ground loading 中文意思是什麼

ground loading 解釋
地面裝載
  • ground : adj 碾碎了的,磨過的,磨成粉的。 ground and polished piston 【機械工程】研磨活塞。n 1 地,地面;...
  • loading : n. 1. 裝貨。2. 裝載量;重量;載荷;(船隻等的)貨載。 3. 填充物,填料。4. 額外人壽保險。
  1. Together with the yellow hatched markings painted on the ground, these signs remind drivers not to hold their vehicles thereat after picking up setting down passengers or loading unloading goods

    這些標志配合髹在路面的黃色影線,提醒司機在上落客貨后不可停車等候。
  2. Fourthly, the solutions for non - axisymmetical dynamic responding of elastic circular plate ( thin and thick plate ) rested on transversely isotropic saturated half - space / layered ground subjected to arbitrary harmonic loading are presented. under the contact conditions, the problem leads to a pair of dual integral equations which describs the mixed boundary - value problem

    首先建立直角坐標系下波動問題的狀態方程,經雙重fo吐er變換求解狀態方程后得到傳遞矩陣:利用遞矩陣給出直角坐標系下層狀橫觀各向同性飽和地基在任意分佈簡諧荷載作用下穩態動力響應的一般解。
  3. The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project

    黃土地區的高等級公路建設中經常遇到濕陷性黃土問題,其病害類型主要是地基土受水浸濕后引起路基、橋臺、涵洞等的不均勻沉降,直接影響路基、構造物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對橋基灰土樁復合地基應用的可行性進行了深入分析,根據具體工程進行了合理的設計與計算,並配合現場靜載荷試驗及壓力盒實測數據,探討了基底應力分佈規律,樁土應力比,變形模量的變化關系,對比分析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承載力進行了整體評價。
  4. The thesis focuses on introducing the influence of blasting stress wave and blasting gas on broken rock and analyzing the relationship between the character of rock mechanics and possibilities of blasting, it mainly introduces the presence of ground station of emulsion explosive mixed loading truck in pragmatic technology home and abroad

    本文介紹了乳化炸藥混裝車及地面站國內外應用技術現狀和現場半成品,成品生產工藝,成品炸藥形成機理分析,闡述了混裝炸藥爆破施工的優越性。著重對乳化混裝炸藥在巖石深孔梯段爆破中的側向破裂范圍和底部破裂范圍值進行測試、並進行了分析和計算。
  5. Three kinds of springs were used to imitate different lateral stiffness of soft ground, and special drawers with sliding path were modeled as lateral displacement pile of embankment during its filling periods, with the function of reinforced - mat considered. on the basis of the data of tests designed by thogonal table l9 ( 34 ), three kinds of ( factor, depth of layer, loading ) state matrixes are obtained which could be used for procedure analysis by making use of the principle of information matrix conformation

    用彈簧模擬土體的側向剛度,用可滑動的特殊抽屜模擬軟基填築路堤坡腳的邊樁,並基於對邊樁側向位移速率影響程度室內模型試驗測試數據,利用信息矩陣構造原理,構造了總攬全局的、可用於過程分析的三種(因素、層位和荷載)狀態矩陣。
  6. At first, an analytical solution to one dimension consolidation of half - infinite homogeneous structural soft clay ground is derived, then analytical solution to one dimension consolidation of finite thickness homogeneous structural soft clay ground are given. in the meantime numerical solution to one dimension consolidation of layered structural soft clay ground is derived. furthermore, the calculation method of the consolidation degree of sand drains ground is given under the condition of instant loading, where soil structure characteristic is taken into the formula account

    建立了結構性軟土地基固結沉降的基本理論,獲得了半無限結構性軟土地基一維固結計算解析解,有限厚度結構性軟土地基一維固結計算解析解,成層結構性軟土地基的一維固結數值解以及考慮土結構性影響的砂井地基固結度計算方法。
  7. That is, the partially penetrating sand drain ground is viewed as the double - layered ground, and its consolidation is analyzed with 1 - d consolidation theory, through the transformation from 3 - d consolidation to 1 - d consolidation in the region of sand drain. this can overcome the disadvantage that the excess pore water is discontinuous between the region of sand drain and under - lying soft layer. to the double - layered ground, based on the consolidation mechanism under surcharge, the excess pore water pressure calculation formula is deduced under the condition of multilevel equably loading or unloading, which perfects the consolidation theory

    然後,在充分考慮豎井區井阻、塗抹作用以及土體結構損傷破壞對固結影響的基礎上,將未打穿豎井地基合理地轉化為雙層地基,按一維固結理論計算,克服了傳統固結計算方法在豎井處理區與下臥層交界面處存在孔壓間斷的缺點;在此基礎上,從超載預壓法的基本原理出發,分析了雙層地基超載預壓固結、沉降機理,推導了多級等速加、卸載情況下雙層地基的固結計算公式,進一步完善了雙層地基固結理論。
  8. Abstract : on the basis of chaotic model, this paper discusses the reasonable identification of relativistic deformation on ground capacity in plate loading test according to the result of the test

    文摘:以混沌理論模型的分析值為基礎,以現場載荷試驗的結果為依據,對載荷試驗法確定地基承載力時相對變形值的合理取定進行了論述
  9. The soft ground need to be treated in order to satisfy the demands of the settlement after loading of the highways because of its low bearing capacity and great deformation. the dry - jetted cement mixing pile ( djcm pile ) is one of the effective ways to reinforce the soft ground

    軟土地基由於其承載力低,受荷載作用后產生很大的變形,並且要持續較長時間長能穩定,往往需要進行人工處理才能使公路的工后沉降滿足規范的要求。
  10. Type nhss wire rope pulling hoist is widely suitable for use in bridge - construction, laying of large - size pipes, installation and adjusting of machinery an electric apparatus, and large reaction tower of petrochemical industry ; the installation and alignment of storage tanks ; erecting, fitting, welding and alignment of masts, steel concrete timber structures ; laying and translocating of rails and sleepers ; loading and unloading bulky heavy goods during transportation. cable tensioning ; demolishing of gallery supporting logs ; stacking forrestry wood ; and othersimilar cases. the hoist of this series is especially suitable for use in narrow working sites of limited space, where the job is high above the ground or in open air places, in tunnel of deep well, where no power for traction or lifting is available

    Nhss型鋼絲繩手扳葫蘆可廣泛用於建築施工、大型管道鋪設、機電設備和石油化工大型反應塔、儲罐的安裝、校準、鐵塔及其它鋼木結構的豎立、拼裝焊接、校準、鐵軌、枕木的鋪設、移位、交通運輸中笨重貨物的裝卸、電線張緊、坑道支撐木的拆除、林區木材的集放等等,對于局部空間受到限制的狹窄工作場所、高空作業、野外作業、坑道、深井作業和無機電供能場所的各種牽引、提升作業、選用本系列產品尤為適宜。
  11. Transfer lines from new above ground storage tank facilities, under the runways to a new truck loading facility

    輸油管線從新的地上儲油罐經過飛機跑道的底下直達卡車裝載設施。
  12. It indicts that, in the deep & thick soft ground improved by preloading or surcharge loading with sand drain partially penetrating, post - construction settlement mostly results from the dissipation of remained excess pore water pressure and the proportion of compress occurred in under - lying soft layer to total post - construction settlement is becoming larger with the time

    而後,結合工程實例,分析了超載預壓時間、超載大小以及豎井處理深度對深厚軟土末打穿豎井地基有效應力面積比r的影響,探討用r作為深厚軟土未打穿豎井超載預壓地基卸載控制標準的可行性。
  13. The example shows that the structural soft clay ground maybe destroys during the preceding loading. finally, strength increase and its utmost are discussed, associated with the analysis of the example, and some useful conclusions are obtained

    計算表明,預壓結構性軟土地基在加載填筑前期也很有可能會失穩破壞。
  14. Cargo & parcel loading and unloading in flight turnaround ground service is a multi - object parallel machines job sorting problem with time window and job shift time, its time window often be changed due to various reasons, machines service time is uncertain

    摘要航班過站服務中的貨郵裝卸作業調度是一類有時間窗和作業調整時間的多目標多設備并行作業動態排序問題,其特點是作業時間窗和服務作業時間動態變化。
  15. This thesis is systematically introducing the present situation about emulsion explosive of mixed loading truck technique and ground - based station technique. the field semi - manufactured product and finished product manufacture technology, and the formation mechanism finished product explosives are analyzed

    本文系統地介紹混裝乳化炸藥車及地面站國內外應用技術現狀,和現場半成品、成品生產工藝,成品炸藥形成機理分析。
分享友人