incremental construction 中文意思是什麼

incremental construction 解釋
建築增量
  • incremental : adj. 1. 增加的,增大的,增長的。2. 增額的。3. 【數學】增量的。
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. Creep analysis methods of high - rise buildings and large span buildings can only refer to creep coefficient method in bridge engineering or the method of degree of creep in hydraulic construction engineering under the present experiment conditions. in this paper, the incremental expressions of concrete creep and shrinkage strain when the initial computational age is not the same as the loading age are derived and corrected from the concept of concrete creep coefficient and the mean value theorem of integral and the principle of superposition. the differences of efficiency and accuracy of creep analysis between the finite element method with creep coefficient and the initial stress method with degree of creep are presented. this paper suggests that engineers should use the initial stress method with degree of creep to estimate the influences of creep on high - rise buildings and large span buildings on the basis of conceptual design

    基於現有的試驗資料,高層及大跨度民用建築的徐變分析只能參照橋梁結構中的徐變系數方法或水工結構中的徐變度方法進行.從徐變系數的定義出發,利用積分中值定理和疊加原理,推導並修正了加載齡期與起算齡期不同時徐變收縮應變增量的表達式,對比了應用徐變系數分析徐變的有限元法和應用徐變度分析徐變的初應變法在效率和精度上的差別,並建議應從概念設計的角度出發,採用徐變度的初應變法來估算徐變對高層及大跨度民用建築的影響
  2. Abstract : creep analysis methods of high - rise buildings and large span buildings can only refer to creep coefficient method in bridge engineering or the method of degree of creep in hydraulic construction engineering under the present experiment conditions. in this paper, the incremental expressions of concrete creep and shrinkage strain when the initial computational age is not the same as the loading age are derived and corrected from the concept of concrete creep coefficient and the mean value theorem of integral and the principle of superposition. the differences of efficiency and accuracy of creep analysis between the finite element method with creep coefficient and the initial stress method with degree of creep are presented. this paper suggests that engineers should use the initial stress method with degree of creep to estimate the influences of creep on high - rise buildings and large span buildings on the basis of conceptual design

    文摘:基於現有的試驗資料,高層及大跨度民用建築的徐變分析只能參照橋梁結構中的徐變系數方法或水工結構中的徐變度方法進行.從徐變系數的定義出發,利用積分中值定理和疊加原理,推導並修正了加載齡期與起算齡期不同時徐變收縮應變增量的表達式,對比了應用徐變系數分析徐變的有限元法和應用徐變度分析徐變的初應變法在效率和精度上的差別,並建議應從概念設計的角度出發,採用徐變度的初應變法來估算徐變對高層及大跨度民用建築的影響
  3. When the csp approach is applied to scheduling problems, the problem - solving process requires two kinds of decisions for incremental schedule construction

    當用csp方法解決排序問題時,需要兩個決策策略:一個是參數排序策略,另一個是值排序策略。
  4. Method of incremental construction of heterogeneous neural network ensemble with negative correlation

    增量構造負相關異構神經網路集成的方法
  5. This paper takes the example for hulunbeier league, uses qualitative and quantitative methods, probes the following problems : estimation and disposal on investment cost and running expenses of grassland construction investment project estimation of project earnings principles of project borrowings and appliances of financial appraisal indexes and financial statements. based on the above research, conclusions are as following : if previous project period is longer than that of milti - year increment herbage, fixed investment must be considered which is resulted from renewed herbage when cost is estimated ; changes of period of operating cost resulted from renewed herbage and output changes must be considered when cost being estimated ; periodical output changes of herbage not only lead to cost changes, but also changes in project incremental income and relative cost indirectly ; devising suitable project borrowings is beneficial to favorable implementation on every project ; aiming for the characters of grassland construction investment project, selecting practicable financial appraisal statements and financial indexes can make calculating of financial beneficial of grassland construction project scientifically

    本文的研究主要以呼倫貝爾盟草地建設項目為例,基於案例進行定量和比較分析,探討草地建設項目在投資成本和營運成本的估價和處理、項目收益的估價、項目籌資方案的確定原則和項目財務評價指標與評價報表應用方面的特殊問題,得出如下結論:必須在成本估價時考慮牧草的更新所導致的固定投資;在進行成本估價時必須考慮由於牧草的更新和產出變化所導致的經營成本周期性的不同;多年生牧草在產出上的周期性變化不僅會導致成本上發生變化,也會導致項目新增收入的變化和與收入相關的成本間接發生變化;設計合情合理的籌資方案,有利於保證項目中的每一個子項目順利執行;針對草地建設投資項目的特點,選擇適用的財務評價報表和財務評價指標才能更科學地測算草地建設項目的財務效益。
  6. Mid - point incremental method and initial stress method are used to reflect the nonlinear of the material ' s stress and strain. at the same time, the process of load during construction is simulated

    用中點增量法結合初應力法反映築壩材料的應力應變非線性,計算時模擬壩體施工加載過程。
  7. We give two kinds of lattice construction algorithms : batch algorithms and incremental algorithms. the details of classical batch algorithms, such as bordat and chein algorithms, and classical incremental algorithms such as gordin algorithms are introduced

    給出了兩類概念格的建造演算法,即批處理演算法和漸進式構造演算法,並就經典的批處理演算法如bordat , chein演算法,經典的漸進式構造演算法如gordin演算法做了詳細介紹。
分享友人