hydroplant 中文意思是什麼

hydroplant 解釋
水電廠
  1. Taking the reach with fluctuating backwater area in jiaokou hydroplant in xiujiang river, guanxi zhuang autonomous region for instance, this paper analyzes the water - sediment characteristics of the fluctuating backwater area, calculates the design level of this reach with samples of level and discharge, etc., and propounds the determination method for the designed lowest navigable level of reach with fluctuating backwater area

    以廣西繡江交口電站的變動回水區河段為例,分析了變動回水區的水沙特性,分別利用水位、流量樣本及不同方法計算與分析本河段的設計水位,提出了變動回水區河段設計最低通航水位的確定方法。
  2. Study on relation between energy output with power unit ' s capacity of three - gorge hydroplant

    三峽電站單機容量與發電量的關系研究
  3. With the development of the electric power system, static - state reactive power compensators ca n ' t have met the requirements of the actual production and operation, and the trend to the fast and dynamic compensation for reactive power become greater and greater. since ertan hydroplant and 500kv transmission systems in sichuan power system have been operated, many power plants of load center are forced to halt during the high - water period, because the great deal of power is transmitted to far - distance load center. thus the load center loses voltage sustentation and the level of the system stabilization is debased greatly

    四川電網的二灘水電站和500kv輸變電系統投入運行后,由於二灘水電站的大量電力遠距離輸送至負荷中心,迫使負荷中心的火電機組在豐水期大量停機,使負荷中心失去電壓支撐,大大降低了電網的電壓穩定水平;同時,因為四川電網中的無功補償裝置全為靜態無功補償電容器(或電抗器) ,這些設備只能在系統正常運行狀態下起到無功補償和電壓支撐的作用,而在電網出現事故時,不但不能起到電壓支撐作用,反而會促使電網電壓崩潰事故的發生。
  4. The construction techniques and mechanics are approaching or even reaching the international advanced level in the asphalt concrete impervious deck of the recent completed tianhuangping pumped - storage hydroplant and the counter dam in the yangtze river which is being built with the height of 104 m, the volume of asphalt concrete core of 5x104m3

    最近建成的天荒坪抽水蓄能電站上庫瀝青混凝土防滲面板和正在建設的壩高104m 、瀝青混凝土心墻方量達5萬多m ~ 3的長江三峽水利樞紐茅坪溪防護壩工程,施工工藝和施工機械化程度已達到或接近國際先進水平。
  5. The vibration problems in pumped storage hydroplant are outstanding, due to their high - velocity flow, high - speed units, etc. on the base of summarizing the development of inverse analysis methods, this paper proposed a dynamic inverse model for underground hydroplant was built, combining the modal analysis and inverse numerical computation

    點,提出採用實驗模態分析與動力反演分析相結合,以試驗模態與計算模態某種偏差為目標函數,建立通用的結構最優化動力反分析模型。引入改進的遺傳演算法,實現了其與ansys軟體的介面。
  6. Economic dispatching of series hydroplant system plays an important role for optimal operation of power grid. appropriate scheduling of the series hydroplants is vital to the security, stability and economic operation of the whole power system

    梯級水電站群經濟調度是電網優化運行的重要組成部分,正確、合理的安排梯級水電站群的運行方式對整個電網的安全、穩定、經濟運行至關重要。
分享友人