horizontal bank 中文意思是什麼

horizontal bank 解釋
水平轉彎
  • horizontal : adj 1 地平的,地平線的。2 水平的 (opp vertical perpendicular); 臥式的。3 同一行業的;相同地位的...
  • bank : n 1 堤,堤防;岸,河畔。2 埂,壟,堆。3 (海中水下的)沙洲,灘。4 斜坡,邊坡,坡度;轉彎。 【航空...
  1. This article tinselly explains the connotation of commercial bank " s system, describes marxian and the new system economics, puts forwards the definition essential function and target of the commercial bank " s system on the theory of the system and its vicissitude ; secondly, summarizes of historic analysis puts forwards the features of both system and theory for the three period in the historic vicissitude, and the instructive node of vicesitudesystem of the theory of it synthetic bank system " s vicissitude with the force of market and nation ; thirdly, illustrates the identity and difference of the commercial bank " s system through the horizontal analysis for its system ; finally, according to china " s reality, analyses the processes of the chinese commercial bank " s system, the synthetic tendency of the vicissitude of realistic bank " s system and the reason for synthesis, puts forwards it synthetic mode of the chinese commercial bank ' s system and the specific request and content of the creation of commercial bank " s system, providing the reference for the reform of the chinese commercial bank " s system

    其次,用歷史的分析方法對商業銀行制度進行了總結,論述了商業銀行制度歷史變遷中三個階段的制度特徵及理論特徵,提出了由市場力量和國家力量共同主導下的綜合銀行制度變遷的理論特徵及引導性制度變遷模式。再次對商業銀行制度做了橫向的比較分析,論述了商業銀行制度的趨同性和差異性。最後根據中國的實際情況,分析了中國商業銀行制度的歷史變遷過程和現實銀行制度變遷的綜合化趨向及動因,提出了中國商業銀行制度綜合化的模式及商業銀行制度的具體要求和內容,為中國的商業銀行制度改革提供參考。
  2. On one side of the road rose a high, rough bank, where hazels and stunted oaks, with their roots half exposed, held uncertain tenure : the soil was too loose for the latter ; and strong winds had blown some nearly horizontal

    路的一旁是一條不平坦的高坡,榛樹和短小的橡樹半露著根,不穩地豎在那裡這土質對于橡樹來說是太鬆了,而強烈的風把有些樹都吹得幾乎要和地面平行了。
  3. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體力學環境分析及右岸古滑坡體的穩定問題分析得出:建壩后河谷的巖體應力量值明顯增高,同時左岸的張應力區的范圍及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大壩建成后逐漸蓄水階段以及同時考慮本區最強地震力的作用等各種不同的工況條件時,滑坡體及壩體總體上仍處于穩定狀態;水位驟降時,在未考慮其他外力作用的情況時,滑體的安全系數將顯著降低。若考慮水位驟降及本區最大地震力的共同作用,壩體將在滑坡體下滑推力的作用下產生破壞;建壩后水平推力對右岸古滑坡體穩定性的影響分析可以看出,在最危險的工況條件下,壩體及滑坡體也將處于臨界狀態;在長期滲透變形的作用下,由於滑帶的物理力學參數的降低而有可能導致壩體失穩破壞。
  4. ( 4 ) on the basis of analysed result and the status quo of huxi bank, computing the slope safety and seepage of bank by fem. the result shows that the tarus quo of huxi bank could not satisfy theslope safety on designed flood lever. after the reinforcement of seepage, the method can not only reduced leakage, debace the soggy but also ameliorate stress fields. lt also can reduce horizontal displacement and certical displacemeng which have disadvantages to bank

    進行堤體防滲加固后,不但可以減少滲漏,降低堤身浸潤線,還可以有限度地提高抗滑穩定安全系數,改善堤身及地基的應力場,使在高水位作用下產生的不利於堤體安全的水平位移和豎向位移減小。對在後繼采動中可能造成的防滲材料的破壞進行了校核,結果表明材料是安全的。
  5. Finally, author analyzed and compar ed these two schemes on the aspects of technology and economy according to the wholly structure optimizing process and outcome, and recommended the final scheme of the right bank ' s diversion tunnel of gongboxia power station reconstructed into a horizontal swirling flow internal dissipater tunnel

    最後根據整個體型優化過程與結果,從技術與經濟對比分析兩個方面,對公伯峽右岸旋流泄洪洞進行了選型研究與方案比較,提出了公伯峽水電站右岸旋流內消能泄洪洞的最終推薦方案。
  6. There was interesting one that " came straight to the point ", nearby " association of jiangxi " of ancient building with a history of more than 200 years, horizontal street of the west nearby is connected to west street, form, have " t - shaped road junction " and light square, bank, internet cafe, market, restaurant, bookstore, gallery of characteristic, etc. spread all over it most, prove to be the good place for travelling, lying fallow, shopping

    並有」開門見山「之趣,附近有200多年歷史的古建築」江西會館」 ,旁邊的西橫街與西街相接,形成最具有特色的」丁字街」和小廣場銀行網吧商場餐廳書店畫廊等遍布其中,不愧是旅遊休閑購物的好地方。
  7. Firstly in the paper the research of hydraulic characters and the optimize of structure have being carried out on the four bigger design schemes of permanent internal dissipation discharge tunnel reconstructed from the right bank ' s diversion tunnel of gongboxia power station with a method of theoretical analysis combined with test comparisons. on this basis, two form swirling flow internal dissipation schemes, vertical and horizontal axis are recommended to the construction unit of the station as the schemes to be selected next

    本文採取理論分析與試驗比較相結合的方法,首先對黃河公伯峽水電站右岸導流洞改建為永久式內消能泄洪洞的四個較大設計方案進行了水力特性的試驗研究與體型優化,在此基礎上,向建設單位分別提供了豎井旋流內消能的推薦方案與水平旋流內消能的推薦方案。
分享友人