geology engineering 中文意思是什麼

geology engineering 解釋
地質工程
  • geology : n. 1. 地質學。2. (某一地區的)地質。3. 地質學的著作。
  • engineering : n. 1. 工程(技術),工程學。2. 開車技術。3. 土木工程,工事。4. 操縱,管理。
  1. As a new special bridge type, self - anchored suspension bridge has won more and more engineering ’ s favors with its beauteous build, economy performance and striving adaptability of geology and topography feathers. it has become a very competitive blue print of the urban bridge with the span from 100m to 400m

    自錨式懸索橋作為一種特殊的橋型,以其結構造型美觀、經濟性能較好、對地形和地質狀況適應性強等優點,越來越受到工程界的青睞,成為城市裡100 - 400m跨徑范圍內極具競爭力的橋梁方案。
  2. And the rock mass as the main object of most engineering practice is developed by all kinds of geotechnical action and force in the long geology history to the complex characteristic of continuous medium, crannied medium and granular medium, to the anisotropic and heterogeneous entity with elasticity, plasticity, viscidity, creepocity and rheology

    作為主要工程對象的巖體是在漫長的地質歷史發展過程中經受各種地質營力作用而形成的成因和構造復雜,巖性多樣且包含了連續介質,裂隙介質和散體介質特徵的,兼有彈性、塑性、粘性、流變性的各向異性的非均質地質體。
  3. The branch of mathematics known as integral and differential calculus serves as a natural and powerful tool for attacking a variety of problems that arise in physics, astronomy, engineering, chemistry, geology, biology, and other fields including, rather recently, some of the social sciences

    以微積分而著稱的這一數學分支,作為一個自然的強有力的工具解決物理、文、工程、化學、天地質、生物以及包括較為近期的某些社會科學等領域出現的各種問題。
  4. This thesis primarily makes below the work of a few aspects : ( 1 ) the method to append the section line in the geological section plane and the geological plane graph intersected each other ; ( 2 ) the principle and method that automatic determinate of orebody on transverse section with the neural network theory was presented, and draw the slippery boundary of ore ; ( 3 ) the method that drawing the surveying well and lane way engineering in the geological and survey graph ; ( 4 ) the method to automatic calculation and statistics output ore reserves and grade ; ( 5 ) the method that automatic creating the geology cross section of the hole ; this thesis realizes automation for managing geological graph based on the substantive research work

    本論文主要作了以下幾個方面的工作: ( 1 )提出了在相交平面圖和剖面圖中添加剖面剖切線的方法; ( 2 )提出了應用人工神經網路理論確定剖面中礦體界線的理論和方法以及礦巖界線圓滑的原理與方法; ( 3 )實現了礦山生產實測工程數據處理與地測圖件的有機結合; ( 4 )實現了礦塊地質品位和儲量的自動計算和統計輸出; ( 5 )提出了中深孔炮孔排面地質剖面圖自動剖切的原理和方法。本論文在大量研究工作基礎上,實現了地測圖件管理的計算機自動化。
  5. Practical design problems dictate that soil mechanics and engineering geology be closely related.

    實際的設計問題說明力學和工程地質學有著密切聯系。
  6. On the basis of field investigation and a lot of tests, the paper detailed researches the engineering geology properties of xigeda filling material. the distinction of the modulus of resilience was analyzed, and the influence of the intrinsic factors including moisture content, dry density, mudstone content and the external factors including compaction mode, paving thickness were adequately discussed. based on the researching how various factors influence the road compaction effectiveness, the author studied the relationship between modulus of resilience and roadbed compaction quality index, connected the compactness with modulus, and listed the data of the modulus in the various compaction area

    基於此,本論文在大量現場調查、室內外試驗資料基礎上,詳細研究了昔格達填料的工程地質性質;通過路基回彈模量特徵的研究,充分闡述了含水量、干密度、泥巖含量等「內因」 ,及壓實方式、松鋪厚度等「外因」對路基模量值的影響;在分析眾多因素對路基壓實效果影響的基礎上,開展了回彈模量與路基壓實質量指標間關系的研究,進而把現場壓實度與現場回彈模量有機的聯系起來,給定了不同壓實區間對應的模量值。
  7. Institute of hydrogeology and engineering geology, mlr, zhengding, 050803

    國土資源部水文地質工程地質研究所,正定, 050803
  8. The paper emphasizes the discuss of the problems of soil and rock engineering geology, researches the engineering characters of the soil of groundwork, analyses the subjects of the apply of the toft and the optimizing of using of the stake - base, brings forward and estimates the development direction of ning - yang county and the fitness of the development section, discusses the environment geology problem in the city and the surrounding, and suggests advices to the existing problems appearing in the engineering reconnaissance

    本文著重討論了寧陽縣城區的巖土工程地質問題,研究了城區地基土的工程性質,分析了城區地基的使用和樁基礎優化利用問題,提出並評價了寧陽城區的發展方向和開發區的適宜性,討論了城區及周圍的環境地質問題,並對當前巖土工程勘察存在的問題提出了建議。
  9. Virtual reality technology in engineering geology

    工程地質學中的虛擬現實技術
  10. ( 3 ) according to the actual geology situation in the material field, use the " alternation " principle of the value engineering analysis methods, and then find a better construction method to satisfy the requirement of rock - fill material, through using chamber blasting to substitute muffling and using an - fo to substitute ammonium nitrate explosive, and then huge economical benefits were gained, for example, the unit cost of its rock - fill material reduced from 11. 77 m3 to 7. 17 / m3, and directly reduced the total cost by 4. 26 million of cost

    ( : 3 )依據料場的實際地質情況,通過價值工程活動,利用價值分析的「代替」原理,在滿足堆石料功能不變的條件下,採用洞室爆破代替深孔梯段爆破,採用按油炸藥代替錢梯炸藥,使得堆石料的開采成本顯著降低,從投標價的h . 70元/ m3降低到7 . 17元/ m3 ,降低了4 . 53元/ mj ,以上壩堆石料94 . 2萬m 「計,直接降低成本426 . 75萬元,產生了巨大的經濟效益。
  11. This paper briefly describes topography and geology conditions of the danjiangkou reservoir, and analyses the influential factors and forms of bank caving, and adopts engineering geologic analogy method to predict the influential area and difficulty degrees of bank caving on the basis of wide investigation

    為了預測水庫坍岸范圍和發生坍岸的難易程度,對丹江口水庫的地形、地質條件和坍岸的影響因素和型式進行了分析。
  12. The paper applys ccd technology, digital photogrammetry theory, gis management technology and computer processing technology of image, combining the specialty of engineering geology catalog, to developing and studying the engineering geology catalog system based on digital image

    本文綜合運用ccd技術、攝影測量理論、 gis技術和計算機圖形圖像處理技術,並結合工程中地質編錄的一些特點,研究開發了數字影像的地質編錄系統。
  13. Chinese engineering geology is on the stage of continuable development

    邁向可持續發展的中國工程地質學
  14. An engineering geology analysis of the frature seepage of a conveyance tunnel of hydropower station

    電站輸水隧洞破裂滲水事故工程地質分析
  15. Study on main engineering geology problems of baixi reservoir diversion project water conveyance tunnel in ningbo city

    不平衡報價法在大連引碧玉皇廟隧洞工程投標報價中的應用
  16. The xuefeng mountain highway tunnel, which is to be constructed, is the most deep - lying and longest tunnel in our country. its geological conditions are more complex, the problems of rockburst and large deformation maybe its main problems of engineering geology

    邵懷高速公路雪峰山隧道是目前我國擬建埋深最大和最長的公路隧道之一,地質條件較為復雜,巖爆問題和大變形問題是該隧道的主要工程地質問題。
  17. Discussion on direction of environgeology, hydrogeology and engineering geology

    工程地質工作取向的討論
  18. The concept of gemm ( geology - engineering - mechanic model ) has been proposed in this thesis. gemm is a parameterized model consisted of representative units, boundary units ( including natural boundary and artificial boundary ), target parameters and key engineering information

    提出了gemm模型的概念,將gemm模型定義為:由等價體單元、界面單元(包括天然邊界單元和人工邊界單元)以及各地質單元的目標參數構成的,包含有關鍵工程信息並可直接應用於分析判斷和數值計算的參數化模型。
  19. Analysis and forecast about employment issues for graduate of geology engineering major

    地質工程專業畢業生就業情況分析與預測
  20. Application research for high energy strong rammer in deal with collapsed loess and unfavorable geology engineering

    高能量強夯在處理濕陷性黃土地基和不良地質體工程中應用研究
分享友人