hybrid rock 中文意思是什麼

hybrid rock 解釋
混染巖
  • hybrid : n 1 【生物學】雜種,雜交種;混血兒。2 (由兩種來源的東西組成的)混合物;受過兩種不同文化傳統教育...
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  1. Leg warmers are pass, but hybrid legging - leg warmers from chanel totally rock

    暖腿套早已成為過去式,然而香奈兒的保暖長襪絕對讓你惹火至極。
  2. Finally, some simplification methods to the model were studied and a modified block elimination contraposing the features of the model ' s linear system was developed, which can greatly decrease the model ' s requirement to computer resources. in the second part, numerical methodology of hybrid techniques was developed, which uses dfn models developed in the fist part to build continuum approximations of fractured rock

    第三,本文將一種用離散的水?氣分界面模擬非飽和滲流的數值模型擴展到裂隙網路中,為用本文所構建的離散裂隙網路模型模擬裂隙巖體成富擁要柳廳錄非飽和滲流提供了一個初步的框架。
  3. Abstract : incompatible element nh11 and hybrid stress element 18 were employed to analyze rock burst occurring in coal face 9108 of sanhejian coal mine. compared with the results from ansys, the two optimized fems can execute more accurate numerical simulation in the research of rock burst as well as other rock problems and lessen the errors from inaedquately meshing in huge calculations due to the limitation of labor and computer time. in addition, the criterion of averaged generalized stress rate was proposed and used to determine the site and moment of rock burst. the given conclusion is in accordance with the face of coal face 9108 very well

    文摘:利用優化非協調元和雜交元分析了三河尖礦沖擊礦壓,並與ansys程序的計算結果進行了比較.認為優化有限元在沖擊礦壓乃至巖石材料的數值模擬中能給出更為精確的結果,也可減小大型計算中由於人力、機時所限粗分網格產生的誤差.分析中,採用了廣義平均應力率準則來判斷沖擊點位置和沖擊時刻,所得結論與實際情況吻合
  4. Rock permeability coefficient inversion method based on hybrid algorithm

    基於混合優化演算法的巖體滲透系數反演方法
  5. To characteristic of dam construction period, viscoelastic finite model of dam and foundation rock mass during construction period is analysis. based on field theory, method of founding dam safety monitoring tune - spatial distribution model during construction period is discussed, including statistic time - spatial distribution model, deterministic time - spatial distribution model and hybrid time - spatial distribution model. furthermore, neural network model, which has better nonlinear mapping capability, is studied and founded

    ( 3 )針對大壩施工期的特點,研究了壩體和基巖施工期粘彈性有限元分析模型;基於場論理論,探討了建立施工期大壩安全監控時空分佈模型(統計時空分佈模型、確定性時空分佈模型和混合時空分佈模型)的方法;同時,研究並建立了具有較強非線性映射能力的神經網路模型。
分享友人