formwork 中文意思是什麼

formwork 解釋
模板;模架
  1. To study the flexural behavior, ultimate bearing state and laws of internal force redistribution of prestressed concrete continuous beams cast by different construction methods, the model tests for three pieces of the continuous beams were carride out, in which three kinds of the construction methods, such as those of lowering formwork supports at one time, transferring simply - supported structure into the continuous one and casting the beam by cantilever construction, were considered

    摘要為研究不同施工方法下預應力混凝土連續梁的彎曲性能、極限受力狀態及內力重分佈規律,進行了3根連續梁模型試驗,分別考慮一次落架、簡支變連續和懸臂施工3種施工方法。
  2. Formwork construction of 100 m high concrete chimney shaft

    百米混凝土煙囪內井架翻模施工
  3. Abstract : duri ng concrete deep well constructi on , because of thediffi culti es i n engi neeri ng geographi cal conditi ons , the ordi nary bilateral hydrauli c sli di ng formwork technology can not be adopted. therefore , an unilateral sli di ng formwork technology lifted by chai n block method can beappli ed to advantage and better solved the proble m

    文摘:在混凝土深井施工中,由於受地理環境的限制,不能內外安裝模板時,難以應用一般的液壓滑模施工技術,而採用單面模板、鏈條葫蘆提升滑模工藝,可較好地解決這一問題。
  4. In this paper the properties of the polymer modified cement mortar are studied of didy formwork concrete surface coated layer for protection. the emphasis is focused on the permeability and cracking - proof feature

    本文主要對模網混凝土聚合物改性水泥砂漿保護層的性能進行研究,著重探討了與耐久性密切相關的抗裂性能和抗滲性能。
  5. Reduce the use of timber by using alternative structural solutions ( e. g. metal hoarding, system form - work, metal form - work, semi - pre - cast flooring system, pre - cast roofing, dry walls and other structural means such as steel structural section, left - in formwork, etc. )

    改用其他結構方案(例如金屬圍板、標準化模板、金屬模板、半預制樓板系統、預制天面、干墻及其他結構措施,如鋼造結構架和內留的模板等) ,藉此減少使用木材
  6. Construction of turnover formwork in reinforcement chimney hydraulic lifting frame

    鋼筋混凝土煙囪液壓提升架翻模施工
  7. Carpenter formwork carpenter joiner concrete repairer

    木工(混凝土木模板) (釘板)
  8. Test study of pervious formwork

    透水模板的試驗研究
  9. Removal of the formwork for the bridge deck of str19 near the wsd catchwater

    鄰近於長沙引水道拆除橋編號str19的模板
  10. In this paper, the construction techniques of linjiangmen cable - stayed bridge in jilin, such as large sinking well technique of pier, climbing form panel technique of main tower, stay rope formwork traveler technique of girder and construction control, are summarized in details

    本文全面總結了吉林臨江門斜拉橋施工技術,詳細敘述了主墩大型沉井施工技術,主塔爬模施工技術,主梁牽索式掛籃施工新技術。斜拉索施工及施工控制等。
  11. During casting internal and external formwork are conneced together using tie forms, n. 2 bars diam. 15mm every 1. 5 m

    澆注混凝土過程中,內模,外模用穿墻螺栓連接,每1 . 5米設15毫米螺栓2條。
  12. The design of formwork for hau hoi wan elevated approach bridge, hongkong - shenzhen western corridor is presented

    摘要介紹港深西部通道后海灣高架引橋的模具設計。
  13. Falsework and formwork erection for stage 1 construction

    C2橋,第一期施工
  14. Compacting of concrete by vibrating ; compacting of in - situ by formwork vibrators

    採用振蕩法壓實混凝土.第4部分:用模板振蕩器現場壓實
  15. Research on the impermeability of concrete made with controlled permeability formwork

    透水模板對混凝土性能影響的試驗研究
  16. The main innovation of construction technique follows as : ( 1 ) development of new type climbing - formwork ( jpm ? i ), as well as corresponding technics of construction, quick speed of construction, good quality

    主要施工技術創新項目如下: ( 1 )研究開發jpm ? i型新型爬模及相應的施工新工藝,施工速度快,質量優良。
  17. The riveting and welding plant of the company has a very strong technical force, the technical personnel makes up more than 1 3 of the total staff, the company can also undertake the manufacture of various metallurgical structural equipment, formwork, gang board, oil tank, water tank, pipeline and dust - collecting and environmental protection equipment of various sizes, the company also undertakes the construction of bridge, concrete building as well as underwater and high - altitude operations from omniberaing etc. no matter what sizes and shapes of the forging and casting spare parts including special - shaped parts, we will never refuse you and promise to satisfy you with best quality and finish the task on schedule

    公司鉚焊廠,技術力量十分雄厚,工程技術人員,佔全體員工的三分之一以上,可以承攬加工各種金屬結構設備模板跳板油罐水罐管道工程各種型號除塵環保設備,再如橋梁鋼筋混凝土建築,水下高空全方位作業等,除些之外,關于鑄造鍛造等工作不論大,中,小型部件,也能做到來而不拒,保證,保質,保量按期完成任務。
  18. The last ten years, many civil governments are paying mucher regarding to the utilization of the high performance concrete. self - compacting concrete is fills formwork and encloses reinforcement itself on gravitation but not on forced vibration

    自密實( self - compactingconcrete )是指混凝土拌和物主要依靠自重,勿需振搗即可自行填充模型且包裹配筋的混凝土。
  19. In the construction of the tanghe inverted siphon on mid - roule of south - to - north water transfer project, some reliable construction processes and techniques are applied such as belt conveyor with three - rail gantry, construction with combined steel formwork, straight screw sleeve connection for reinforcement and the crushed stone - planting method etc., by which better construction effects are obtained

    摘要南水北調中線唐河倒虹吸工程項目施工中,根據工程特點,採用了三軌門架式皮帶布料機、鋼模板聯體施工、鋼筋滾壓直螺紋套筒連接、混凝土施工縫栽石法等可靠的施工技術和施工工藝,取得了較好的效果。
  20. Prefabricated timber formwork beams - requirements, classification and assessment

    預制木構架梁.要求分類和評定
分享友人