fractured zone 中文意思是什麼

fractured zone 解釋
斷裂區
  • fractured : 斷裂的
  • zone : n 1 【地理】(地)帶。2 區域,范圍,界。3 〈古、詩〉(腰)帶。4 圈,環帶。5 【數學】(球面)帶;...
  1. The following new opinions : without caving zone coal layer extraction in efflorescent oxygenized belts ; two effects of blocking water and preventing water flowing fractured zone from going on developing after mining effect ; appropriately enlarging the extraction thickness were presented

    提出了風氧化帶煤層開采無垮落帶;受采動影響后,具阻水和抑制導水裂隙帶繼續發展的雙重作用以及適當加大開采厚度等新觀點。
  2. Features and conceptual models of flow in fractured vadose zone

    非飽和帶裂隙巖體滲流的特點和概念模型
  3. Clear ship movements of the fractured zone are observed by extensometers.

    用延伸儀曾觀測到斷裂區有清楚的滑動。
  4. The ground base of the newly added chute in 4 tailings reservoir at dexing copper mine is characterised by thick weathered layer, loose structure, fractured zone and landslip mass accumulation. as a result, the ground has a great subsidence and inefficient carrying capacity. in view of this, the grouting technology was adopted to reinforce the chute ground base. the on - site testing shows that the subsidence of the chute has been efficiently controlled and the carrying capacity of the ground base improved so that the stability requirement has been met

    潘洛鐵礦主要使用的采礦方法是淺眼落礦的全面法和留礦全面法. 23礦體160m以上礦段上部為氧化礦和風化巖層,形成擠壓爆破和鬆散巖石覆蓋下的放礦條件.介紹了無底柱分段崩落法在該礦體開采中的應用.實際使用獲得的各項技術經濟指標還比較理想
  5. The main fractured zone runs in the n75°w direction and is crossed by two long pipes.

    主要破裂帶的方向是北75西,在它上面架兩根長管。
  6. Measuring method on height of water flowing fractured zone using loses of drilling fluid

    導水裂縫帶高度的鉆孔沖洗液漏失量觀測方法
  7. Groutting off technical in fractured zone

    斷層破碎帶注漿堵水技術
  8. Support with binding bar, bolting and shotcrete for large cross - sectional chamber in fractured zone

    破碎帶大斷面硐室綁筋錨噴支護
  9. Practice of consolidating the fractured zone in the permanent pillar by steel reinforced concrete shear hole

    鋼筋混凝土剪力洞加固永久礦柱中破碎帶的實踐
  10. < uk > the main fractured zone runs in the n75 w direction and is crossed by two long pipes. < / uk >

    < uk >主要破裂帶的方向是北75西,在它上面架兩根長管。 < / uk >
  11. Visual numeric simulation of the height of fractured zone in no. 2 northern working area in donghuantuo mine, kailuan

    開灤東歡坨礦北二采區冒裂帶高度可視化數值模擬
  12. Axisymmetric numerical model for original casing - eroded wells is established through hydraulic fracturing numerical simulation, and it can help to determine the relationship between distance limit from casing erosion point to fractured zone and fracturing pressure, so as to refrain from casing erosion recurrence in original easing eroded wells

    摘要為解決套損井修復后水力壓裂施工時重新出現套損,以及確定套損點到壓裂層的距離界限,通過對水力壓裂過程的數值模擬,建立了套損修復井的軸對稱計算模型,得出了套損點到壓裂層的距離界限與施工壓力的關系。
分享友人