hydraulic power station 中文意思是什麼

hydraulic power station 解釋
水力發電廠
  • hydraulic : adj. 1. 水力的,液力的;用水發動的。2. 液壓的,水壓的。3. 水力學的。4. 【建築】水硬的。adv. -lically
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. Thedevelopment development hydraulic jack, the bearing heater, thebearing get up pulling out, the hydraulic pressure spanner, thehydraulic pressure pulls a horse, the hydraulic pressure small crane, nut broken cutting, the oil filter machine and the pipe bendingmachine and so on the advanced practical mechanical and electricalservice product has the world advanced level, the product and thetechnology widely applies to domain the and so on electric power, petrification, chemical industry, metallurgy, mine, spinning andweaving, papermaking machinery service department and the machinemanufacture unit, and in the daya bay nuclear power station, beijingsteel corporation, wuhan steel corporation, the baoshan steelcorporation, the daqing oil field, the victory oil field, the golmudoil field, the three gorges power plant, yangzi petrifies, qi and lupetrifies and so on in the national large and middle scale enterprisesand the project the comprehensive promoted use

    研製開發的液壓千斤頂,軸承加熱器、軸承起拔器、液壓扳手、液壓拉馬、液壓小吊車、螺母破切器,濾油機和彎管機等先進實用的機電維修產品有世界先進水平,產品和技術廣泛應用於電力、石化、化工、冶金、礦山、紡織、造紙等領域的機械維修部門和機械製造單位,並在大亞灣核電站、首鋼、武鋼、寶鋼、大慶油田、勝利油田、格爾木油田、三峽電站、揚子石化、齊魯石化等國家大中型企業和工程中全面推廣使用。
  2. According to the results of the satiable modle test and trdimensional seepage computation, the structure arrangement of the cushion bottom could be asserted. to recheck the factors of safety against overturning and float flotation of cushion bottom, the stability computation methods of bottom of the literature, xiao wan hydraulic power station and ertan hydraulic power station were refereed

    根據穩定模型試驗及三維滲流計算成果,確定水墊塘底板的結構布置,參考國內小灣、二灘及參考文獻建議的底板穩定計算方法,復核水墊塘底板的抗傾、抗浮穩定。
  3. The main contents are as follows : in order to finish this work well, the author collected the basic parameters of water cushion in china and foreign countries, and analyzed the questions and shortcoming in the designing of cushion in domestic and abroad, and summarized the design experiment of xiao wan hydraulic power station and ertan hydraulic power station in china, finally the main controlling design parameters of baishan water cushion, that is the allow dynamic impact water pressure and unit water consumed energy rate were asserted

    具體內容如下:為了做好白山水墊塘設計,本文通過收集國內外水墊塘設計的基本參數,分析水墊塘設計存在的問題及不足,總結國內小灣、二灘工程的經驗,確定白山水墊塘設計主要控制參數即允許動水沖擊壓力及水墊塘單位水體消能率。
  4. To design the water cushion of baishan arc dam, the design experiment of ertan hydraulic power station, xiao wan hydraulic power station were refereed. through large amount of scientific experiments and theoretical calculation, and the design coefficients of water cushion in domestic and abroad were summarized, then the design layout of the baishan cushion was worked out at last

    本文針對白山拱壩水墊塘方案設計,參考國內二灘、小灣等工程設計經驗,通過大量的科學試驗和理論計算,總結國內外的水墊塘設計參數,最後確定了白山水墊塘的設計方案。
  5. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  6. Since first used in the wujiangdu hydraulic power station with success, high - pressure grouting ( orifice - closed grouting method ) spreads rapidly in the carst region and lots of experience are accumulated

    高壓灌漿(即孔口封閉灌漿法)自烏江渡電站首次採用並取得成功后,在巖溶地區得到了迅速的推廣,集累了十分豐富的實踐經驗。
  7. By the development of hydraulic power project, the system of hydraulic power station is more and more complex

    =隨著水電事業的發展,水電站系統變得越來越復雜。
  8. Nuozadu hydraulic - power station will be built in lantsang river in yunnan province, has a oversize hydraulic power project, its highest height of the design dam achieve 260 meter, and its installed capacity arrive 5, 600, 000 kilowatt

    雲南省瀾滄江糯扎渡水電站,最大擬建壩高260m ,裝機容量560萬千瓦,屬特大型水電工程。
  9. However the diversion tunnel is generally discarded after used, because the construction period of hydraulic power station is pressing, the lining standard of tunnel needs being improved and the up and down steam water level is difficult to be joined

    而導流洞在完成導流任務后,又往往因為工期緊,襯砌標準需提高,上下游水位銜接等困難而被廢置不用。
  10. For getting the runner characteristics more correctly, researching the representation of runner characteristics of the kaplan turbine in this paper, and using this method of modifying runner characteristics to calculate the transient of hydraulic power station. improving the calculating model of the axial thrust in the kaplan turbine ' s transient. base on the theory of screw propeller without any boundary, using the theory of screw propeller with pipe, and the formula to calculate the dynamic axial thrust during transient is developed

    本文對轉槳機組在過渡過程中的槳葉劃水產生水推力的數學模型進行了改進,在原來使用無邊界螺旋槳進行等效的基礎上,使用了導管螺旋槳對轉槳機組中的槳葉劃水進行等效,並且比較詳細的分析了影響轉槳機組軸向水推力的各個因素,以及給出了動態計算軸向水推力的公式,通過計算表明,使用改進后的動態水推力計算模型得到的結果能較好的反應實測的動態軸向水推力。
  11. Based on this method, design the system oil circuit and constant - pressure hydraulic power station as well as the hydraulic manifold block, measuring platform, electrical cabinet and reclaiming oil tank

    在此油源方案的基礎上,設計出測量系統油路、油源泵站系統,同時進行了液壓集成塊、測量臺架、電氣控制櫃和漏油回收油箱的設計。
  12. Design and research for concrete production system at right bank of longtan hydraulic power station

    龍灘水電站右岸混凝土生產系統設計研究
  13. According to the selected project, a stability test with scale of 1 : 35 of cushion bottom had been done. with the research results of the experiments and the flow shape of xiao wan hydraulic power station were thought about, on the other hand, the ternary complex jet shape of baishan water cushion was analyzed, all this gave a base for the analysis of the force of the cushion bottom. through observation, the dynamic water pressure, the fluctuation pressure, the time - homogeneous pressure on the surface of the bottom and the characteristics of the fluctuation pressure could be got, also the calculation method and the test results were compared to get the argument

    針對選定的方案,進一步做了1 : 35比尺的水墊塘底板穩定性試驗;通過試驗及借鑒小灣水墊塘內水流流態的研究成果,分析白山水墊塘內三元復雜淹沒射流流態,為水墊塘內底板受力分析打下基礎;通過觀測得到水墊塘底板動水沖擊壓力、脈動壓力、底板上下表面的時均壓力及脈動壓力特性,並通過計算方法與試驗成果進行相互比較論證。
  14. Computer monitoring system operating analysis of longyangxia hydraulic power station

    龍羊峽水電站計算機監控系統運行分析
  15. With the gradual built of three - gorges hydraulic power station and the execution of the project " electric power transmission from west to east ", the hydroelectric resource is being developed at top speed and the hydroelectric occupy more and more specific weight. the continuous completion and commissioning of large hydraulic power station, as well as the continuous increasing of extra - high voltage and long distance power transmission system, deteriorate the stability control problem of hydro - electricity system

    隨著三峽水電站的逐步建成和「西電東送」計劃的實施,我國的水電開發進入了高速發展的時期,大型巨型水電站不斷建成投運,超高壓遠距離輸電系統不斷增長,水電在我國電力系統中所佔比重越來越大。
  16. Application of water level measuring meters in hydraulic power station

    水位測量儀表在水電站中的應用
  17. Disposal of landslide happened in the tunnel of yangxi hydraulic power station

    乳源縣楊溪水電站工程隧洞塌方處理
  18. People came in flocks to see the new hydraulic power station beside the dam

    人們成群結隊地來參觀水壩旁邊新建的水電站。
  19. Large scale diversion tunnel is often adopted when building a hydraulic power station between high mountains or in canyons on a great river

    在高山峽谷的大江大河上修建水電站,往往需要大尺度導流洞。
  20. After the engineering slope was dug, several small plastic zone the designed rock - fill dam will coming in the temporary slope, because rock - fill dam change the stress field on a small degree. but a gravity dam will arouse a great area of plastic zone in the permanent slope, which will bring a stability problem. after detail and depth study, the rock - fill dam project is more compatible of the engineering geology condition in nuozadu hydraulic - power station ' s dam site

    工程邊坡開挖后,擬定的堆石壩方案由於嵌入淺,應力的調整有限,塑性區主要分佈在壩頂高程附近的較小范圍內;而擬定的重力壩方案,由於嵌入深,引起了一定程度的應力調整,邊坡巖體表層產生了鬆弛變形,塑性區主要分佈在壩頂高程到坡頂前緣(永久邊坡)的v ivb類巖體分佈區。
分享友人