heating boiler 中文意思是什麼

heating boiler 解釋
採暖鍋爐
  • heating : adj. 1. 加熱的;供熱的。2. 刺激的。n. 1. 加熱;供暖;(建築物的)暖氣裝置。2. 白熾,灼熱。
  • boiler : n. 1. 煮器(壺、鍋等);熬煮東西的人。2. 汽鍋,鍋爐;〈美俚〉酒類干餾器。3. 〈俚語〉導彈。
  1. Weiss kessel anlagen maschinenbau gmbh is well - known not only in dillenburg with silos of steel, vertical - tube radiant boilers and boiler plants as well as with long - distance heating plants, dust extracting installations and combustion chamber boiler, but also with further offers, like thermal oil, heat plants and / or mechanical boiler furnaces, air and dust extraction technology and steam boilers and steam generators

    Weiss kessel anlagen maschinenbau gmbh是一家生產不同尺寸燃燒室,除塵裝置,遠程供熱裝置,鍋爐設備,熱油,鋼板結構青貯塔,立管鍋爐,熱設備,蒸氣鍋爐和蒸氣機,機械燃燒鍋爐,空氣-除塵技術的企業。
  2. Process characteristics of cwm combustion in heating boiler and prediction of its energy - saving model

    有限半氣化層燃鍋爐的綜合特性及節能預測
  3. Heating boilers. part 3 : gas - fired central heating boilers. assembly comprising a boiler and a forced draught burner

    供暖鍋爐.第3部分:燃燒氣體的集中供暖鍋爐.鍋爐和強制送風燃燒器組合設備
  4. This thesis establishes the main factor of heating surface slagging of no. 1 boiler, that it is due to irrational layout of furnace heating surface, improper angle of burner which lead to flames attaching to furnace walls. such deduction is built on the basis of necessity of analyzing the heating surface slagging, the type of coal, the design of the furnace and burner, the operational condition and other factors effecting slagging of boiler. the research is mingled with practical operations of no. 1 boiler in inner mongolia fengtai electric power generation co, ltd

    本論文從分析燃煤鍋爐結渣問題必要性出發,從煤種、爐膛及燃燒器設計、運行工況等因素對鍋爐結渣的影響著手,結合內蒙古豐泰發電有限公司~ # 1鍋爐實際運行中存在的問題,確定了~ # 1爐受熱而結渣的主要原因是爐膛受熱面布置不合理,燃燒器角度不合適導致火焰貼壁所致。
  5. Water supply for high rise building, fire profection, heating, chilledwater in rhe air conditioning system, town main, residential complex, industrial application, and iow pressure circulator of the boiler system

    高層建築生活、消防、採暖、空調系統給水,城鎮、城市住宅小區公共供水,也可用於工礦企業給排水以及低壓鍋爐循環給水。
  6. Rent : usd7500 / month or rmb 62000 / month. include tax, management fee, maintenance fee for elevator, air conditioner, heating floor system, hot water boiler, water softener system

    月租:美金8000元。包稅金,管理費,電梯維修保養費,空調保養費,地暖保養費,鍋爐及軟水系統保養費。
  7. Asme boiler pressure vessel code - section 4 : rules for construction of heating boilers

    Asme鍋爐和壓力容器規程.第4節:加熱鍋爐的建造規則
  8. Heating systems maintenance, steam boiler pumps maintenance, heating pumps maintenance, water treatment systems maintenance, etc

    供熱系統維修、蒸氣鍋爐泵維修、加熱泵維修、供水處理器維修等
  9. Analysis of the energy consumption for operating the central heating boiler house

    集中供熱鍋爐房運行能耗的分析
  10. Central heating boiler

    集中供熱鍋爐
  11. Central heating boiler ; determination of the standard efficiency and the standard emissivity

    集中供熱鍋爐.標準利用率和標準發散率的測定
  12. Abstract : this essay introduced a coal burning boiler replacement project for a nursing house in beijing, using gd - series high temperature heat pump to gather heat from 15 underground water and output 70 high termperture water to heating system. this project have characteristics of energy saving and environmental friend

    摘要:介紹了北京某干休所燃煤鍋爐改造項目,採用大溫差高溫水源熱泵從15淺層地下水中提取熱量,輸出70高溫熱水進行供暖,從而達到「節能、環保」和節約運行費用的目的。
  13. High temperature water - source heat pump can reclaim loss - grade heat that is produced when energy - changed device such as boiler is operating, anti the return water of district heating supply system is heated

    摘要利用高溫水源熱泵設備可回收鍋爐等能量轉化設備產生大量的低溫餘熱,提高其溫度用於直接供熱。
  14. The general situation of natural gas source in china and the economy of wall - mounted gas boiler for individual heating are analyzed, and the current situation analysis and forecast on heating load of gas heating are made

    摘要分析了我國天然氣的氣源概況和燃氣壁掛爐分戶採暖的經濟性,進行了燃氣採暖熱負荷的現狀分析和預測。
  15. Terratec decided in favor of a gas heating system condensing boiler technology which represents the state of the art, especially with regard to the reduction of emissions

    Terratec決定採用天然氣熱系統濃縮鍋爐技術,這種環保技術有助於減少污染散射。
  16. Retrofit of waste - heating boiler in refinery catalystic installation

    煉油廠催化余熱鍋爐改造
  17. The way to raise the capacity of heating boiler is discussed, and the method for solving the hydraulic imbalance between outdoor heat - supply system and indoor heating system is analyzed

    摘要探討了提高供熱鍋爐產熱能力的途徑,分析了解決室外供熱系統及室內供暖系統水力失調的方法。
  18. Feasible research on the dust - removing device of the heating boiler

    採暖鍋爐除煙塵器的可行性研究
  19. Experimental study on stain and stress of big - hole sealing head in fire - tube heating boiler

    火筒加熱爐大開孔封頭應力應變試驗研究
  20. Present the experimental research carried out on strain and stress by applying the resistance strain surveying technique to the big hole sealed heads in the new fire - tube heating boilers with the laws of strain and stress distribution obtained and allowable working pressure given because there is no applicable standards or specification for calculating the strength of crude oil heating boiler heads perforated by densely distributed big - holes, which, to a certain extent, hampered the further development of crude oil heating boilers in china, and concludes from experimental results that strain and the stress of circumference are fairly large near the edge of big - hole, and the cross ribs enhance strength of sealed head to a certain degree

    油田火筒加熱爐密集大開孔封頭的設計計算,因沒有相應的強度計算標準在一定程度上限制了我國油田火筒加熱爐技術的發展.採用電阻應變測量技術,對新型火筒加熱爐大開孔封頭進行了應力應變試驗研究,得到了封頭的應變和應力分佈規律,給出了大開孔封頭允許的工作壓力.試驗結果表明,大孔邊緣圓周處應力應變較大,十字筋板對封頭有一定加強作用
分享友人