flow plan 中文意思是什麼

flow plan 解釋
輸送線路圖
  • flow : vi 1 流,流動。2 (血液等)流通,循環。3 流過;川流不息;(時間)飛逝;(言語等)流暢。4 (衣服、...
  • plan : n 1 計劃,設計,方案,規劃;方法;進程表;時間表。2 圖,圖面;平面圖,設計圖;示意圖;圖表;(街...
  1. In this paper, a safe, reliable, and intellectual control plan is provided aiming at the heat charge for dwelling district, which contains epigynous machine responsible for data processing and hypogynous mahcine responsible for unlocking the valve, by means of serial communication between them, combining homemade three - channel valve, to adminstrate the charge data and the valve efficiently. the main idea is based on the homemade three - channel valve. the vavle is locked at peacetime, while it is opened with the help of open tool and a water flow in the caliduct. as soon as the flow stops, the valve locks automatically. the open tool has data in its memory, and implement function by lcd and keyborad. so it can identify data and drive motor, to open the valve intellectually. the epigynous machine database manage system administrator the dweller information, standard heat charge and payment infomation etc, including store, configure, query, print etc, then store in the memory of open tool. as a result, the plan can do well in the experiment

    此閥平時是鎖閉的,只有用開啟器配以暖氣片中的水流才可打開,一旦水流斷開,則此閥會自會鎖閉。而開啟器則是根據其存儲器中的數據配以液晶顯示及小鍵盤,完成數據確認及電機驅動,自動對相應用戶的三通閥打開特定角度,完成開啟任務。上位機數據庫管理系統完成對用戶信息、熱費標準、繳費信息等原始數據的常規管理,包括存儲、設置、查詢、列印等,最後將處理后的數據傳到開啟器中存儲。
  2. Cash flow is rain glass of enterprise ' s management. the financial status of corporation is fundamentally determined by some aspects like production plan, system of stock and system of tick and return payment, which also influence the cash flow

    現金流量是企業經營的晴雨表,企業的生產計劃、存貨制度、賒銷和回款制度等都會從根本上決定企業的財務狀況,影響企業的現金流量。
  3. 5. according to tiansha river ' s water diversion and flow strengthen project that is determined by zero - dimensional model, the plan of tidal river networks is successfully calculated

    緊密結合江門市天沙河引水增流工程項目,根據零維模型確定的方案,對感潮河網進行了方案計算。
  4. Assembly plan should cover : calculation on amount of members and joints, assembling equipments ' choosing, assembly flow sequence, assembly method, progression plan, personnel management, steel members mobilization, quality standards, safety measures and special construction techniques

    編制的組織設計的內容應包括:計算構件和連接件的數量,選擇吊裝機械、確定流水程序、確定吊裝方法、制定進度計劃、確定勞動組織、規劃鋼構件進場、確定質量標準、安全措施和特殊施工技術等。
  5. In design flow modeling, a new design flow model definition method based on object oriented colorful petri net is put forward. in sub _ task dispatching, the task database, the task dispatch algorithm, the task dispatching time and its amending algorithm, the task dispatching execution plan etc. are designed. in version management, the version model of design object is built and the relationship between the linkers in dfms model and the version model about design objects is studied

    在相關的關鍵技術研究中,提出了一套包括通信模型的建立、通信原語的設計、通信服務器的設計等內容在內的被動式協同設計通信方案;設計了一種基於面向對象有色petri網技術的設計流程模型定義方法;提出了一種基於調度時間和資源狀況的子任務調度方案,並完成了任務數據庫的設計、子任務調度演算法的設計、子任務調度時間及其修正演算法的設計和子任務調度實施方案的設計等工作;建立了設計對象的版本模型,研究了設計流程模型的各種連接器與設計對象各種版本間的對應關系。
  6. In the past, more emphasis has been put on the flow pattern and the division ratio of water and sediment discharge. in order to study the division characteristics, a theoretic model is proposed in this thesis, which combines the plan configuration of channels with the minimum energy dissipation rate theory

    本文將河流動力地貌學中的平面形態和最小能耗率理論相聯系,研究分汊河道的分流特性,並推導理論分流模式;另一方面,通過建立二維水流數學模型,與理論分析結果進行比較。
  7. Further investigated and analyzed composition structure and flow data that dsa ' s formation of image is systematic at first in this paper, carried on intact summing up to the data in the system, having given out the plan of design of high speed and large capacity data channel of digital formation of image system of x - ray ; deeper discussion of control way on sdram, give solution that many pieces of sdram works togetherses of realizing heavy capacity, designing of heavy capacity deposit board realize storing at a high speed to vision data by frame on the basis of this ; through further investigations of interface of pci bus, optimize back end state machine design and urge procedure making with lower, giving intact pci interface scheme that realize high speed dma data transmission and satisfy request of video transmitting ; further investigate the figure systematic design method of programmable logic devices, due to the difficult point of drifting about of enabled signal in fifo in common use and setting up and keeping of output signal, method has been proposed of improving stability of system making use of signal utilizing the phase locking ring in fpga to offer a lot of clocks to move thus realize coordinating the data between every module of system to transmit at a high speed by making use of fifo

    本文首先對數字減影血管造影( dsa )成像系統的組成結構和數據流向進行了深入研究和分析,並對系統中的數據流向進行了完整的歸納和總結,給出了x線數字成像系統中的高速大容量數據通道的設計方案;在對sdram的控制方式做了深入探討后,給出了實現大容量多條sdram共同工作的解決方案,在此基礎上設計了大容量幀存板實現對圖象數據進行高速存儲;通過對pci總線介面的深入研究,優化後端狀態機設計和低層驅動程序開發,給出了完整的pci介面方案實現高速dma數據傳輸,完全可以滿足視頻傳輸要求;深入研究了基於大規模可編程器件的數字系統設計方法,針對通用fifo使能信號漂移、輸出數據難于建立和保持等設計難點,提出了利用fpga中的鎖相環提供多個時鐘相移的信號來提高系統穩定性的解決方案,從而實現利用fifo來協調系統各模塊之間的數據高速傳輸。
  8. Hardly anything goes the way we hope or plan that it will. i ' m being realistic. setbacks, roadblocks and disappointments are just part of the natural ebb and flow of life

    不是每件事都按照我們期望和計劃的發展。我們必須面對現實。挫折、障礙和不滿僅是沉沉浮浮的生活的一部分。
  9. Enterprise resource planning can put the plan, the purchase, the sale and the materials scheduling, the stock management organic all together. it plays role in the reduction of the cost of purchase and sale, the decreasing of the overstock, the acceleration of the cash flow, the controlling of the flow management of the stock materials and the purchase of the materials timely for the successful production

    企業資源管理將計劃、采購、銷售以及物資調度、庫存管理有機地結合起來,對于降低采購和銷售成本、減少庫存積壓、加速庫存資金的周轉和控制庫存物資的流程管理,以及及時采購和補充物資以保證生產的順利進行都將起著積極的作用。
  10. Study on the train flow organization plan for circle railway joint terminal

    環形鐵路樞紐車流組織方案研究
  11. Train flow analysis system for train formation plan

    列車編組計劃車流分析系統
  12. The design of train flow analysis system of train formation plan

    列車編組計劃車流分析系統設計
  13. It study carefully the distortion of the remote sensing imagery, the rectification of the radiant quantity, the rs image strengthen and the color fusion. based on these achievements above, we do experiment on the differential rectification, the rs image fusion, the object determining and the exchange for the different format data, propose the plan and flow chart of the terrain map rectification by the rs imagery. we demonstrate the method for the target location and the direction outside by the rs imagery and how to select the reference point and read the information of the rs imagery

    本文闡述了利用航天遙感影像進行1 : 25萬地形圖數據庫更新的必要性和可行性,在對spot和landsat遙感影像特性進行分析的基礎上,對航天遙感影像的系統變形、輻射量校正和影像增強與彩色融合等內容進行了認真研究,並在此基礎上對航天遙感影像數字微分糾正、影像融合、地物判讀、數據庫數據格式轉換、基於遙感影像的地形圖修測等方法進行了具體試驗,提出了利用遙感影像進行地形圖修測的具體方法和作業流程。
  14. The paper is based on wagon flow optimizing and aimed at optimizing the layout of section station. the author conducts the logistic conception, namely, wagon flow as logistic management. according to the amount of wagon flow in 2010 and 2015, the author establishes mathematical model to optimize train formation plan, at the same time, adopts heuristic algorism to work out the schema of wagon flow

    本研究是以車流優化為基礎,以優化襄石線區段站的設置的宗旨,分析了車流組織優化的國內外現狀,引入了物流的觀點,即車流的物流化管理,來研究車流組織優化,根據襄石線2010年和2015年的車流預測量和車流的特點及本身的實際現狀,建立了優化該線編組計劃的數學模型,並採用啟發式演算法求解出該線的車流組織方案。
  15. Its program pursues as follows : if plan institute is shown, telegraphic transfer money is regard settle accounts as the tool with cable, its are deferent direction and capital flow way are same, so cable is to arrange a kind when collect

    其程序如下圖:如圖所示,電匯是以電報作為結算工具,其傳送方向與資金流動方向相同,所以電報是順匯的一種。
  16. Also hoped fellow head nurses positively lead all nursing staff , earnestly carries out hospital each item to nurse the rules and regulations , the disease nurses the convention , nurses the instructions of technical operation and each item nurses the work flow , the disease risk predetermined plan and nurses copy clerk writing , " hubei province hospital management appraisal " center reaches the sign at one fell swoop in this

    也希望各位護士長積極帶領全體護理人員,認真執行醫院各項護理規章制度、疾病護理常規、護理技術操作規程和各項護理工作流程、疾病風險預案及護理文書書寫,在這次《湖北省醫院管理評審》中一舉達標!
  17. In order to solve the problems effectively, under the auspices of 863 plan in china, the synthesis diagnosis has been carried by means of measuring and numerical imitating the combustion chamber of refining column, and some conclusions is such as : ( 1 ) through measuring the temperature and combustion in the burning chamber of the refining column, the result shows the temperature difference on the same level is more than that in height direction, and there is a few of co in bottom of burning chamber. ( 2 ) in order to ensure normal work of flue system in lead column in the course of zinc refining, theoretic calculation and measure about the flow resistance of exhaust gas are carried through. the results of study reveal that drawing out force of chimney is inadequate, which is mainly caused by illogicality of flue construction

    在研究過程中,採取了現場實測和數值模擬手段對韶關冶煉廠鋅精餾鉛塔燃燒室及排煙系統進行了綜合診斷,具體結果包括如下: ( 1 )完成鋅精餾鉛塔燃燒室內溫度測試以及燃燒狀況的測試,結果發現:鉛塔燃燒室內水平方向的煙氣溫度並非均勻,而且其溫差比上下方向的溫差更大,以及鉛塔燃燒室尾部存在co未燃燼問題; ( 2 )為了保證鉛塔煙氣系統的正常工作,對煙道系統的阻力進行了理論計算及測試分析,結果發現:鋅精餾鉛塔煙氣系統中煙囪抽力不夠,這主要是煙道結構不合理所造成的。
  18. Design process flow diagram. support pfmea. support process control plan. take charge of operation instruction

    負責工藝流程圖編制,參與pfmea 、控制計劃編制,負責操作指導書編制。
  19. It is realized with some dynamic web techniques such as java, jsp, and developed with the framework of mvc model and kona architecture. this system is an integration of many function modules, such as basic data management, mrp management, main production plan management, bom management, workshop flow plan management, etc., realizing the non - gap connection between network and business flows of production control, so that it makes scientific, electronic and net management of enterprise production control management

    系統採用了java 、 jsp等動態web實現技術,以mvc模型為開發框架,並利用kona應用程序開發體系,集成了基礎數據管理、物料需求計劃管理、主生產計劃管理、 bom管理、車間作業計劃管理等子模塊組成等功能模塊,覆蓋了企業生產運作的各個環節,實現了網路與生產控制業務流程的無縫連接,構建了企業生產控制系統,從而實現了公司生產控制管理的科學化、電子化和網路化。
  20. Monitoring percentage ? measure of to what extent the agent is following the call flow plan

    監控百分比-衡量話務代表在多大的程度上按計劃流程進行。
分享友人