high water rock 中文意思是什麼

high water rock 解釋
高潮礁
  • high : adj 1 高的〈指物,形容人的身高用 tall〉;高處的;高地的。2 高級的,高等的,高位的,重要的。3 高尚...
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  1. ( 7 ) rainfalls can " deposit " the co2 in air, making it to take part in the process of karst, to dissolve and corrade carbonate rock. co2 concentration in soil become lower after heavy rainfall and become higher after general rainfall. ( 8 ) the value of chemical characteristic of soil water in the high elevation area is lower than that in the low elevation area

    ( 7 )降雨可以對coz產生影響, 「沉澱」大氣中的co : ,使其參與到巖溶作用中,溶蝕碳酸鹽巖;降雨對土壤空氣中coz的影響與雨強、雨量有關,降雨量、雨強較大時,土壤空氣中的c02產生受到抑制,降雨量和雨強較小時,土壤空氣中的coz濃度升高。
  2. In the northern tract of the scablands, the water cut backward into the rock and caived the grand coulee, a gorge twice as high as niagara ' s and several times wider

    在疤地的北部,洪水回切人巖石,削刻出大峽谷,有尼亞加拉的兩倍高,好幾倍寬。
  3. The results show that : 1 ) though the water environment of nanyisan is more muddy than others, algal can still grow ; 2 ) the composition and rock type of the algal limestone are complex, the main rock types include lettuce - like stromatolites, algal reef, digitate stromatolies, wave - like stromatolites and so on ; 3 ) the deposits of algal limestones were formed in low - energy peritidal to subtidal high - energy environment of lakeshore slopes, sliding under the action of gravity and some other factors and become slump mixosedimentite layers ; 4 ) the physical property of algal limestones layers is better than others ; 5 ) the genetic development of the sediment decides that the single deposit is small, distributive and thin - layed

    結果表明,南翼山藻灰巖沉積水體環境相對渾濁,但藻類仍能生長;該區藻灰巖巖石組成及類型復雜,主要的藻灰巖巖石類型有包心菜狀疊層石、藻礁、指狀疊層石、水平波狀疊層石等;其主要為濱岸斜坡上低能潮上環境至高能潮下環境形成的沉積體,在重力等因素的作用下產生滑動或滑塌形成的微生物成因的滑塌混積巖;巖層物性好於其它巖層;藻灰巖層的成因決定了該地區單個沉積體規模小、分散、層薄。
  4. The primary representations of the vulnerabilities of water resource in hengyang basin where is a typical hilly region with red and purple soils in south china are analyzed : the precipitation re source varies greatly in spatial and temporal distribution ; the soils and rock property are not in favor of water and soil conserving ; the structure of crops needs a high water consumption ; and the farm irrigation works are timeworn and frangible

    摘要以中國南方典型的紅壤和紫色土丘陵區衡陽盆地為例,分析論述了衡陽盆地地表水資源脆弱性主要表現在:降水資源時空分佈不均勻;不利於水土保持的地表物質組成和植被覆蓋;耗水量大的農業種植結構以及調蓄水功能弱的農田水利工程體系等方面。
  5. Because ice is restricted to high altitudes and to polar regions, running water moves far more rock debris each year than ice does.

    由於冰只局限在高地和極區,所以每年流水搬運的巖屑比冰所運走的多得多。
  6. ( 8 ) as for the runnel which is located at a karst zone with a high water level, external water load is the main one, and rock pressure is secondary

    門)在巖溶富水區隧道地下水水頭較大時,外水荷載是襯砌結構的主要荷載,圍巖壓力相對來說是次要荷載。
  7. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質分析、類比分析、監控量測、數值模擬、神經網路等方法,對鷓鴣山隧道潛在的主要地質災害(塌方、涌水、巖爆和大變形)進行了預測預報( 3 )在現場地應力測試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿隧道軸線剖面的地應力分佈規律:地應力量級在最大埋深附近達到最大值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣山隧道的高地應力段。 ( 4 )塌方往往與斷層破碎帶及千枚巖相聯系。
  8. Among of them, carbonate rock is the primary type of them, it is the product of stable platform facies of marine. we study the geochemical characteristic of carbonate rock of lower palaeozoic burial hills in the regions of zhuangxi and chengdao and find that the calcite fillings in cave or vein have high value of 87sr / 86sr, low value of 13c and 18o and high mn content among of different structural components. so it has been exposed to be dissolved by meteoric water on supcrgene diagenetic stage

    通過對樁西、埕島地區下古生界碳酸鹽巖的地球化學特徵研究,表明在巖石的各種結構組分中,洞或脈中的方解石充填物具有顯著較高的~ ( 87 ) sr ~ ( 86 ) sr比值,較低的~ ( 13 ) c 、 ~ ( 18 ) o和較高的mn含量,其所經歷的重要巖溶作用是大氣淡水成巖作用,發生的時間為表生成巖階段。
  9. This paper analyses the stress and deformation of the two lining structure types of the surge shaft surrounded with crush rock under the action of high water pressure by using fem, compares the two lining types ' s merits and demerits in stress, deformation, fracture state, the combining bearing of surrounding rock and lining structure, the safety and economics

    本文針對圍巖條件比較破碎,裂隙發育的調壓井洞室結構,就兩種襯砌結構型式分別進行了高水頭作用下的有限元數值模擬,從調壓井襯砌結構選型角度分析對比了兩種襯砌結構型式在圍巖及襯砌結構應力與變形、襯砌結構鋼筋混凝土開裂、圍巖與襯砌結構聯合承載、結構安全儲備、經濟等方面的優劣。
  10. Comparison of results of conventional and high pressure water - pressure tests on the dam foundation rock masses of xiluodu hydroelectric station

    溪洛渡水電站壩基巖體鉆孔常規壓水與高壓壓水試驗成果比較
  11. Experiments on breaking rock with high - pressure cavitating water jets

    高壓空化水射流破碎巖石的試驗分析
  12. The lining of a tunnel in the area with high groundwater table does not bear high external water pressure in - normal, the surrounding rock reinforced by intrusion concrete does it. in the case, the groundwater through reinforced rock accumulated in the space between lining and rock must be drained in time

    一般鐵路隧道通過高水位富水區時,不用襯砌直接承受較高的外水壓力,要實現這個設計目標必須做好襯背的排水工作,使通過加固圈滲透過來的水量及時排走,及時削減累積的水量。
  13. Prospecting for and studying cavities in the rock - mass below the water tower for qujing power - house by seismic wave with high frequency

    曲靖電廠冷卻塔樁位下淺層基巖內洞穴的震波勘探研究
  14. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  15. Abstract : the causes for low efficiency of the heater in no. 2 crude unit of jpc refinery are described and analyzed including water leaking of steam soot blower, dew point corrosion caused by steam, soot deposits in convection chamber owning to poor soot blowing, high flue gas temperature, no heat recovery of flue gas, and poor performance of insulation lining, etc. by using sonic soot removing system, flue gas recovery system, spray coating of fiber and rock wool, as well as adjustment of flow scheme accordingly in the technical revamping. the dew point corrosion is completely eliminated, the insulation performance is improved, the heat loss is reduced by 1. 25 %, the flue gas temperature is reduced to about 170, and the heater efficiency is increased from 83 % to more than 90 %

    文摘:分析了金陵石油化工公司煉油廠二套常減壓裝置加熱爐存在的因蒸汽吹灰器漏水,蒸汽引起露點腐蝕及吹灰效果差造成對流室積灰,排煙溫度高,煙氣熱量未回收利用以及爐子保溫襯里效果差等問題,提出採用聲波除灰系統、煙氣回收系統、纖維噴塗和巖棉噴塗及相應的流程調整等改造措施.測定結果表明,本次技術改造解決了因蒸汽吹灰器漏水所造成的露點腐蝕問題,提高了保溫效果,減少散熱損失1 . 25 % ,排煙溫度降至170左右,裝置的爐效率由83 %左右提高到90 %以上
  16. The causes for low efficiency of the heater in no. 2 crude unit of jpc refinery are described and analyzed including water leaking of steam soot blower, dew point corrosion caused by steam, soot deposits in convection chamber owning to poor soot blowing, high flue gas temperature, no heat recovery of flue gas, and poor performance of insulation lining, etc. by using sonic soot removing system, flue gas recovery system, spray coating of fiber and rock wool, as well as adjustment of flow scheme accordingly in the technical revamping. the dew point corrosion is completely eliminated, the insulation performance is improved, the heat loss is reduced by 1. 25 %, the flue gas temperature is reduced to about 170, and the heater efficiency is increased from 83 % to more than 90 %

    分析了金陵石油化工公司煉油廠二套常減壓裝置加熱爐存在的因蒸汽吹灰器漏水,蒸汽引起露點腐蝕及吹灰效果差造成對流室積灰,排煙溫度高,煙氣熱量未回收利用以及爐子保溫襯里效果差等問題,提出採用聲波除灰系統、煙氣回收系統、纖維噴塗和巖棉噴塗及相應的流程調整等改造措施.測定結果表明,本次技術改造解決了因蒸汽吹灰器漏水所造成的露點腐蝕問題,提高了保溫效果,減少散熱損失1 . 25 % ,排煙溫度降至170左右,裝置的爐效率由83 %左右提高到90 %以上
  17. In hard strata with high matrix resistivities, it was considered that the difference between fort - nation resistivity and tight surrounding rock resistivity was caused by fractures except these factors as shaliness, pores, high salinity formation water and the other minerals

    在基巖電阻率較高的硬地層中,在去除了泥質、孔隙、高礦化度地層水和其他礦物等影響因素后,地層電阻率與緻密圍巖電阻率的差異就被認為是裂縫因素引起的。
  18. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  19. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  20. Rock resistivity testing for water - flooded reservoir during high water - cut period and its application in weicheng oilfield

    衛城油田高含水期水淹層巖電試驗與應用
分享友人