forward linkage 中文意思是什麼

forward linkage 解釋
前向聯系
  • forward : adv 1 向前,前進 (opp backward)。2 【航海】在船頭,向船頭(opp aft)。3 今後,將來。4 出來,出...
  • linkage : n. 1. 聯系;連鎖;聯動;連接。2. 【化學】鍵合。3. 鏈系,聯動裝置。4. 【電學】耦合;磁鏈;匝連。
  1. The most important result of the analysis has been that kumquat industry has the potential of forward linkage over any other social culture sector ( including the economy, environment as well as social items ), considering indices of the interindustrial sensitivity and its social efficiency

    未來若前向工業服務業集成,原料金棗轉型至加工金棗經營,是棗農比較容易接受的前向集成業務,但以從事生態環保金棗較之其他跨業方式,不論何種指針俱呈現相對明顯,乃因應全球化暨城鄉便捷化,未來金棗產業在地轉型時宜慎量之因素。
  2. The main work includes : the kinematic properties of a planner 4 - bar linkage are researched deeply using the assur group theory. the displacement, velocity and acceleration of each joint point in a motion period are put forward and their curves of the relevant points are plotted

    通過運動學分析,得出平面連桿機構在一個運動周期中各鉸接點的位置、速度和加速度以及各桿件的角速度、角加速度等運動學參數,並繪制出相應的變化曲線。
  3. This text studies and starts with from the current situation of the development of dragon boat game in an all - round way, put forward and set up scientific game management system, the system of laws and regulations, government make industrial support policy of the dragon boat game, and propagate the linkage of the media modernly, make countermeasures such as the game brand, etc. meticulously

    摘要從龍舟競賽發展現狀研究入手,從其發展的角度分析制約龍舟賽事市場的主要因素,分析龍舟賽事市場化運作途徑,並提出建立科學的賽事管理體制、法律法規制度、政府制定龍舟賽事產業扶持政策、與現代傳播媒體的聯動、精心打造賽事品牌等對策。
  4. Starting with the traditional theory of industrial cluster, taking the fundamental principles of industrial economics, ecological economics and west economics, and on the basis of the present situation of the high - tech industrial clusters of each country all over the world, and trying to construct a comparatively complete theoretical system of the high - tech industrial cluster theory, including high - tech linkage theory, high - tech convergence theory, high - tech coexistence theory, high - tech ecology theory etc. putting forward the scope of high - tech industrial cluster theory and bringing to light the inner relationship of the high - tech industrial cluster

    本文從產業聚群的傳統理論入手,以產業經濟學、生態經濟學、西方經濟學的基本原理為工具,以國內外高技術產業聚群區的發展現狀為研究基礎,構建了以高技術產業關聯理論、高技術產業波及理論、高技術產業共生理論、高技術產業融合理論、以及高技術產業生態理論五大理論為支柱的高技術產業聚群理論體系,提出了高技術產業聚群理論的研究范疇,並在該理論體系的基礎上進一步分析了高技術產業聚群現象的內在理論依據,揭示了高技術產業聚群的內在機理。
  5. Several examples are given to show the effectiveness of the analysis. ( 2 ) in chapter 3, the conditions for the coupler point of the five - bar linkage to locate at the boundary of the workspace are derived, and an algorithm to draw the workspace boundary is put forward

    ( 2 )在第三章中,先根據平面五桿機構連桿點總工作空間邊界的條件,得出平面五桿機構的連桿點工作空間求解演算法,並給出幾個算例來驗證此演算法的正確性。
  6. In order to make the mechanisms possess high efficiency, high stability, and low cost, a thorough study for constraints and overconstraints in the linkage mechanisms, self - adjusting mechanism and self - adjusting structures of the mechanisms, the degree of the influences of errors in different kinematic pairs on performance of the mechanisms, and the theory and method of designing for the mechanisms without overconsstaint was carried out in this dissertation. on the basis of the generalized constraints and on principle of designing and controlling the constraints advantageously, the conceptions such as basic constraint, statically constraint, and over - statically constraint were put forward for the first time

    論文的主要研究成果及創新點有以下幾部分: ( 1 )基於廣義約束的概念,從有利於設計和控制約束的原則,對機構及機械繫統中的常見約束進行了分類,首次提出了「基本約束」 、 「靜定約束」及「超靜定約束」的概念和分類定義;並首次將虛約束、重復約束、消極約束、多餘約束、過約束等概念,從本質上統一起來進行定義,將其都統一稱為「過約束」 。
  7. It puts forward that the open degree of coal reservoir increases with the enhancement of major stress difference by means of the linkage of maxim major stress difference and coal bed physical quality. when major stress difference is larger than loompa, permeability of coal reservoir is larger than 1. 0md

    通過最大主應力差與煤層物性的耦合,認為煤儲層裂隙的張開度隨主應力差的增強而加大,主應力差100mpa時,煤儲層滲透率1 . 0md 。
  8. Put forward the emphasis of preparing work and trial run before a new built pet plant start - up, including working out the network plan, washing the equipment and pipe system, calibrating the plant, and making the leakage test, the linkage and feeding trial run

    摘要提出了新建聚酯裝置投產前工作準備和試車工作的要點,包括網路計劃的編制,設備及管道系統的清洗,裝置的標定,泄漏試驗,聯動試車及投料試車。
分享友人