ground water drain 中文意思是什麼

ground water drain 解釋
地下水排水
  • ground : adj 碾碎了的,磨過的,磨成粉的。 ground and polished piston 【機械工程】研磨活塞。n 1 地,地面;...
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • drain : vt 1 排去(水等液體),排泄,放干 (away; off)。2 喝乾,倒空。3 用完,花光。4 使…某物枯竭;使…耗...
  1. That is, the partially penetrating sand drain ground is viewed as the double - layered ground, and its consolidation is analyzed with 1 - d consolidation theory, through the transformation from 3 - d consolidation to 1 - d consolidation in the region of sand drain. this can overcome the disadvantage that the excess pore water is discontinuous between the region of sand drain and under - lying soft layer. to the double - layered ground, based on the consolidation mechanism under surcharge, the excess pore water pressure calculation formula is deduced under the condition of multilevel equably loading or unloading, which perfects the consolidation theory

    然後,在充分考慮豎井區井阻、塗抹作用以及土體結構損傷破壞對固結影響的基礎上,將未打穿豎井地基合理地轉化為雙層地基,按一維固結理論計算,克服了傳統固結計算方法在豎井處理區與下臥層交界面處存在孔壓間斷的缺點;在此基礎上,從超載預壓法的基本原理出發,分析了雙層地基超載預壓固結、沉降機理,推導了多級等速加、卸載情況下雙層地基的固結計算公式,進一步完善了雙層地基固結理論。
  2. It indicts that, in the deep & thick soft ground improved by preloading or surcharge loading with sand drain partially penetrating, post - construction settlement mostly results from the dissipation of remained excess pore water pressure and the proportion of compress occurred in under - lying soft layer to total post - construction settlement is becoming larger with the time

    而後,結合工程實例,分析了超載預壓時間、超載大小以及豎井處理深度對深厚軟土末打穿豎井地基有效應力面積比r的影響,探討用r作為深厚軟土未打穿豎井超載預壓地基卸載控制標準的可行性。
  3. Engineering of functioning soil and water conservation have engineering prevented and protected for no - rock slope dug, engineering to drain on the ground and engineering to plant trees in the major engineering design

    水電工程主體工程設計中具有水土保持功能的工程主要有開挖形成的非巖石邊坡的防護工程、地表截排水工程和綠化工程等。
分享友人