high level reservoir 中文意思是什麼

high level reservoir 解釋
高地水庫
  • high : adj 1 高的〈指物,形容人的身高用 tall〉;高處的;高地的。2 高級的,高等的,高位的,重要的。3 高尚...
  • level : n 1 水平儀,水準儀;水準測量。2 水平線,水平面;水平狀態;平面,平地。3 水平,水準;水位;標準;...
  • reservoir : n. 1. 貯藏所;貯氣筒;貯水池,水庫;貯水槽,水槽;貯存器;貯油器,油筒,油箱;貯墨管;【解剖學】貯液囊。2. (知識、精力等的)貯藏,蓄積。vt. 貯藏;在…設貯藏所[貯水槽]。
  1. The wushan bank of three gorges reservoir has been divided into floodplain section, changing section from high level to below level and above flood level section

    針對水庫庫岸再造預測的特點,將三峽庫區巫山縣段的巖質庫岸劃分為漫灘段、枯洪水位變幅帶、常見洪水位以上段3種類型。
  2. So it was enlightened that t. jackii still had a high level of genetic diversity. the similar index between the t. jackii populations from jiangshi nature reserve and xufan reservoir was higher than that between the populations from jiangshi nature reserve and xufanggeng. it was determined by geographical factors

    聚類分析表明將石自然保護區的長葉榧居群與許坊水庫的相似系數較大,而和許坊埂的相似系數較小,這和地理上將石自然保護區和許坊水庫鄰近,而許坊埂距前兩者較遠的事實相符。
  3. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  4. The paper has made a comprehensive study to marine carbonate oolitic reservoir in triassic of feixianguan group of intra - platform taphrogenic trough basin in north - east past of sichuan basin. according to the principle of high resolution stratigraphic sequence, combined with original results gained form the area, the author have built up the base level cycles and fades model of different stages based on the surface identification mark of base level cycle using the information of geology, seismic, logging, core and outcrops

    1 、依據層序地層學高解析度基準面旋迴原理與識別技術,建立了裂陷槽向上變淺直至露出水面過程中形成的基準面旋迴變化的7種特徵性識別標志,包括泥巖表面乾裂、淡水選擇性溶蝕、白雲化現象、白雲巖、石膏、伽瑪曲線高值、向上變厚、變粗序列、向上變細、變泥、變紅序列、向上值變低序列等。
分享友人