geological condition 中文意思是什麼

geological condition 解釋
地質條件
  • geological : adj. 地質學的,地質的。 a geological survey 地質調查。adv. -ically
  • condition : n 1 狀態,狀況,情形;品質。2 〈pl 〉外界狀況,周圍情形。3 地位,身分。4 條件;【語法】條件子句。...
  1. Analysis on the minerogenetic geological condition of the gold ore in the lianhuashan anticline, western guizhou

    貴州蓮花山背斜金的成礦地質條件分析
  2. The following are such theories and methods as nonlinear theory considering interaction between support and rock mass, which, based on quantity analysis technology and actual data of initial crust stress, can simulate complex geological condition, carven shape and supporting so that provide important reference for analysis of stability of rock mass around underground carven and design of supporting

    隨之而來的是考慮支護與圍巖共同作用的非線性理論和方法。這些理論和方法一般都以數值分析為手段,以實測地應力資料為基礎,能模擬復雜的地質條件、洞室形狀及支護措施,從而為地下洞室圍巖穩定性評價和支護設計提供重要的參考依據。
  3. The vibration propagation is prodigious influenced by geological condition and the depth of tunnel. at last, linear method is carried to study the attenuation empirical formal of vl

    地質條件、隧道埋深對振動波的傳播影響較大,在離開隧道軸線一定距離存在一個振動放大區,在此區域內地面振動強度有所增大。
  4. The crackings on buildings in research areas are the result of multi - factors comprehensive action, buildings open fissure relation to the geological environment condition of the research area, such as regional stability, hydrogeologic condition, engineering geological condition, structure of building, exploitation shaking of gold ore, etc

    該研究區域房屋開裂是多因素綜合作用的結果,房屋開裂與該區城地質環境條件的變化密切相關,主要影響因素有:區域穩定性、水文地質條件、工程地質條件、建築物結構形式、金礦開采振動等。
  5. The inner factors refer to the mechanical behavior such as the rock type, density, construction parameter, etc. and the outer factors refer to the foundation condition, geological condition, valley shape, rise and fall of water level, seepage due to respiration

    內因是指堆石料的巖質巖性、密實程度、施工參數等組成壩體的各種力學性質;外因是壩址所處的基礎條件和兩岸的地形地質等條件、河谷形狀、水庫水位的變化、降雨浸潤等因素。
  6. A pilot study on gamda dam site engineering geological condition

    安達壩址工程地質條件的初步研究
  7. Complicated geological condition form models of oil - gas pool

    復雜的地質條件形成了盆地多類型的油氣藏。
  8. So far as the water conveyance project of dahuofang reservoir is concerned, a summary is made herein on the topography, geomorphy, regional structureal stability, stratigraphic lithology, geological formation, hydrogeological condition and the main engineering geological problems based on the geological investigation achievements got from the design phase of the project in combination of the actual geological condition revealed during the excavation concerned

    摘要主要針對大夥房水庫輸水工程,根據其設計階段的地質勘察成果,同時結合施工中已開挖揭露的實際地質情況,對地形地貌、區域構造穩定性、地層巖性、地質構造、水文地質條件、主要工程地質問題等進行了綜合評述,以期關心本工程的人士能對隧洞的工程地質條件有初步了解和認識。
  9. When the foundation and the intake tower are both important analytical objects, and the geological condition of foundation is very complex, the slope is meshed with tetrahedral element, while the intake tower is meshed with hexahedral element

    本文針對百色水電站的地基和進水塔均是主要分析對象,而地基的地質條件十分復雜,提出了非一致網格位移協調解法。地基採用四面體單元和進水塔採用六面體單元。
  10. We therefore suggest that the shortest line with a distance of 126km from pingtan islan, fujian to hsinchu, taiwan should be considered as the undersea tunnel line for its simple and stable geological condition

    因此,可以初步認為,從平潭到新竹一線,地質及地震條件較為穩定單一,可以考慮作為首選海底隧道線路。
  11. This paper expounds the overall geological condition in the urban region of linchuan city in which both the favouvable and the restricted factors are analysed. some tentetive ideas have been put foward on the evaluation and the division of geological conditions of land employment

    在較全面地闡述了臨川市城區土地利用地質條件的基礎上,分析了其中的有利因素和限制性因素,並提出了有關土地利用地質條件評價和分區的初步設想。
  12. Study of gas geological condition of shuoli coal mine

    朔里礦井瓦斯地質情況研究
  13. B ) soil nails support : according the geological condition, meeting the need of one nail and whole soil nails, the thesis confirm the length and number of soil nails

    B )土釘支護系列:根據工程地質條件,滿足了體系穩定性和單根土釘極限承載力的條件下,確定了土釘的長度和根數。
  14. Hydrologic station is a distributive organization and relates to geography location and geological condition

    水文站是一個離散分佈的對象,與地理位置、地質條件密切相關。
  15. Mechanical impact dynamics is used to analyse the production and spread of stress wave when hydraulic pile hammer hammerblows piles, the stress wave influence the course of driving pile. slender hammer that is equal to wave resistance of the pile can bring ideal stress waveform. when the hammer weight is constant, efficiency of driving pile can be increased by means of selecting drive cap and cushion pad of different rigidity to match the hammer according to various geological condition and the pile. the structure and principium of hydraulic system of double - acting hydraulic pile hammer with double cylinders is studied in detail in the paper, the hydraulic system and electric control system of six - ton - double - actin hydraulic pile hammer with double cylinder is designed on the basis of it

    本文應用沖擊機械繫統動力學分析打樁過程中錘體與樁撞擊時應力波的產生、傳播以及該波對沉樁過程的影響。認為與樁等波阻的細長狀錘體能夠產生理想的應力波波形;在樁錘重量一定的情況下,可針對不同的地質情況和樁,通過選擇不同剛度的樁帽和樁墊與其匹配來提高打樁效率。本文對雙缸雙作用液壓打樁錘液壓系統的結構和工作原理進行了深入的研究,並在此基礎上設計出六噸雙缸雙作用液壓打樁錘的液壓系統和電控系統。
  16. This paper introduces the situation of mine earthquake happened in the uptown in tongjialiang mine and the geological condition, probes into the working principles and procedures of transient electromagnetic method and high - density resistivity method, determines the worked - out section and worked - out scope

    介紹了同家梁礦住宅區發生礦震的情況和地質概況,探討了瞬變電磁法、高密度電阻率法的工作原理和程序,確定了礦震區域的采空層位和采空范圍。
  17. The paper researches the relations between blasting effect and blasting parameters, including diameter of drill, non - coincidence coefficient, hole spacing, hole row - spacing, cartridge diameter, charge per hole, density of line charge, charging structure and detonating manner, and how to adjust the blasting parameters to get the best blasting effect under the given geological condition

    本文在重慶市某高速公路合同段進行了現場預裂爆破試驗的基礎上,研究了炮眼直徑、不耦合系數、炮孔間距、炮孔排距、藥卷直徑、單孔藥量和線裝藥密度、裝填結構、起爆方式等爆破參數與爆破效果之間的聯系,以及如何在給定的地質條件下調整爆破參數獲得最佳的爆破效果。
  18. At the same time, according to the geological condition of a project in gaize county and its power demand, 9 different proposals were worked out for calculation and analysis, therefore a development proposal of pumped storage with wind and light as supplements was finalized as the best through selection and comparison

    以改則縣某工程為實例,針對其自然地理條件及對電能的需求,應用風、光、水互補系統分析模型,擬定了9個不同方案進行計算分析,經方案比選,提出了該工程風、光互補抽水蓄能電站的最優開發方案。
  19. First of all, it determines the scope in which earthquake might be genetated, the potential seismic sources areas and the upper limit of the earthquake magnitude through the analysis, research and evaluation of the area seismic geological condition of the workzone. secondly, according tothe research of the seismic activity, it also determines the seismic activity coefficients for per potential seismic sources areas, and the delay relation of seismic intensity and seismic accelaration, and then three different seismic intenstities and dynamic strength of bedroch under different probability are given. through the analysis and caculation of earthquake hazard with the analytic approach of probability

    首先,對工作區的區域地震地質環境進行了分析、研究、評價,確定了萊蕪市可能發生地震的范圍、潛在震源及其震級上限等。其次,根據對地震活動性的認識,確定了各潛在震源區的地震活動性參數及萊蕪市地震烈度和地震加速度衰減關系,在此基礎上用概率分析法對萊蕪市地震危險性進行了分析計算,得到了萊蕪市在三種不同概率水平下的地震烈度和基巖地震動強度。
  20. The geological condition for marliba reservoir project is quite complicated, for which some technical problems are to be solved there, such as the water conveyance structures have to be arranged on super - deep soft foundation

    摘要麻栗壩水庫工程地質條件復雜,存在需要在超深軟基上布置輸水建築物等難點技術問題有待解決。
分享友人