geotechnical control 中文意思是什麼

geotechnical control 解釋
巖土工程管制
  • geotechnical : 地質工藝的
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  1. Construction of boundary crossing facilities and necessary link roads ; and associated civil, structural, electrical and mechanical, marine, geotechnical, water mains, fire services, environmental mitigation measures, street lighting, traffic aids, directional signs, traffic control surveillance system, landscaping and drainage works

    進行相關的土木結構機電海事土力水務設施消防設施環境保護街道照明設施輔助交通設備道路標志交通控制及監察系統環境美化和排水渠等工程。
  2. An expressway between the landing point of the proposed hzmb at the northwest lantau and the nlh ; and associated civil, structural, electrical and mechanical, marine, geotechnical, water mains, fire hydrants, environmental mitigation measures, street lighting, traffic aids, directional signs, traffic control surveillance system, landscaping and drainage works

    進行相關的土木結構機電海事土力水務設施消防栓安裝環境保護街道照明設施輔助交通設備道路標志交通控制及監察系統環境美化和排水渠等工程。
  3. In view of its characteristic, uses inspires crushing sand, erosion control seepage control continuous wall, erosion - resisting flexibility geotechnical engineering ge - bin - shi - long and so on synthesis processing measures to carry on the design

    針對其特點,採用振沖擠密砂石樁、防滲防沖連續墻、抗沖柔性土工布金屬網路石籠等結合處理措施進行設計。
  4. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  5. Ancillary works including drainage, geotechnical, landscaping works, construction of watermains and installation of fire hydrants associated with the road widening works, and the construction of noise barriers and retaining walls and installation of traffic control and surveillance system

    進行附屬工程,包括進行渠務工程土力工程環境美化工程水務工程安裝消防栓和豎設隔音屏障和護土墻及配置交通控制及監察系統。
  6. Furthermore, we are concerned that there was a significant number of slope failures involving new slopes which had not been subject to proper geotechnical control, and the practice of allowing the works departments the discretion of not making geotechnical submissions is at variance with the stated intention of the geotechnical engineering office ( geo ) that all the new slopes are subject to its geotechnical control

    此外,委員會關注到,涉及未受適當巖土工程管制的新斜坡的崩塌事故為數眾多,而且準許工務部門自行決定不呈交巖土工程設計文件的做法,與土力工程處所述的意向,即規定所有新斜坡均須由該處實施巖土工程管制有分歧。
  7. Composite foundation is a effective treatment method of soft ground, of the composite foundation, long - short - pile composite foundation can excavate the potential of the ground layer and availably increase foundation bearing capacity and control its settlement, so geotechnical circles have paid close attention to the long - short - pile composite foundation

    復合地基是一種行之有效的軟土地基處理方法,其中長短樁復合地基因其能充分挖掘地基土層的潛能並有效地提高地基承載力和控制地基沉降而引起巖土工程界的廣泛關注。
  8. Some 6. 5 km of noise barriers, including about 4. 8 km of vertical barriers ranging from three to seven metres high, about 0. 8 km of semi - enclosures and about 0. 9 km of full enclosures ; and associated traffic control and surveillance system, electrical and mechanical, building, drainage, landscaping and geotechnical works

    豎設長約6 . 5公里的隔音屏障,包括長約4 . 8公里高三米至七米不等的垂直式隔音屏障長約0 . 8公里的半開放式隔音罩和長約0 . 9公里的密封式隔音罩以及
  9. Since the introduction of effective geotechnical control in hong kong in 1977, and with concerted government effort over the past 20 years to reduce the risk from landslips to the community, casualties and disruption from landslips have been greatly reduced

    由一九七七年起,香港實施了一系列有效的土力工程管制措施,並配合政府各部門的努力合作,在過去20年間,因山泥傾瀉造成的傷亡和損失已大幅減少。
  10. Time domain reflectometry ( tdk ) is a new measuring technique in the field of geotechnical engineering, which has attracted more and more attention for its convenient, economical, digital and remote control properties

    Timedomainreflectometry (時域反射法, tdr )是一種新型的滑坡監測技術,具有方便,安全,經濟,數字化及遠程控制等優點,使滑坡監測效率得到較大的提高。
  11. The control of geotechnical aspects of construction works and upgrading of substandard slopes to reduce landslip risk, continue to be its main duties

    該處的主要任務,是改善不合標準的斜坡和對建築工程實施巖土方面的管制,以減低山泥傾瀉的危險。
  12. Ancillary works including traffic control and surveillance systems, electrical and mechanical systems, geotechnical works, drainage works and environmental mitigation measures such as noise barriers, low noise road surfacing and landscaping works

    相關附屬工程包括交通管制及監察系機電系土力工程渠務工程及環境緩解措施,如設置隔音屏障鋪設低噪音路面及環境美化工程等。
分享友人