head pull 中文意思是什麼

head pull 解釋
熱帽拉裂
  • head : n 1 頭,頭部,首。2 頭腦,才能;智力,想像力,理解力。3 前部,上部;頂端,尖突部;船長;(書頁等...
  • pull : vt 1 拉,拖,牽,曳 (opp push); 勒(馬)。2 拽住;扯破,扯開。3 拔去(雞等的)毛;拔(牙齒、瓶...
  1. Closed end blind rivets with pull mandrel and protruding head - a2 sst

    封閉式盤頭拉式心軸盲鉚釘. a2 sst
  2. If you twist in that way you will make me pull the hair out of your head ; and then i think you will cease to entertain doubts of my substantiality

    「要是你那麼扭動的話,你會弄得我把你的頭發拔下來,那樣我想你再也不會懷疑我是實實在在的人了吧。 」
  3. Unloose the cord from main body, pull up a cord, hang its head into the enclosure of the accessories, then cooling dress appliance works

    解鎖主體上的繩索,拉出繩子,將繩子頭部掛入附件孔內即可涼衣。
  4. Top drive head pull force push force

    動力頭最大起拔力加壓力:
  5. The pull rod is screwed into the inside thread of the anchor head.

    將拉桿旋入錨頭內的絲扣。
  6. The company is the speciality production " liuping " brand automobile hang the system forge the aluminium hang the system fittings s enterprise. our company except that can offer styles, such as audi, hongqi, passad, santana waited for model s the front wheel controls the arm, automobile aluminium suspension arms, pull rod assembly, pull rod ball head, the short axle of rear axle waited for product, or can also exploit in time, offer various kinds of product according to the user s request

    瑞安市得力標準件製造有限公司是專業生產「劉平」牌汽車懸掛系統鍛鋁懸掛系統配件的企業。本公司除可提供奧迪紅旗帕薩特桑塔納等車型的前輪控制臂擺臂拉桿總成拉桿球頭后橋短軸等產品外,還可依照用戶的要求,及時開拓,提供所需的各種配件。
  7. Wedge hob drill head is applicable for medium harden rock layer, coarse grain granite, and it has below 9 - grade drillability. the compressive strength is no more than 10 of pull coefficient

    楔齒滾刀鉆頭適合於中硬巖層,粗晶花崗巖,可鉆性9級以下,抗壓強度在普氏系數10 。
  8. Methods of test for pallet joints - part 2 : determination of withdrawal and head pull - through resistance of pallet nails and staples

    托盤接頭的試驗方法.第2部分:托盤釘子和u形釘抗拔出和釘頭拉穿的測定
  9. Comb drill head is applicable for clay and cemented glutinite with 6 - grade drillability. the compressive strength is no more than 4 of pull coefficient

    梳齒鉆頭適合於粘土、膠結的砂礫巖層等,可鉆性6級以下。抗壓強度在普氏系數4 。
  10. Closed and blind rivets with break pull mandrel and countersunk head - aia st

    封閉型沉頭抽芯盲鉚釘
  11. Open end blind rivets with break pull mandrel and protruding head - st st

    凸頭抽心敞口端盲鉚釘. st st
  12. Open end blind rivets with break pull mandrel and protruding head - a2 a2

    凸頭抽心敞口端盲鉚釘. a2 a2
  13. Open end blind rivets with break pull mandrel and countersunk head - a2 a2

    沉頭抽心敞口端盲鉚釘. a2 a2
  14. Open end blind rivets with break pull mandrel and countersunk head - st st

    沉頭抽心敞口端盲鉚釘. st st
  15. Open end blind rivets with break pull mandrel and protruding head - aia st

    凸頭抽心敞口端盲鉚釘. aia st
  16. Top drive head pull force and push force

    動力頭最大起拔力加壓力:
  17. Based on structure calculation of the pool wall, the top - cover of thin brick shell, pull beam and base plate of underground round - arch single - well - head thin brick shell, the paper proves that such a structure can bear load well and safely

    摘要通過對地下圓拱式單井口磚薄殼的池壁、磚薄殼頂蓋及拉梁和底板進行受力分析和結構計算,闡明了該種結構是一種受力合理、安全可靠的結構。
  18. Closed end blind rivets with break pull mandrel and countersunk head - ala st iso 15974 : 2000 ; german version en iso 15974 : 2000

    帶斷點牽引心軸和埋頭的封口式空心單面壓裝鉚釘. ala
  19. Methods of test for pallet joints - determination of withdrawal and head pull - through resistance of pallet nails and staples

    托盤連接件的檢驗方法.托盤用釘子合u型釘抗拉試驗
  20. Methods of test for pallet joints - part 2 : determination of withdrawal and head pull - through resistance of pallet nails and staples iso 12777 - 2 : 2000 ; german version en iso 12777 - 2 : 2000

    托盤連接件的試驗方法.第2部分:托盤用釘子和u形釘釘
分享友人