float period 中文意思是什麼

float period 解釋
〈美國〉課間休息。

  • float : vi 1 漂浮,浮起 (opp sink); 飄流,漂流。2 (謠言等)散布。3 (公司)成立;(計劃)實行。4 (票...
  • period : n 1 時代;期;時期;期間;階段。2 〈the period〉現代,當代。3 周期;【地質學;地理學】紀。4 終結...
  1. Under the system of float commission, that the securities trader ' s income will drop in some period is already settled, that some originally medium and small securities trader who depend on the trade commission income will faced the test of survival is not sensationalism

    在新的浮動傭金制度下,一段時期內券商收入大幅度下降已成定局,一些原先僅靠交易傭金收入的中小券商生存將受到嚴峻考驗並非危言聳聽。
  2. In modem building, there are all kinds of building guarding glass, such as tempered glass, sandwich glass, hollow glass, float glass, coated glass, etc, these kinds of glass are of different features, but none of these glass types have heat - resistant and flameproof features. once there is a fire, tire, the glass will break in a very short period of time, whlch lets the fire spread and results in serious thread to life and property

    在現代建築上,用於建築物外圍護的玻璃有各種各樣,諸如鋼化玻璃、夾層玻璃、中空玻璃、浮法玻璃、鍍膜玻璃等等,這些玻璃性能各異,但是這些玻璃品種均不具備耐熱防火的功能,一旦發生火災時玻璃將在很短時間內破裂,使火災得以蔓延,人們的生命安全和財產受到嚴重威脅。
  3. 1 stable rate of return : usually bond has fix or float coupon rate and its principal and interest payments are paid back by the issuers in a certain period. outright purchase investors could obtain fixed income and the return is higher than bank deposit rate

    一投資報酬率穩定:債票上載有固定或浮動利率,按期償還本金或利息,投資人有確定收入,且往往高於銀行定存,利率下跌時更可享有資本利得而轉換公司債尚得以分享股票上漲之利益。
  4. Abstract : during treatment of a delayed schedule , specific deliberation of calculation on claim for extension of time should be paid attention to the following tasks ; because the critical path of a network might be changed from time to time and the appropriate utilization of float should be carefully considered in the actral schedule , therefore , the claim for extension of time can not be calculated only by the network , but the actual period where the cause of a delaed schedule is set should be considered , and should be calculated on the basis of the actual schedule which is approved by the supervising engineer

    文摘:在工期延誤處理時,工期索賠計算應特別注意:由於網路的關鍵線路可能發生變化,且實際進度計劃要考慮時差的合理利用,因此工期索賠不能僅按網路圖計算,而要考慮工期延誤原因的實際發生時間,按經監理工程師批準的實際進度計劃計算。