floor slab 中文意思是什麼

floor slab 解釋
(鋪設水泥樓面、地面的)水泥板。

  • floor : n 1 地板,地面。2 (樓房的)層。3 (船底的)肋板。4 (海洋、山洞等的)底。5 議員席;經紀人席。6 ...
  • slab : n 1 平板,厚板;(圓木解成板時外面兩塊帶皮的)背板。2 (麵包等的)片,厚塊;鐵塊;土塊。3 混凝土...
  1. Concrete hollow floor slab for rural houses

    農房用混凝土圓孔板
  2. The monitoring of cracks of floor slab at construction stage

    現澆混凝土樓板裂縫的施工階段試驗研究
  3. Prevention and causes of the crack of the reinforeeel concrete floor slab

    預制板縫開裂原因與防治措施
  4. Discussion on the deformation analysis of the cracks in cast - in - place floor slab

    談現澆樓板裂縫的變形分析
  5. Discussion on the causes and the countermeasures of the cracks on prefabricated floor slab

    預制樓板沿縫開裂的原因及對策
  6. Safety appraise and handle methods of insufficient in - situ concrete floor slab ' s thickness

    現澆混凝土樓板厚度不足的安全鑒定及處理方法
  7. The early - crack analysis and pre - control of ribbed floor slab placed by pre - mixing concrete

    用預拌混凝土澆制肋形樓板的早期裂縫分析和防治
  8. According to the new concrete code, the calculation formula are put forward concerning the load - carrying capacity during construction, the load - carrying capacity of cross - section bending, longitudinal shearing, the inclined - section shearing and part shearing during the application of the continuous composite floor slab, which provide the design proofs for the continuous composite floor slab

    摘要根據新混凝土規范,給出了連續跨壓型鋼板與混凝土組合板施工階段的承載力計算公式及使用階段的正截面抗彎承載力、縱向水平抗剪承載力、斜截面抗剪承載力和局部抗沖切承載力計算公式,為連續組合樓板的設計提供了依據。
  9. False ceilings are avoided so that floor slab thermal mass can be exposed in order to dampen temperature fluctuations

    人工天花被取消了,因此水泥樓板的熱量聚集暴露于外,用來抑制溫度的波動。
  10. It has been found out that using a prestressed concrete flat slab floor can decrease the thickness of the floor slab, improve forced property and service functions of the structure, and so as to save materials, reduce cost and prevent the cracks of shrinkage and temperature

    採用預應力混凝土無梁樓蓋可以降低樓板厚度,改善結構的受力性能和使用功能,而且能節約材料,降低造價,防止收縮和溫度裂縫的產生。
  11. Abstract : precast floorslabs are widely used in residential buildi ngs in order to quicken the progress of construction. yet some quality problems accoringly arise, one of which is the fissure along the splice of the precast floor slab. this essay analyses the causes of the fissure and puts forward some effecti ve measures for the prevention and cure

    文摘:在住宅的設計與建設中大量採用預制樓板結構,雖然加快了施工進度,但也出現了一些問題,預制樓板板縫方向產生裂縫就是其中之一,本文對其原因進行了分析,並提出了有效的防治措施
  12. The experimental result indicate that the working characters of the test floor slab is typically two - way obviously, the floor slab that is reinforced two - way by setting transverse steels through the rectangular cores in the ribs of the precast slabs, has excellent bulking property, high bearing capacity, cracking resistance and so on

    試驗研究表明,試驗樓蓋在加載過程中呈現了明顯的雙向受力特徵; pk預應力疊合樓蓋通過在預制構件板肋預留長方形孔穿置橫向鋼筋實現雙向配筋具有良好的整體性能,還具備承載力高和抗裂性能良好等特點。
  13. Secondly, through the examination and observation of the structural model of the cast - in - place pre - stressed compound floor slab system, under the normal usage load, the normal usage limit - state and the failing load, we have validated the space working - feature of the structural model under variable loads, including the rigidity, the crack, failing - state, failing load and the stress variation of the pre - stressed bar, and so on

    其次,通過對該體系的結構模型在正常使用荷載、正常使用極限狀態和破壞狀態下的試驗研究,驗證了現澆預應力復合樓蓋體系模型結構在各種荷載作用下的空間工作性能,包括剛度、裂縫、破壞形態、極限承載力及預應力筋的應力變化狀態等。
  14. Linking floors by removing parts of the floor slab or adding internal staircases

    將部分石屎地面拆除或加建室內樓梯,以將兩層或以上樓層相連;
  15. By means of field monitoring the strain in beam slab of partial building floors of a typical super - length prestressed floor slab after a period of their prestressing, the variation of stress with the temperature at different monitoring locations was given

    摘要通過對一典型超長預應力樓蓋的部分樓層梁板在施加預應力后一段時間內應變的現場監測,給出了不同位置測點應力和溫度的變化曲線。
  16. For example, a drywall partition system was used instead of the conventional brick construction and leave - in metal formwork used for the concreting of floor slab

    此項目大量應用低廢料量技術,包括採用乾墻間隔系統取代傳統磚墻結構,地臺灌漿亦使用了內留模板。
  17. On basis of the experiment of a pk prestressed composite floor slab under static water, its working performances are studied and analyzed

    通過pk預應力雙向疊合樓蓋的靜水加載試驗,本文對這種雙向疊合樓蓋彈性階段的受力性能進行了研究。
  18. The experimental studies and theoretical analysis showed that the cast - in - place pre - stressed compound floor slab system had good working performance and strong structural applicability, as well as is a ideal structure system

    試驗研究及理論分析表明:現澆預應力混凝土復合樓蓋體系工作性能良好,結構適用性強,是一種較為理想的新型結構體系。
  19. An innovative strengthening scheme for reinforced concrete space beam - column joints using high strength steel wire mesh and polymer mortar jacket was proposed, and the quasi - static tests of three reinforced concrete beam - column joints with floor slab and transverse beams were performed to verify the efficiency of the strengthening scheme

    摘要提出了採用新技術高強鋼絞線網片聚合物砂漿加固技術提高鋼筋混凝土空間框架節點抗震性能的方法,並通過3個帶有直交梁和樓板的空間框架節點試件的低周反復加載試驗對該加固方法進行了檢驗。
  20. On the basis of summarizing the main performance index of the current floor slab system, this paper developed a new structural shape - the cast - in - place pre - stressed compound floor slab system

    本文在總結目前樓蓋體系主要性能指標的基礎上,開發了一種新型結構型式?現澆預應力混凝土復合樓蓋體系。
分享友人