high-pressure section 中文意思是什麼

high-pressure section 解釋
高壓部分
  • high : adj 1 高的〈指物,形容人的身高用 tall〉;高處的;高地的。2 高級的,高等的,高位的,重要的。3 高尚...
  • pressure : n 1 壓;按;擠;榨。2 【物理學】壓力,壓強;大氣壓力;電壓。3 精神壓力,政治[經濟、輿論等]壓力。4...
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. Application of elastic variable - section pressure - equalizing groove in the structural design of high - stiffness aerostatic thrust bearing

    用可變截面均壓槽實現高剛度空氣靜壓軸承的結構設計
  2. Fluid noise mainly comes from out put pulsation of rate of flow, the main reason of out put pulsation of rate of flow is the instant high pressure return flow that obturation cubage produced when the big round curve pressure transition. the v trough on the port plate can reduce the fluid noise. in this paper, the author based on the acting of dam a river and condensability of liquid and used matlab language as tool to calculate the v trough on the original port plate and drew out the p - t diagrammatic curve and analyzed its shortcoming and improved the design of original v trough and got that the best size of its angle was 12. 3 and its length was 5mm and the cross section was an equilateral triangle

    流體噪聲主要來源於輸出流量脈動,造成輸出流量脈動的主要原因是閉死容積在大圓弧段壓力切換時產生的瞬時高壓迴流,在配流盤上開設v型尖槽可降低因高壓迴流而引起的流體噪聲,本文以截流作用和液體的可壓縮性為理論依據,以matlab語言為工具,對原配流盤上的v型尖槽進行了理論計算,繪制出p - t圖線,分析了它的不足,並對原有v型尖槽進行了優化設計,得出了v型尖槽的最佳幾何尺寸:配流盤平面上的v型尖槽的兩邊的夾角為12 . 3 ,槽長5mm ,槽的橫截面為等邊三角形。
  3. The construction methods and caving protection measures for punching high thick and loosen soft coal seam in luling coal mine no. 2 dark tilt well in huaibei coal mine area are introducded. they include small section enlarged after the heading caving, high negative pressure and multi - raw drilling holes and strenous drawing - off, concentrated cross drill holes, cutting while drawing - off and putting the metal frame away

    介紹了淮北礦區蘆嶺煤礦2主暗斜井採用小斷面導硐后刷大、高負壓多排鉆強抽,密集交叉鉆孔邊掘邊抽及設置金屬骨架施工方法和防突措施揭穿高突特厚松軟煤層。
  4. Culvert under high - stack soil is a ubiquitous phenomena in road constructions in mountain, self - compression of high - stack soil can not be ignored, soil pressure at the top of culvert is affected by many factors, including the height of high - stack soil, section size of culvert, width of the bottom of valley, grade of valley, property of filled soil, construction procedure and techniques

    高路堤下埋設涵洞是山區公路建設的一種較為普遍的現象,高路堤自身壓縮較大,不可忽視,涵洞頂部土壓力的大小又受很多因素的影響,包括填土高度,涵洞截面尺寸,溝谷底部寬度,溝壁坡角,填築體性狀,施工工序與工藝等。
  5. Copper tubes of circular section for high pressure oxygen systems

    高壓氧系統用圓截面銅管
  6. The result shows that argon gas can not only promote the excitation of plasma at low pressure, but also improve discharge state, increase the density and activation of reaction radical and improve the quality of diamond films. on the other side, argon can cool the plasma and maintain low temperature of substrate due to its big ionization section and high collision probability with gas molecules

    結果表明,氣體系統中引入氬氣一方面不僅有利於維持低壓放電,而且改善放電狀態,提高反應活性基濃度和活性,提高低溫沉積金剛石膜的質量;另一方面,由於其大的電離截面使其和電子碰撞的幾率大大提高,對等離子體進行冷卻,有利於基片溫度的降低。
  7. In this way, when obturation cubage leave absorb oil cavity it connects the eduction oil cavity with the v trough and with the increasing of the turning angle, the size of the cross section of v trough become bigger and bigger, which make the pressure between the cavity of two blades much higher and higher, and until it completely connects the eduction oil cavity, it reaches the pressure of the eduction, and it can effectively reduces the fluid noise caused by high pressure return flow

    這樣,當密閉容積離開吸油窗口之後,通過v型尖槽逐漸與排油窗口連通,隨著轉角的增加, v型尖槽通流截面積逐漸增大,這就使兩葉片間容腔內的壓力逐漸升高,直至完全接通排油窗口時,才升壓達到壓油腔的壓力,這樣可以有效地降低因高壓迴流而引起的流體噪聲。
  8. Guide for the procurement of power station equipment - pipework and valves - boiler and high pressure valves - section 2 : boiler and high pressure valves

    發電站設備采購指南.管道系統和閥門.鍋爐和高壓閥門.第2節:鍋爐和高壓閥門
  9. Guide for procurement of power station plant, equipement and systems - part 7 : pipework and valves - section 1 : high pressure piping systems

    電站設備和系統的征購指南.第7部分:管道和閥門.第1節:高壓管道系統
  10. Guide for the procurement of power station equipment - pipework and valves - high pressure piping systems - section 1 : high pressure piping systems

    發電站設備采購指南.管道系統和閥門.高壓管道系統.第1節:高壓管道系統
  11. Guide for procurement of power station plant, equipment and systems - part 7 : pipework and valves - section 2 : boiler and high pressure piping valves

    電站設備和系統的采購指南.第7部分:管道和閥門.第2節:鍋爐和高壓管道閥門
  12. Common test methods for insulating and sheathing materials of electric cables. part 3 : methods specific to pvc compounds. section one : pressure test at high temperature - test for resistance to cracking

    電纜絕緣和護套材料通用試驗方法第3部分:聚氯乙烯混合料專用試驗方法第1節:高溫壓力試驗-抗開裂試驗
  13. The feeder has a small cross - section, compact structure, and the advantage of high transmission efficiency, but also under some pressure in transmission materials, and no jet

    該喂料器具有橫截面小、結構緊湊且輸送效率高的優點,並能在一定壓力下進行輸送,物料不反噴。
  14. Asme boiler pressure vessel code - section 8 : rules for construction of pressure vessels ; division 3 ; alternative rules for construction of high pressure vessels

    Asme鍋爐和壓力容器規程.第8節:壓力容器的製造規則.第3分冊.高壓容器製造的替代規則
  15. Rapid cooling section is at the end of the firing section, cool the tiles by means blow environment air with high pressure fan into the tunnel directly through tiny holes in series of stainless steel pipes inside the tunnel

    急冷設于燒成帶未端,由高壓離心鼓風機,經環境空氣通過總管、支管、手動球閥,直接將窯外冷空氣經不銹鋼管通過細孔高速打入窯內冷卻製品。
  16. Numerical simulation of internal high pressure forming of the right - angle bent - tube with rectangular section

    矩形截面直角彎管內高壓成形過程的數值模擬
  17. The public building that repair to cause from the adornment the indoor environment pollute to have already caused the people ' s extensive concern, from here and the result that result in, decorate for building to repair the industry to receive up one layer shadow, also result in tremendous thought pressure for large consumer, also cause high value of the national and related section

    摘要由裝飾裝修引起的民用建築室內環境污染已引起人們的廣泛關注,由此而造成的後果,給建築裝飾裝修業蒙上了一層陰影,也給廣大消費者造成了極大的思想壓力,同時也引起了國家及相關部門的高度重視。
  18. Asme boiler pressure vessel code - section 3 : rules for construction of nuclear facility components ; division 3 ; containment systems and transport packaging for spent nuclear fuel and high level radioactive waste

    Asme鍋爐和壓力容器規程.第3節:核設施元部件製造規則.第3分冊.消耗核燃料和高級放射性廢物用盛裝系統和運輸包裝
  19. Asme boiler pressure vessel code - section 3 : rules for construction of nuclear facility components ; division 3 ; containment systems and transport packaging for spent nuclear fuel and high level radioactive waste ; 2005 addenda july 1, 2005

    Asme鍋爐和壓力容器規范.第3部分:核設備元件結構原理. 3類.失效核燃料和高等級放射性廢物的密封系統和運輸包裝.補充件2005
  20. Insulating and sheathing materials of electric cables. common test methods. part 3 : methods specific to pvc compounds. section 1 : pressure test at high temperature. tests for resistance to cracking

    電纜絕緣和護套材料.通用試驗方法.第3部分:聚氯乙烯化合物專用方法.第1節:高溫下的壓力試驗.耐斷裂性試驗
分享友人