hydroelectric power project 中文意思是什麼

hydroelectric power project 解釋
水力發電工程方案
  • hydroelectric : adj. 水力發電的。 a hydroelectric power station 水力發電站。n. -tricity
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. Based on the actual condition of gezhouba hydroeletric power plant, this paper points out the basic way for unit increasing capacity rebuilding of this plant after serious analysis and site review of lots of information of unit increasing capacity of hydroelectric unit at home and abroad. for this rerebuilding plan, we have made a lot of experiment and analyzed the data, the result show that the unit increasing capacity is necessary and feasible in this plant, additional, this paper describes project management, organization struture, management method, and evaluates this project value

    本文對國內外眾多水電機組增容改造資料進行了認真研究和實地考察;通過對水力發電機組增容改造技術的研究,結合葛洲壩電站實際情況提出了葛洲壩電站機組增容改造的基本途徑;針對葛洲壩電站機組改造方案,進行了大量的試驗,認真分析了試驗數據,用試驗結果充分證明了葛洲壩電站機組增容改造的必要性和可行性;本文還就該工程項目管理的必要性、組織結構、管理方法進行了闡述,並對該項目進行了項目評估。
  2. This thesis analyses from following angles why speeding hydroelectric power exploitation is necessary for social and economic sustainable development of sichuan province : first, structure of power and resource of sichuan province requires accelerating hydroelectric power exploitation ; second, abundant water resource is advantageous for sichuan accelerating hydroelectric power exploitation ; third, comprehensive benefit results from hydroelectric power projects demands accelerating hydroelectric power exploitation ; forth, hydroelectric power exploitation stimulates development of other crafts ; fifth, construction of large scale project is beneficial for reducing resource cost of the whole society ; last, the process of hydroelectric power exploitation usually consists of much scientific and technological content

    本文從下述幾個方面分析了大力發展水電是四川社會和經濟可持續發展的必然選擇:四川的能源資源結構要求大力開發水電;四川水能資源的優勢要求大力開發水電;水電工程巨大的綜合經濟利用效益要求大力開發水電,水電工程除了發電效益外,一般還兼有防洪、灌溉、供水、航運、養殖、旅遊等社會效益,水電站的綜合利用可以為社會創造巨大的社會和經濟效益,造福一方;水電開發對經濟廣泛的拉動作用要求大力開發水電;大型水電建設有利於降低全社會資源損耗;水能資源的開發利用過程具有較高的科技含量。
  3. The jinping hydroelectric power station, located between from kala to the outlet of the yalong river, is designed as the first huge project of the river, which is rich in hydro logical energy

    錦屏一級水電站是位於我國水能資源「富礦」之一的雅礱江卡拉?江口河段的「龍頭」水庫梯級電站,具有良好的補償調節作用。
  4. Large hydroelectric equipment production project of the harbin - electromotor plant has made great contribution to china ' s hydroclectric power development. the plant is now a major manufacturer of hydroelectric equipment in china

    哈爾濱電機廠大型水電設備製造我國重要的水電設備製造基地,為水電事業發展做出了巨大貢獻。
  5. Yunfeng hydroelectric power station dam downstream face reinforcement project design construction

    雲峰水電站擋水壩下游面加固工程的設計與施工
  6. With the gradual built of three - gorges hydraulic power station and the execution of the project " electric power transmission from west to east ", the hydroelectric resource is being developed at top speed and the hydroelectric occupy more and more specific weight. the continuous completion and commissioning of large hydraulic power station, as well as the continuous increasing of extra - high voltage and long distance power transmission system, deteriorate the stability control problem of hydro - electricity system

    隨著三峽水電站的逐步建成和「西電東送」計劃的實施,我國的水電開發進入了高速發展的時期,大型巨型水電站不斷建成投運,超高壓遠距離輸電系統不斷增長,水電在我國電力系統中所佔比重越來越大。
  7. In the relently twenty years, in pace with the high development of highway and hydroelectric power station, being inevitable decompose to terrain and landforms, decomposed slope s steady and impelled into being and developing of landslip. thereby giving project security to bring the grave effect, condition the projects rate of aduance, ading the project invests, at the same time also probably creates great wealth loss and the personal safety

    近二十年來,隨著高等級公路和大型水電站事業的迅速發展,不可避免地對邊坡地形地貌產生破壞,給邊坡穩定性造成潛在威脅,有的甚至產生滑坡,從而給工程安全性帶來了嚴重影響,制約了工程進度,增加了工程投資,同時也可能造成重大的人身安全和財產損失。
  8. Simulation of ventilation and air conditioning project in xiluodu underground hydroelectric power station

    溪洛渡水電站地下廠房通風空調方案模擬分析
  9. In these years, comprehensive analysis and study on the basis of application guarantee the stabilization and safety of hydroelectric power set of xld hydropower project

    幾年來結合現場運行進行了跟蹤分析和研究,為確保小浪底機組長期安全、穩定運行發揮了重要作用。
  10. Baihetan hydroelectric power station of jinsha river is another planned giant project after three gorges and xiluodu water c onservancy p roject i n c hina

    金沙江白鶴灘水電站是我國繼三峽、溪洛渡之後開展前期工作的又一座巨型電站。最大壩高275m ,裝機容量12000mw 。
  11. As a project financed by yunfeng and ming tomb hydroelectric power station, the study on " mathematical model for dam safety monitoring and dynamic inverse model for underground power house " was conducted. according to the data observed in - situ, the under - fitting problems in regression models for dam safety monitoring were discussed, and the computational parameters and boundary conditions of underground structures were determined on the base of dynamic inverse mathematical model

    本文利用大壩運行監測資料和水電站廠房結構的振動測試數據,對水工建築物的正反分析模型中的相關問題進行了探討,分析了大壩安全監測回歸模型存在的欠擬合現象,建立了通用的結構動力最優化反分析模型,實現用戶優化演算法對復雜結構的直接調用和優化計算,在計算模型方法的基礎上對雲峰寬縫重力壩的安全狀況和十三陵抽水蓄能電站的動力反演問題進行實例分析。
分享友人