  1. A research over treatment of gushing water in geleshan tunnel

    7號斜井涌水地段注漿整治技術
  2. Water invasion bursten out during the railway - tunnel construction is usually the mainly problem in constructing or operating, also which brings surface water to exhaustion and pollutes environment or effects ecology, etc. the geleshan tunnel which crosses through guan - yin gorge anticline which trend is near south north, is located between tuanjie village and jingkou village of the shapingba zone, chongqing city, which is belongs to the inducting segment of yu - huai railway. the guan - yin gorge anticline appears to ridge and slot interlacing in land form, and is composed of clastic rock and carbonate rock from jurassic xintiangou group to triassic

    歌樂山隧道位於渝懷線引入段重慶市沙坪壩區團結村至井口村之間,隧道穿越近南北向的觀音峽背斜,地貌上表現為脊、槽相間,觀音峽背斜由侏羅系新田溝組至三疊系下統碎屑巖和碳酸鹽巖組成,歌樂山頂大部分出露可溶巖地層,地表巖溶發育,有大量泉水和暗河出口,並修建有多個中小型水庫、大量池塘和水井。
  3. First, on the base of investigating geleshan geologic environments, the author carefully analyzes them, studies their water storage structure, discusses the relationship of underground water dynamic changes and tunnel drainage by desiccation ; secondly, the author makes the dynamic analysis, regression analysis, routine hydrochemistry analysis, isotope analysis, so draws to guan - yin gorge anticlire east and west slot ' s karst developing features, alternated conditions underground water and supplying drain ways ; thirdly, by stating the fissuring ' s surveying data, the author calculates the seeping tensor

    作者在進行歌樂山地質環境調查的基礎上,仔細分析了大量觀測資料,研究其儲水構造,掌握地下水動態變化與隧道施工涌水的關系,及補給受降雨的影響情況。對隧道周圍的地下水進行動態分析、回歸分析、常規水化學分析以及同位素分析,得出觀音峽背斜東西翼槽谷的巖溶發育特徵,及地下水的循環交替條件、補給排泄途徑;統計分析裂隙測量數據,計算滲透張量。
  4. Disposition technology of sudden water leakage in geleshan tunnel

    歌樂山隧道突發性涌水整治技術
  5. Cause analysis and judgment about the geleshan tunnel ' s unstable rock mass

    歌樂山隧道不穩定巖體成因及判斷方法淺析
  6. Whether the geleshan tunnel ' s lots of water invasion during construction period brings about surround ground water or underground water drying, threatens sixty thousands persons and two hundreds enterprises " existence, and more leads vegetation to regress, or brings about ground ' s collapse, etc. is the necessary problem should be considered during the tunnel construction

    因此,歌樂山隧道在施工期間是否會由於隧道大量涌水,導致周圍地表水、地下水的疏干,威脅到山上6萬多居民和200多家企事業單位的生產生活。進而可能造成地表植被退化,甚至引起地表塌陷等多方面的負面影響,是隧道施工中必須考慮的問題。