied to excavation of the arch base to further ensure the integrity and continuity of country rock around tunnel

    特大跨超淺埋隧道拱部結構過于扁平,開挖后發生二次應力分佈,拱腳處的應力過大,要求有較大的地基承載力,拱腳開挖時必須採用光面爆破,保證圍巖的完整性和不受擾動,開挖后及時封閉,防止該處積水軟化圍巖。
  4. Construction of flat tunnel of large span at extra - shallow depth must be conducted on the principle that advance grouting should be strictly performed before excavation and length of pull at one time should be short, together with reinforced support, immediate closing and constant monitoring and surveying. that preceding pilot tunnels, large - volume excavation divided into small ones, excavation of flank before that of center, upper before lower, arch before wall etc is a good method which could effectively reduce surface subsidence and its adverse effect on adjacent buildings, in addition, some other measures are also taken to lessen blast - induced vibration in the ground and surrounding structures. in a word, all means and steps mentioned above have already proved effective and practicable in practice

    軟弱大跨超淺埋扁平隧道必須按「管超前,嚴注漿,多分部、短開挖、強支護、快封閉,勤量測」的施工原則進行施工,採用「眼鏡超前,化大為小,先側后中,先上後下,先拱后墻」的施工方法控制地表沉降和對周邊建築物的影響;採用「多分部,化大為小,短進尺,密布眼,弱裝藥,設減振槽」 ,控制爆破振動,經過實踐證明,這些方法都是行之有效的。
  5. Insulators and fittings for overhead lines. metal fittings. semi - horizontal flat arch configuration

    架空線路用絕緣子和配件.金屬配件.半水平
  6. To investigate the function of concrete slabs and the effect of concrete construction on narrow composite space truss flat arch bridges, and to compare the results of linear analysis with the results of nonlinear analysis, finite element analysis of a typical engineering is undertaken

    摘要為研究混凝土面板的作用以及混凝土施工對窄扁拱形組合網架橋的影響,比較線性與非線性分析結果之間的差別,對一典型工程進行有限元分析。
分享友人