full displacement 中文意思是什麼

full displacement 解釋
滿載排水量
  • full : adj 1 充滿的,裝滿的。2 充分的,豐富的;擠滿的;(吃、喝等)盡興的,3 (精神)飽滿的。4 完全的,...
  • displacement : n 1 轉位,移動;取代,置換;(人的)流離失所。2 撤換,免職。3 【機械工程】(活塞)排氣量;【航海...
  1. Uss lexington cv - 2 length overall : 270. 8m beam max : 39. 7m hull : 32. 2m displacement standard : 41187t full load : 43054t the lexington, was originally designated cc - 1, laid down as a battlecruiser 8 jan 1921 quincy, massachusetts. authorized to be completed as an aircraft carrier 1 july 1922, commissioned 14 december 1927. on 7 december 1941, lexington based at pearl harbor, when word of the japanese attack on pearl harbor was recevied, she immediately launched searchplane to hunt for the japanese fleet

    1927年12月14日開始進入美國海軍序列服役。 1941年12月7日,以珍珠港為基地的列剋星敦號收到母港遭到襲擊的消息,她立刻派遣偵察機搜索日本艦隊。 1942年5月7日,列剋星敦號的艦載機擊沉了日本輕型航母祥鳳號。
  2. According to the recorded full process fracture curve, the paper calculated and compared the fracture toughness ( kic ), the fracture energy ( gf ) and crack tip opening displacement ( ctod ) of the different strength grade boulder concrete and crushed stone concrete, it is found that the maximal load ( fmax ) and the fracture toughness ( kic ) of boulder concrete and crushed stone concrete increase when the strength of them increases, so does the fracture energy of boulder concrete, but the fracture energy of crushed stone concrete does n ' t obviously increase when it ' s strength increases. the crack tip opening displacement ( ctod ) of all specimens chang less when the strength of concrete increases, so it is concluded that the location of the axle in the ligament of the specimens is relatively stable

    根據記錄的全曲線,計算了不同強度等級的卵石混凝土、碎石混凝土的斷裂韌度k _ ( ic ) 、斷裂能g _ f以及裂縫的尖端開口位移ctod ,比較了不同強度等級卵石混凝土及碎石混凝土的斷裂韌度k _ ( ic ) 、斷裂能g _ f以及裂縫的尖端開口位移ctod的關系,發現卵石混凝土、碎石混凝土的荷載峰值fmax 、斷裂韌度k _ ( ic )隨強度增加而增加,卵石混凝土的斷裂能g _ f隨強度增加而呈增加趨勢,碎石混凝土的斷裂能g _ f隨強度增加變化趨勢平直,增勢不明顯。
  3. A load - displacement full - process analyzing program of cfrp - confined rc eccentrically loaded columns is given. the computed results of load - displacement coincide with test results

    編制荷載-撓度全過程計算程序對碳纖維布約束偏壓柱進行數值分析,程序計算曲線與試驗曲線吻合良好。
  4. In the full of research, the thesis constructed the dynamic equations of the simplified model, then programmed and computed the feedback gains using lqr method. moreover, the thesis plotted pictures of displacement, velocity, acceleration, bend and shearing force of ship ' s head and middle part in the condition of using cable and not using cable

    在研究工作中,首先對船舶的簡化模型建立了動力學方程,然後採用線性二次型最優控制方法,編寫程序並計算出船體垂向振動固有頻率和最優反饋矩陣,得到控制前後船艏以及船舯部的位移、速度、加速度、彎矩和剪力歷程圖。
  5. Although there have been many application instances in the field of input / output device technology, we need an specific project and technology route aimed at an given application. in this thesis, we combine the introduction and analysis of relative technology to describe the accomplishment of a coordinate collecting device which is based on incremental rotary encoder. this device is an specific device applied to collect the corrdinate displacement of ground image ’ s three - dimensional model created by full digital photogrammetric station. cpld chip and vhdl are applied in this device to carry out the following work : phase control of the electrical pulse created by incremental rotary encoder, counting the number of electrical pulse, controling the state of signal processing circuit, exchanging data between this circuit and pci control

    本文結合相關技術的介紹和分析,描述了一個基於增量式旋轉編碼器的坐標參量採集介面卡的實現,此介面卡是一種用於採集全數字攝影測量系統地面影像模型坐標位移量的專用設備,該設備採用cpld器件和vhdl語言實現增量式旋轉編碼器的脈沖信號鑒相和計數、信號處理部分的狀態控制以及和pci總線晶元ch365之間的數據交換和通信功能,同時該設備的驅動程序基於wdm模式,並且配置有結構良好的動態鏈接庫程序作為系統軟體和驅動程序之間的數據和控制交互中間介面,能夠方便地運行在windows98 / 2000 / xp操作系統平臺上,具有實時性強、工作穩定、通用性較好和性價比高等特點。
  6. Uss bb - 55 north carolina battleship length overall : 222. 1m beam : 33m draft : 10. 8m displacement standard 36600t full load 46700t the north carolina bb - 55 was laid down 27 october 1937 by new york naval shipyard ; launched 13 june 1940 and commissioned at new york 9 april 1941

    總長: 222 . 1米寬: 33米吃水: 10 . 8米正常排水量: 36600噸滿載排水量: 46700噸1937年10月27日,北卡羅萊納號戰列艦在紐約海軍造船廠鋪設骨, 1940年6月13日下水並於次年4月9日在紐約入役。
  7. Tow speciments of prestressed fabricated beam - column subassembly were tested under reversed cyclic loading. experimental studies were carried out to investigate the strain distribution, failure mechanism and load - bearing capacity on the beam - column connections, as well as ductility, hysteresis curves energy dissipation, displacement restoring capacity of full pc speciments

    本文通過兩榀預壓裝配式樑柱組合體在低周反復荷載下的試驗,了解了預壓裝配式框架梁端截面應變分佈、破壞機理和極限承載能力;探討了全預應力配筋截面延性特徵、滯回性能、耗能能力和變形恢復能力。
  8. Based on the experiment of full - sized cshb walls under lateral and vertical loads, initial crack - resisting stiffen formula was deduced by considering the influence of concrete beams, concrete core columns, structural columns, vertical pressure and window ( or door ). the results calculated from the formula were fit well with the experimental results. by the analysis of displacement at initial crazing, probability statistical mode and its parameters of relative displacement angle were presented

    在介紹和總結本課題的室內足尺寸單片墻抗側力性能試驗的基礎上,考慮了圈樑、芯柱、構造柱和墻體正壓力、開門窗洞等因素對抗側剛度的影響,提出了綜合各種因素的初裂抗側剛度公式,與試驗結果具有很好的一致性;結合試驗的初裂位移分析,給出了層間相對位移角的概率統計模式及相應的統計參數,提出了小砌塊建築層間位移角的控制標準。
  9. By using the method of error analysis of mbs, the identification equation of geometric error parameters is derived and according to the condition that the rank of coefficient matrix of error measurement equation group must be full, we can get 18 terms geometric error of 3 - axis nc machine tools and three displacement error and three position error

    應用誤差辨識軟體,解得各測量點的十八個誤差參數,即每個運動方向的三個位移誤差和三個位置誤差,再根據實際情況獲得三項垂直度誤差,得到了所有的21項誤差。
  10. Incorporation of kone technology and its mms modular design, original kone full - computer intelligent control system, 32 - bit networking micro - computer control, professional group control for 8 elevators, absolute value memorization of cars displacement, all these configurations fully ensure our passenger elevators excellent performance and powerful function. elegant interior car decoration bringing comfortable riding can satisfy different occasion and individualistic customer demands. passenger elevators with geared machine perform well and reliably

    引進通力技術,運用通力mms模塊化產品設計原裝進口全套通力全電腦智能型控制系統, 32位網路化微機控制8臺專家智能群控vvvf數字化變頻驅動轎廂位移絕對記憶,配置高端,性能卓越,功能強大能滿足不同場合和客戶不同偏好需要的轎廂裝潢與人機界面,精緻豪華,令乘坐舒適愜意傳統有電梯,經典可靠採用來自通力領先業界的永磁同步技術的小無機房電梯,節能環保,節省建築空間和造價。
  11. The load - displacement curves and moment - curvature curves that calculated from the full - course analysis program are in accordance with the resuits of experimental especially in prime period of ioad presents the program is avaiiable

    試驗和全過程分析得到的荷載-撓度曲線對比表明:在加載前期兩者的曲線吻合較好,證明全過程分析能反映碳纖維加固梁的受力特點及程序的正確性。
  12. Uss ticonderoga cv - 14 length overall : 270. 8m beam max : 44. 9m displacement standard : 27100t full load : 36380t the second long hull unit, ticonderoga was laid down in 1 mar 1943, commissioned in may of 1944, built by newport news. her first action was supporting landings in the philippines. in january 1945 the she was damaged by a kamikaze, but returned to support operations off okinawa and japan

    總長: 270 . 8米總寬: 44 . 9米正常排水量: 27100噸滿載排水量: 36380噸提康德羅加號航空母艦是第2艘長船體型埃塞克斯級航空母艦, 1943年3月1日在紐波特紐斯船廠鋪設骨, 1944年5月加入美國海軍服役。
  13. The full loading - displacement path had been traced, and the ultimate strength of the tubular joints had been determined. based on a series of numerical analysis of steel tubular t - joints, y - joints and k - joints of various geometric parameters, the effect of the various geometric parameters on ultimate strength had been investigated. the method of the reinforce joints had been offered

    針對不同幾何參數的t 、 y 、 k型方主管圓支管鋼管相貫節點進行系統的數值模擬試驗,分析各幾何參數對節點靜極限承載力的影響,得出節點靜承載力隨各幾何參數的變化規律以及節點的破壞形式,並給出了相應的節點加強方案。
  14. According to calculating and analysis, educes the distributing laws and their correlations of horizontal displacement and stress of stabilizing pile, anchor pull and earth press in two sides of pile, including the distributing of point repel force and internal force of pile at the terminal state, providing full theoretical basis for anchor cable and stabilizing pile structure design, strength check, stability check and determination of anti - slide force for a single stabilizing pile

    通過計算分析,得出了抗滑樁的水平位移、樁身應力、錨索拉力和樁側土壓力的分佈規律和它們之間的相互關系以及極限狀態時的樁的結點抗力和樁的內力分佈規律,為錨索樁的結構設計、強度校核、穩定性校核和單樁抗滑力的確定提供了充分的理論依據,同時也提出了錨索抗滑樁計算分析的一種新方法。
  15. The classic moment distributing method can be regarded as a special form in calculating continuous beams or rigid frames with no line displacement. so moment distributing method was used as cellular element method to do part parallel compute and full parallel compute. moreover, a few things on the visualized cellular element method were finished

    元胞單元法是面向未來用於大規模計算的并行計算機而提出的計算方法,但其作為并行演算法是否切實可行尚待考證,論文對此進行了討論,認為古典的力矩分配法是元胞單元法求解連續梁和無側移剛架的一種特殊形式,並按力矩分配法對連續梁作了局域并行和全域并行分析,對元胞單元法作為并行計算方法的可行性進行了理論探討。
  16. Neglecting the influence of concrete stress - path, relative program is presented to make full - process analysis on compression - flexure members confined with cfrp in the compression zone, a key research is to analyze the effect of some parameters including axial compression ratio, thickness of cfrp, concrete strength on strength capacity and displacement ductility of reinforced compression - flexure members

    在忽略混凝土應力路徑的影響下,編制相應程序對碳纖維布粘貼鋼筋混凝土壓彎構件進行了全過程分析及相關參數研究,並把計算結果與試驗結果進行了對比,兩者吻合較好。
分享友人