framed construction 中文意思是什麼

framed construction 解釋
構架建築
  • framed : 被陷害,遭栽贓
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. Continuous rigid - framed and box - typed bridge of middle span. according to the wording feature of pc. continuous rigid - framed bridge in cantilever casting construction, every kind of temporary measurement has been analyzed

    中等跨度預應力混凝土箱形連續剛構橋橋跨布置時,為方便施工及減小主橋橋長,邊跨跨徑在無特別要求的情況下,可考慮選用較小的邊、中跨比例。
  2. Close under the eaves of the stack, and as yet barely visible, was the red tyrant that the women had come to serve - a timber - framed construction, with straps and wheels appertaining - the threshing - machine which, whilst it was going, kept up a despotic demand upon the endurance of their muscles and nerves

    在靠近麥垛檐子下面的地方,當時在朦朧中可以看見那些女工們前來伺候的紅色暴君一個裝著皮帶和輪子的木頭架子當這個打麥子的機器開動的時候,它就要對她們肌肉和神經的忍耐力提出暴虐的要求了。
  3. In order to assure that the stress and strain state of structure is secure, the author analyses respectively the objective functions of the reasonable finished state and buckle - cable adjusted phase ; thus, the optimized model based on fga is framed. finally according to the example, the computation datum are compared with the iterative forward analysis method and the optimal control theory. the result shows that this method can be used conveniently and meet the construction and design precision

    為了滿足大跨度鋼管混凝土拱橋施工的安全性與成橋預期的內力狀態和拱肋線形,本文結合工程實例,分別對合理成橋狀態和扣索索長調整的目標函數的確定進行了分析,將一組多變量、多約束的最小化問題無約束化,從而建立起適合於該問題的遺傳演算法優化模型,將其計算結果分別與迭代前進法和隨機最優控制理論進行了比較;結果表明,採用該方法編制的基於結構計算的遺傳優化程序操作靈活,能很好的滿足施工和設計要求。
  4. This paper studies the key techniques involved in the construction of the deep water foundations, long - span prestressed concrete continuous rigid - framed girders and long - span concrete - filled steel tube arches of yichang changjiang river bridge on the newly built yichang - wanzhou railway, and also provides solutions to the possible problems thereof, which may be of certain guiding roles to the practical construction

    摘要對新建鐵路宜昌至萬州線宜昌長江大橋深水基礎、大跨度混凝土連續剛構梁、大跨度鋼管混凝土拱等施工過程中遇到的關鍵技術問題進行了研究,並對各個問題提出了解決方案,對實施性施工有一定的指導意義。
  5. 8 framed glazed doors will be identical in construction and will be designed to be removable for easy glass replacement without damaging the frame

    玻璃門構造可以在不破壞門結構的前提下,方便的更換玻璃。
  6. Also this paper analyzes the effect of different substructure constraint conditions or the size of pier on pier and beam in the light of the use of single - line piles with large diameter, taking into account the mutual effect of pile - earth - structure and the typical mechanic model used. with the analysis result of construction and traffic stages, the suggestion that single - line piles with large diameter claim precedence over all others is submitted in the design of continuous rigid - framed bridge of middle span

    對單壁樁柱式橋墩的連續剛構而言,當墩身尺寸改變時,墩身抗推剛度武漢理工大學碩士學位論文亦相應改變,從而對墩身及樁基受力影響顯著,且墩身受力與自身承載能力所要求的橋墩剛度成反比。
分享友人